DOW JONES NEWSWIRES
The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
Tesoro Corp. (TSO) restarted units at its 94,000 barrel-a-day refinery in Hawaii Wedensday is bringing them to planned operating rates, the company said. Tesoro had shut down unspecified process units at the refinery Monday after a piping component failure.
PBF Energy Company LLC said it reduced the production rate of a key gasoline-making unit Aug. 15 at its 170,000-barrel-a-day Toledo refinery for up to four days while it performs maintenance work, according to a notice filed with Ohio regulators.
Valero Energy Corp. (VLO) said Aug. 15 that all production units remained shut down at its 195,000-barrel-a-day refinery in Memphis, Tenn., which was forced to shut down after an Aug. 5 fire. It couldn't estimate when it would restart units, a spokesman said.
ConocoPhillips (COP) said on Aug. 11 it was planning to repair the transistors at its 247,000 barrel-a-day refinery in Sweeny, Texas, which could effect the refinery's FCCU, according to a government filing.
Irving Oil said its 300,000 barrel-a-day refinery in Saint John, New Brunswick, Canada, had a "minor upset" on Aug. 11 that did not effect supply.
ConocoPhillips said on Aug. 9 its 195,000 barrel-a-day refinery in Ponca City, Okla., was restarting after a storm-related power outage on Monday.
Western Refining (WNR) said on Aug. 9 that its 125,000 barrel-a-day refinery in El Paso, Texas, was at normal processing rates after a power outage on Sunday forced a shutdown of the FCCU.
Motiva Enterprises LLC said on Aug. 6 that the hydrocracker at its 233,500 barrel-a-day refinery in Norco, La., was shut down because of unspecified reasons.
Alon USA Energy Inc. (ALJ) said Aug. 4 a compressor trip forced the shutdown of the FCCU at its 67,000 barrel-a-day refinery in Big Spring, Texas.
BP Plc (BP) shut one of three crude units at its 405,000 barrel-a-day refinery in Whiting, Ind., for unplanned repairs, a person familiar with operations said Aug. 3.
ExxonMobil Corp. (XOM) on July 30 reported emissions at its huge Baytown, Texas, oil refinery during the planned shutdown of Hydrofining Unit 3, which removes impurities from reformer feedstocks. The unit was in the process of shutting down as planned Saturday when an associated tower overpressured, releasing emissions to the flare system, the company said in a report to Texas state environmental regulators. The report did not state the reason for the unit's shutdown or how long it will be out of service.
Alon USA Energy Inc. (ALJ) recently began turnaround maintenance at a key gasoline-making unit at its oil refinery in Big Spring, Texas, a report to Texas state environmental regulators made public on July 25 said. The date of the unit's return to normal service wasn't provided.
For more detailed information, search Dow Jones Newswires using the code N/REF. Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA CARIBBEAN EAST COAST GULF COAST Alon Big Spring 67.0 FCCU down after compressor trip. TX Conoco- Sweeny, TX 247.0 Transistor repair may effect Phillips FCCU, company said Aug. 11. Exxon Baytown, TX 560.6 Upsets at two FCCUs results in Mobil flaring on July 16. Status of units unclear. Motiva Norco, LA. 233.5 HCU down for repair for unknown reason, company said Aug. 6. Total Port Arthur 232.0 Several unspecified process units USA TX restarted on July 26 after light- ning strike earlier on 7/16 shut them down. MIDWEST PBF Toledo, OH 170.0 Reduced rate of FCCU Aug. 15 for up to four days for planned replacement of boiler parts. BP Whiting, IN 405.0 Crude unit shut down Aug. 3. for unplanned repair. Exxon Channanhon, 238.6 July 24 equipment malfunction Mobil IL (Joliet) and emissions confirmed by Co. on 7/25. No further details provided. Valero Memphis, TN 195.0 Fire on Aug. 5 shuts down two CDUs. As of Aug. 10 Co. has no estimate when production will return. ROCKIES Exxon Billings, 60.0 Production at minimum rates due MT to ruptured Silvertip Pipeline. Company looking for alternative crude sources, to co. said on July 5. WEST COAST PLANNED CANADA North St. John's 115.0 Refinery in restart on July 29. End of Atlantic Plant-wide maintenance began in July early May and was extended on July 5. CARIBBEAN EAST COAST GULF COAST Alon Big Spring 67.0 FCCU turnaround maintenance under- TX way, a filing to environmental reg- ulators made public on July 24 said Conoco Borger, TX 146.0 Planned maintenance of Unit 29 July 16 electrostatic precipitators start- ing July 6. Exxon Baytown, TX 560.0 The planned shutdown of hydro- N/A Mobil finer unit 3 caused emissions on; July 30 reason for unit shutdown not clear; restart information not available. Motiva Port Arthur 285.0 Expansion project to increase 1Q TX throughput capacity by 325,000 2012 b/d, to 610,000-b/d, slowed. Completion now seen 1Q 2012, from 2010. Valero Corpus 315.0 Crude & coker unit turnaround Oct. to start in Oct. for three 2011 weeks. Valero McKee TX 170.0 Crude Unit and FCCU to undergo 3Q 2011 turnaround maintenance for six weeks starting in Oct. 2011, the co. said on July 26. Vacuum unit turnaround planned for first half of 2012, co. said. Expansion project announced March 2011 to increase crude oil throughput by 25,000 b/d to 195,000 b/d. Valero Norco, LA 185.0 Hydrocracker project will pro- 2013 ceed and be completed in late 2013, the co. said on 7/27/10. Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4Q 2012. Valero Port Arthur 325.0 Hydrocracker project will pro- 2012 TX ceed and be completed in late 2012. MIDWEST BP Whiting, IN 405.0 Turnaround at Pipestill 12 de- layed by 3 months; it was sup- posed to begin in November, a source said on Mar 25. Cenovus Roxana, IL 306.0 Coker and refinery expansion Q4 2011 (Conoco/WRB) project on track for comple- tion 4thQ 2011, the co. said on July 26, 2011. CVR Coffeyville 115.7 Periodic turnaround will take 2012 KS place in two phases beginning in Fall 2011 and completed in Spring 2012. Husky Lima, OH 160.0 15-day isocracker maintenance to Energy replace reactor catalyst will be- gin in 3rd Q 2011. Refinery will operate at 90% of capacity during that time. 15-days of maintenance planned Autumn at aromatics unit in the fall 2012 of 2012. Husky Toledo, OH 140.0 Isocracker maintenance and gen- Energy eral maintenance for 38 days will commence in Q3 2011, the Co. said on July 28. Minor maintenance planned in 4Q 2011, the co. said on July 28; no details provided. Tesoro Mandan, ND 58.0 Total crude-oil processing capa- 2nd Q city to increase by 17% to 68,000 2012 b/d by 2nd quarter 2012. WEST COAST
1 Year CVR Energy Chart |
1 Month CVR Energy Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions