![](/cdn/assets/images/search/clock.png)
We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
CVR Energy Inc | NYSE:CVI | NYSE | Common Stock |
Price Change | % Change | Share Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|
0.17 | 0.69% | 24.98 | 25.00 | 24.42 | 24.72 | 91,340 | 15:08:20 |
DOW JONES NEWSWIRES
The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
ExxonMobil's (XOM) Torrance, Calif., refinery may flare between June 4 and 13; the event is not due to equipment breakdown, the company said in a filing to Calif. environmental regulators.
Phillips 66 (PSX) reporting flaring Friday after the restart of an unspecified unit at its refinery in Rodeo, Calif., the company said in a report to California state environmental regulators.
BP Plc has restarted production at its Cherry Point refinery in Blaine, Washington, after months of maintenace work, a source familiar with the refinery said May 29.
Motiva Enterprises LLC reported an upset of unspecified equipment May 28 at its refinery in Port Arhtur, Texas, according to a government filing. The newly expanded refinery is running at 500,000 barrels a day, or 80% of capacity, a source familiar with the facility said.
Suncor Energy Inc. (SU) experienced a FCCU malfunction May 28 at its refinery in Commerce City, Colo., according to a government filing. The unit is down for repair until further notice, the company said.
Phillips 66 said a hole in the furnace at its refinery at Borger, Texas, caused at release of 100 pounds of hydrogen sulfide on May 25, according to a government filing.
Motiva Enterprises LLC reported a mechanical problem May 25 at its refinery in Convent, La., according to a government filing. The problem was "due to an H-Oil upset," according to the filing with the Natioinal Repsonse Center.
BP PLC (BP, BP.LN) on May 24 began the process of shutting down the same key gasoline-making fluid catalytic cracking unit, or FCCU, that began restarting three days earlier after five months of down time.
Exxon Mobil Corp. (XOM) said May 20 the coker unit at its refinery in Beaumont, Texas, had returned to normal operations.
Citgo Petroleum Corp. on April 29 that it would perform 30 days of planned maintenance at its refinery in Lemont, Ill., but no details were provided.
Valero Energy Corp. on May 16 said the alkylation unit and FCCU at its Meraux, La., refinery are in restart and will be operating at normal rates by June 1. The units had been down since January as part of planned maintenance turnaround.
Also on May 15, Delek said its El Dorado, Arkansas, refinery has been operating at reduced rates since May 1 due to the temporary suspension of crude oil deliveries from its supplier Exxon Mobil. The company has secured additional feedstocks that should allow the refinery to average total throughput of at least 60,000 barrels a day during May and June, which is down from its boiler-plate capacity of 70,000 barrels a day.
For more detailed information, search Dow Jones Newswires using the code N/REF.
Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA CARIBBEAN EAST COAST MIDWEST Delek El Dorado 70.0 Rates reduced by 10K b/d due crude oil delivery suspension by Exxon Mobil. Additional supply has been secured, the co. said on May 15. GULF COAST Delek Tyler, TX 62.0 Rates reduced to 45k-50K b/d until end-May while repairs continue at FCCU shut by May 7 power failure, the co.said on May 15. Motiva Port Arthur 600.0 Refinery is running at 80% capacity TX and will ramp up further in coming weeks. Motiva reported unspecified unit upset on May. 28. Phillips Borger, TX 146.0 Company reported flaring on May 25 66 becaues of a hole in furnace. BP Texas City, 475.0 BP took down FCCU several days TX after restart, according to May 24 filing. MIDWEST ROCKIES Suncor Commerce 94.0 FCCU down because of problem City, CO. with compressor. No restart date given. WEST COAST Phillips Rodeo, CA 76.0 Flaring due to restart of 66 unspecified unit, company said on May 31. BP Ferndale, 230.0 Restart process concluded WA at the end of May. The refinery shut on Feb 17 due to crude unit fire. PLANNED CANADA Husky Saskatchewan 21-days maintenance set in 1stH Upgrader first half 2012 at hydrogen 2012 plant, the co. said on Feb 9. Husky Saskatchewan Major turnaround to take place Spring Refinery in spring of 2013. Plant-wide 2013 shutdown for inspection and equipment repairs. CARIBBEAN HOVENSA St. Croix 350.0 Refinery shutdown completed, the Feb 21 co. said on Feb. 21. The facility 2012 will be operated as a products storage terminal. Valero Aruba 235.0 Operations will be suspended at the end of March due to eco- nomics, the co. said on Mar 19. EAST COAST Phillips Trainer, PA 185.0 Delta Airlines buys refinery 66 on April 30, 2012. Operations were idled on Sept. 30, 2011 for economic reasons. PBF Delaware City 190.0 Planned work currently under way Energy DE the co. said on May 7. Scope and duration not disclosed. Sunoco Philadelphia 335.0 Energy Partners buys Sunoco Inc.; PA deal to close 4Q 2012. Sunoco Marcus Hook 190.0 Marcus Hook shut Dec. 1 ahead of schedule due to poor refining econo- economics. GULF COAST BP Texas City 406.6 FCCU No. 3 and Alkylation unit N/A TX down for routine maintenance that began around Jan. 5 continues, a person familiar with the refinery said on May 11. Restart estimate not available. Flint Corpus 300.0 Coker unit maintenance combined Hills Christi TX with hydrocracker unit restart to cause emissions and flaring on May 12. Holly Artesia, NM 100.0 Crude runs will be reduced by Early Frontier 50% during 30 days of major turn- 2012 maintenance in early 2012, the Co. said on Aug. 5. Phillips Belle Chasse 247.0 Refinery up for sale a 66 LA Nov. 29 Bloomberg News report said. Valero McKee TX 170.0 FCCU in restart after turnaround May 11 that began on Mar 31 the co. said on May 11. Vacuum unit turnaround planned in first half of 2012, company said. Expansion project announced March 2011 to increase crude oil throughput by 25,000 b/d to 195,000 b/d. Valero Meraux, LA 135.0 Co. on May 16 said the alky and June 1 FCCU shut Jan 2 for turnaround are restarting and at normal rates by June 1. Valero Norco, LA 185.0 Hydrocracker project will pro- 2013 ceed and be completed in late 2013, the co. said on 7/27/10. Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4Q 2012. Valero Port Arthur 325.0 Hydrocracker project will pro- 2012 TX ceed and be completed in late 2012. MIDWEST Citgo Lemont, IL 167.0 FCCU restarted on May 17; unclear May 17 when unit shut down. Equipment failure and emissions reported on May 10. Portion of refinery shut for May 29 30 days of planned maintenance, on Apr 29 the co. said. No details provided. CVR Wynnewood 54.0 30-40 days maintenance planned Q3 OK in 3rd Q 2013, the co. said on 2013 Nov. 3, 2011. Holly Tulsa, OK 125.0 The entire refinery will be shut Late Frontier while West Plant section under- 2012 goes major turnaround maintenance in late 2012, the Co. said on Aug. 5, 2011. Husky Lima, OH 160.0 15-days of maintenance at diesel 4Q Energy hydrotreater; 29-day at aromatics 2012 unit set for 4Q 2012, the co. on Feb 9. New 20,000-b/d kerosene hydro- 1stH treater will start up in 1st 2013 half 2013, to co. said on Feb 9, 2012. 45-days of major turnaround scheduled in 2014; 70% of units involved. Remaining 30% will under go major turnaround in 2015, the co. said on Feb 9, 2012. Husky Toledo, OH 140.0 Minor turnaround planned in mid- mid-2012 Energy 2012; the partial outage will last about 21 days, the co. said on Feb. 9. Tesoro Mandan, ND 58.0 Total crude-oil processing capa- 2nd Q city to increase by 17% to 68,000 2012 b/d by 2nd quarter 2012. ROCKIES WEST COAST Alon Bakersfield 14.5 Hydrocraker Unit to restart Mid-May CA mid-May traders said on May 4. BP Carson, CA 265.0 Planned flaring may occur May 15-21; not associated with equipment breakdown- filing. Chevron Richmond 246.0 Source on May 14 said units in- May 28 CA volved in May 12 planned shutdown include FCCU and hydrotreater. Work to last for two weeks. Exxon Torrance 155.0 Flaring may be visible between Mobil CA June 4-13; not due to equip- ment breakdown, to co. said. Shell Martinez 156.4 Scheduled work (unspecified) CA is underway, the co. said on Apr 27. Traders said crude and coker unit involved; end date not provided. Tesoro Martinez 166.0 Hydrocracker has been shut for May 11- two weeks of maintenance, traders 13 said on May 2.
1 Year CVR Energy Chart |
1 Month CVR Energy Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions