ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

BLDP Ballard Power Systems Inc

2.83
0.10 (3.66%)
04 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Ballard Power Systems Inc NASDAQ:BLDP NASDAQ Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.10 3.66% 2.83 2.25 3.77 2.88 2.775 2.78 2,600,393 05:00:09

Ballard Announces Order for Modules to Power Scotland's First Fuel Cell-Powered Train

12/01/2021 1:30pm

PR Newswire (Canada)


Ballard Power Systems (NASDAQ:BLDP)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Ballard Power Systems Charts.

VANCOUVER, BC, Jan. 12, 2021 /CNW/ - Ballard Power Systems (NASDAQ: BLDP) (TSX: BLDP) today announced a purchase order from Arcola Energy ("Arcola"; www.arcolaenergy.com), a U.K.-based leader in hydrogen and fuel cell integration specializing in zero-emission solutions for heavy-duty vehicles and transport applications, for Ballard FCmoveTM-HD fuel cell modules to power a passenger train planned for demonstration during COP26, to be hosted by Glasgow City in November 2021. This project will contribute to Scotland's goal for net zero emissions by 2035. 

Class 314 car passenger train (CNW Group/Ballard Power Systems Inc.)

Scottish Enterprise, Transport Scotland and the Hydrogen Accelerator, based at the University of St. Andrews, have appointed Arcola and a consortium of industry leaders in hydrogen fuel cell integration, rail engineering and functional safety to deliver Scotland's first hydrogen-powered train. The consortium will convert a Class 314 car passenger train, made available by ScotRail, into a deployment-ready and certified platform for hydrogen-powered train development. The Bo'ness and Kinneil Railway will provide engineering facilities and support for testing and public demonstrations.

Dr. Ben Todd, CEO of Arcola Energy said, "Hydrogen traction power offers a safe, reliable and zero-carbon alternative for Scotland's rail network. The hydrogen train project is an excellent opportunity for industry leaders in hydrogen, rail engineering and safety to collaborate with Scottish and other technology providers to develop a deployment ready solution."

Rob Campbell, Ballard Chief Commercial Officer noted, "Ballard is delighted to work with Arcola and other consortium members on the development of Scotland's first fuel cell-powered train. This project is an example of the growing global interest in fuel cells for the Medium- and Heavy-Duty Motive market, including rail applications, where heavy payload, long range and rapid refueling are key customer requirements."

About Ballard Power Systems
Ballard Power Systems' (NASDAQ: BLDP; TSX: BLDP) vision is to deliver fuel cell power for a sustainable planet. Ballard zero-emission PEM fuel cells are enabling electrification of mobility, including buses, commercial trucks, trains, marine vessels, passenger cars and forklift trucks. To learn more about Ballard, please visit www.ballard.com.

This release contains forward-looking statements concerning anticipated market adoption of fuel cell products. These forward-looking statements reflect Ballard's current expectations as contemplated under section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Any such forward-looking statements are based on Ballard's assumptions relating to its financial forecasts and expectations regarding its product development efforts, manufacturing capacity, and market demand.

These statements involve risks and uncertainties that may cause Ballard's actual results to be materially different, including general economic and regulatory changes, detrimental reliance on third parties, successfully achieving our business plans and achieving and sustaining profitability. For a detailed discussion of these and other risk factors that could affect Ballard's future performance, please refer to Ballard's most recent Annual Information Form. Readers should not place undue reliance on Ballard's forward-looking statements and Ballard assumes no obligation to update or release any revisions to these forward-looking statements, other than as required under applicable legislation.

Cision View original content to download multimedia:http://www.prnewswire.com/news-releases/ballard-announces-order-for-modules-to-power-scotlands-first-fuel-cell-powered-train-301206394.html

SOURCE Ballard Power Systems Inc.

Copyright 2021 Canada NewsWire

1 Year Ballard Power Systems Chart

1 Year Ballard Power Systems Chart

1 Month Ballard Power Systems Chart

1 Month Ballard Power Systems Chart

Your Recent History

Delayed Upgrade Clock