![](/cdn/assets/images/search/clock.png)
We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
CVR Energy Inc | NYSE:CVI | NYSE | Common Stock |
Price Change | % Change | Share Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|
0.12 | 0.48% | 24.93 | 25.07 | 24.42 | 24.72 | 560,109 | 18:44:12 |
The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
Exxon Mobil Corp (XOM) reported flaring July 1 at its 238,600 barrel-a-day refinery in Joliet, Ill., according to a government filing made public July 2.
BP PLC (BP) said a continuing problem at its 405,000-barrel-a-day refinery in Whiting, Ind., caused emissions July 1, according to a government filing made public July 2.
ExxonMobil reported a July 30 shutdown of the hydrocracker unit at its 560,640 barrel-a-day refinery in Baytown, Texas, according to a filing with state regulators made public July 1.
Chevron Corp. (CVX) said on June 30 it restarted the crude-distillation unit at its 330,000 barrel-a-day refinery in Pascagoula, Miss.The unit had been shut down after a fire on May 9.
Valero Energy Corp. (VLO) is performing unplanned maintenance on the vacuum jet compressor in the eastern part of its 115,000 barrel-a-day refinery in Corpus Christi, Texas, according to a government filing made public June 30.
Chevron Corp. (CVX) reported a compressor trip on June 29 at its refinery in Pascagoula, Miss., according to a government filing made public Thursday.
Husky Energy Inc.(HUSKF, HSE.T) shut its 150,000 barrel-a-day refinery in Lima, Ohio, for up to 10 days to repair a leak in the crude distillation unit furnace, the company said June 28.
Alon USA Energy Inc. (ALJ) was restarting the FCC unit on June 28 at its Big Spring refinery in Texas, according to a filing with state regulators. The 67,000 barrel-a-day refinery, which had been undergoing maintenance that started on June 17, also experienced a power outage on June 20.
CVR Energy Inc. (CVI) shut down units at its 115,000 barrel-a-day refinery in Coffeyville, Ka., on June 27, according to a government filing made public June 28.
Sunoco Inc. (SUN) was restarting the reformer and hydrotreater at its 335,000 barrel-a-day refinery in Philadelphia, Penn., after starting unplanned maintenance on the units that started on June 19.
ConocoPhillps said on June 27 its 306,000 barrel-a-day Wood River refinery in Roxana, Ill., would run at reduced rates "for several days" after a power outage the previous weekend.
ExxonMobil reported a furnace outage on June 24 at its 240,000 barrel-a-day refinery in Joliet, Ill., accoridng to a government filing. The Joliet refinery had cut production during the previous week because of a similar problem, according to a government filing.
BP said on June 21 its 475,000 barrel-a-day refinery in Texas City, Texas, would return to full capacity by August after an April power outage left it running at half capacity.
For more detailed information, search Dow Jones Newswires using the code N/REF. Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA CARIBBEAN Valero Aruba 235.0 Refinery returning to planned rates after June 9 power outage, company said June 22. EAST COAST Conoco Linden, NJ 238.0 Refinery resumed normal rates June 14 after a furnace fire at crude unit June 1, the co. said on June 14. Sunoco Philadelphia, 335.0 Company attempted restarts of PA. reformer and hydrotreater on June 27. GULF COAST Alon Big Spring, 67.0 Power outage on June 20 because TX of wildfire. Company trying to restart. BP Texas City 437.0 FCCU-1 shut unplanned on June 13; N/A TX no estimate for restart, a source said on June 14. FCCU-3 at planned rates on June June 11 13 after weekend restart. Unit shut on June 7 for 48-hours maintenance to wet gas scrubber. Refinery should return to full capacity in August after April power outage reduced rates. Chevron Pascagoula 330.0 Crude unit restarted June 30 after MS being shut down because of a fire on May 10, company said. Exxon Baytown, TX 560.6 Hydrocracker down because of leak, according to a July 1 filing. Shell Deer Park, 327.0 Flaring at coker unit on June 13 TX reported flaring at coker unit; impact on operations unclear. Valero Port Arthur 285.0 Plant returning to planned rates TX on June 22 after June 6 power failure resulted in the shut down of a coker unit. Crude throughput and production had been reduced since June 6. MIDWEST BP Whiting, Ind. 405.0 Continuing problems caused emissions July 1. Exxon Joliet, IL 238.6 Sulfur furnace being repaired as of June 20. Impact on operations unknown. Reported flaring July 1. CVR Coffeyville, 115.0 Unspecified units taken down for Energy KS repair on June 27. Frontier El Dorado, 130.0 Sulfur recover unit failure re- KS sults in emissions, a filing to statue regulators on June 19 said. Impact on operations un- clear. ROCKIES WEST COAST Conoco Rodeo, CA 76.0 An unspecfifed unit startup resulted in emissions June 21. Valero Wilmington 135.0 Unplanned flaring between June CA 13-18 will have no impact on production, the company said on June 15. PLANNED CANADA CARIBBEAN EAST COAST GULF COAST Alon Big Spring 67.0 Planned turnaround maintenance TX causes excess opacity, a filing said on June 20. Motiva Port Arthur 285.0 Expansion project to increase 1Q throughput capacity by 325,000 2012 b/d, to 610,000-b/d, slowed. Completion now seen 1Q 2012, from 2010. Valero Corpus Christi 142.0 Coker brought down for planned TX maintenance, company said in May 25 government filing. Valero McKee TX 170.0 Vacuum unit turnaround planned for first half of 2012, co. said. Expansion project announced on March 2011 to increase crude oil throughput by 25,000 b/d to 195,000 b/d. Valero Norco, LA 185.0 Hydrocracker project will pro- 2013 ceed and be completed in late 2013, the co. said on 7/27/10. Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4Q 2012. Valero Port Arthur 325.0 Hydrocracker project will pro- 2012 TX ceed and be completed in late 2012. MIDWEST BP Whiting, IN 405.0 Turnaround at Pipestill 12 de- layed by 3 months; it was sup- posed to begin in November, a source said on Mar 25. CVR Coffeyville 115.7 Periodic turnaround will take place KS in two phases beginning in Fall 2011 and completed in Spring 2012. Tesoro Mandan, ND 58.0 Total crude-oil processing capa- 2nd Q city to increase by 17% to 68,000 2012 b/d by 2nd quarter 2012. WEST COAST
1 Year CVR Energy Chart |
1 Month CVR Energy Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions