ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

NEX Nexans

106.30
-0.10 (-0.09%)
Last Updated: 08:00:29
Delayed by 15 minutes
Share Name Share Symbol Market Type
Nexans EU:NEX Euronext Ordinary Share
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  -0.10 -0.09% 106.30 106.30 106.40 106.30 106.30 106.30 1,298 08:00:29

Nexans secures first call-off under TenneT framework agreement

19/03/2024 6:01pm

GlobeNewswire Inc.


Nexans (EU:NEX)
Historical Stock Chart


From Mar 2024 to Jun 2024

Click Here for more Nexans Charts.
Nexans secures first call-off under TenneT framework agreement

Nexans secures first call-off under TenneT framework agreement

_PRESS RELEASE_

  • Nexans secures first call-off under 2GW TenneT framework agreement
  • The project involves the EPCI of HVDC cables for the BalWin3 and LanWin4 offshore grid connection systems. Transmitting in total 4 Gigawatts (GW) of offshore wind energy from the North Sea to Wilhelmshaven in Germany (Lower Saxony).
  • This key project reinforces Nexans’ position as a leader in the European offshore wind market

Paris, 19 March 2024 – Nexans, leader in the design and manufacturing of cable systems and services has secured the first call-off under the TenneT framework agreement awarded in April 2023.

This project involves the Engineering, Procurement, Construction, and Installation (EPCI) of high-voltage direct current (HVDC) cables for the BalWin3 and LanWin4 grid connection systems. Transmitting in total 4 Gigawatts (GW) of offshore wind energy from the North Sea to Wilhelmshaven in Germany (Lower Saxony).

Nexans will be utilizing its new 525 kV HVDC XLPE cable technology and implementing an innovative "four bundle" cable laying method for the first time in the Group’s history for the project installed by its new cable laying vessel.

Pascal Radue, EVP of Nexans’ Generation and Transmission Business Group says, “This win strengthens our position as a leader in Europe's energy transition, and we're proud to partner with TenneT in building a sustainable future.”

About Nexans

For over a century, Nexans has played a crucial role in the electrification of the planet and is committed to electrifying the future. With approximately 28,500 people in 41 countries, the Group is paving the way to a new world of safe, sustainable and decarbonized electricity that is accessible to everyone. In 2023, Nexans generated 6.5 billion euros in standard sales. The Group is a leader in the design and manufacturing of cable systems and services across four main business areas: Power Generation & Transmission, Distribution, Usage and Industry & Solutions. Nexans was the first company in its industry to create a Foundation supporting sustainable initiatives, bringing access to energy to disadvantaged communities worldwide. The Group is recognized on the CDP Climate Change A List as a global leader on climate action and has committed to Net-Zero emissions by 2050 aligned with the Science Based Targets initiative (SBTi).

Nexans. Electrify the future.

Nexans is listed on Euronext Paris, compartment A.For more information, please visit www.nexans.com

Contacts:

Communication Mael Evin (Havas Paris) Tel.: +33 (0)6 44 12 14 91nexans_h@havas.com Emmanuel Guinotemmanuel.guinot@nexans.com Maëllys Leosticmaellys.leostic@nexans.comInvestor relations Elodie Robbe-MouillotTel.: +33 (0)1 78 15 03 87elodie.robbe-mouillot@nexans.com

Attachment

  • 2024-03-19_pr-Nexans secures first call-off under TenneT framework agreement

1 Year Nexans Chart

1 Year Nexans Chart

1 Month Nexans Chart

1 Month Nexans Chart

Your Recent History

Delayed Upgrade Clock