ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

ALO Alstom

15.555
0.01 (0.06%)
03 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Alstom EU:ALO Euronext Ordinary Share
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.01 0.06% 15.555 15.50 15.72 15.955 15.505 15.625 1,047,997 16:40:00

ALSTOM SA : Alstom-led consortium to deliver innovative integrated system for Taipei’s fully automated metro line

30/09/2021 6:46am

GlobeNewswire Inc.


Alstom (EU:ALO)
Historical Stock Chart


From May 2021 to May 2024

Click Here for more Alstom Charts.
ALSTOM SA : Alstom-led consortium to deliver innovative integrated system for Taipei’s fully automated metro line

Alstom-led consortium to deliver innovative integrated system for Taipei’s fully automated metro line

  • Alstom to provide rolling stock, signalling, platform screen door solutions together with the project management and overall system integration
  • Taipei Circular Line is the consortium’s second turnkey metro project successfully secured by Alstom in Taiwan recently
  • The framework contract includes an order option to supply the line’s Phase Three system

[Embargo until 30 september 2021 - 7h45 am] – The Alstom-led consortium with Taiwanese engineering and contracting services company CTCI has been awarded a contract by the Systemwide E&M Project Office Department of Rapid Transit Systems of Taipei City Government (SEMPO) to provide its state-of-the-art integrated metro system for Taipei Circular Line Phase Two. Valued close to €720 million, this order for the city’s fully automated (Grade of Automation 4) metro line marks the recent consortium’s second turnkey metro project in Taiwan after the Wanda-Zhonghe-Shulin Line. Under the contract with its share at over €430 million1, Alstom will also renew the signalling system for Phase One of the Circular Line2. The framework contract includes an order option to supply the line’s Phase Three system.

Phase Two of the Circular Line comprises a north and a south section, which spans 14.93 km with 12 underground stations and one depot, and 5.73 km with six underground stations, respectively.

Alstom will be responsible for 29 fully-automated four-car Metropolis trains, Urbalis 400 Communications-Based Train Control (CBTC) signalling system, Supervisory Control and Data Acquisition (SCADA) system, and Platform Screen Doors (PSD). CTCI will lead for the track work, power supply, depot equipment, telecommunication and ticketing systems. The project involves overhauling the existing CBTC signalling system during the limited engineering hours, to minimise the impact on passenger service.

“This contract with SEMPO is a vote of confidence in our internationally proven and quality mobility offering, and a testament to our team’s hard work over the last four decades towards making rail transport even more sustainable for the capital city of Taiwan. It also cements our position as the sole signalling supplier for the entire Metro Taipei network. Overall, this is an example of how the Asia-Pacific market remains dynamic and we aim to maintain our market leadership across most segments.” said Ling Fang, President of Alstom in Asia Pacific.

Alstom’s industrial units in Taubaté, Brazil (rolling stock), and Bologna, Italy (signalling) will participate in the Circular Line project, supported by sites in Bangalore, India, Saint-Ouen, Le Creusot, Ornans, France and Taipei, Taiwan. The project management and system integration will be managed locally with the support of Alstom’s Turnkey engineering centre.

Alstom is a trusted partner to deliver integrated Turnkey rail systems for every mobility need. Alstom has earned a global leadership position, amassing extensive experience in the successful design, construction, commissioning and delivery of over 80 turnkey systems in commercial service worldwide Singapore’s Circle Line and Panama Line 1 and 2 count among Alstom’s successes in integrated metro projects delivery, with the latest addition being the Dubai Metro Route 2020, inaugurated in July 2020.

Alstom also boasts at least 20 years of innovating driverless metros (GoA4) worldwide, with more than 600 such metros ordered. Its Asia Pacific region presently hosts 13 GoA4 metro systems in service, including, Delhi’s Grey Line, Hong Kong’s South Island Line (East), Kuala Lumpur’s Kajang Line, Singapore’s Thomson-East Coast Line, Sydney’s North West Metro and Taichung’s Green Line.

1 This amount has been recorded in the second quarter of Alstom’s 2021/2022 financial year.2 Phase One or the central section of the line, covering 14 stations and one depot over 15.4 km, has been in operation since January 2020.

Alstom™, Citadis™, Metropolis™ and Urbalis™ are protected trademarks of the Alstom Group

  About Alstom   
Leading societies to a low carbon future, Alstom develops and markets mobility solutions that provide the sustainable foundations for the future of transportation. Alstom’s product portfolio ranges from high-speed trains, metros, monorails and trams, to integrated systems, customised services, infrastructure, signalling, and digital mobility solutions. Alstom has 150,000 vehicles in commercial service worldwide. With Bombardier Transportation joining Alstom on January 29, 2021, the enlarged Group’s combined proforma revenue amounts to €14 billion for the 12-month period ended March 31, 2021. Headquartered in France, Alstom is now present in 70 countries and employs more than 70,000 people. www.alstom.com 
 
 ContactsPress:Coralie COLLET – Tel.: +33 (0)7 63 63 09 62 coralie.collet@alstomgroup.com Jane CHAN - Tel.: +65 9820 5447jane.chan@alstomgroup.comInvestor Relations:Julie MOREL - Tel.: +33 (6) 67 61 88 58Julie.morel@alstomgroup.com Claire LEPELLETIER – Tel.: +33 (6) 76 64 33 06claire.lepelletier@alstomgroup.com    

Attachment

  • 20210930_Taipei Circular Line Contract_Final_EN Update

1 Year Alstom Chart

1 Year Alstom Chart

1 Month Alstom Chart

1 Month Alstom Chart

Your Recent History

Delayed Upgrade Clock