ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

PLL Piedmont Lithium Limited

0.21
0.00 (0.00%)
07 May 2024 - Closed
Delayed by 20 minutes
Share Name Share Symbol Market Type
Piedmont Lithium Limited ASX:PLL Australian Stock Exchange Ordinary Share
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.21 0.21 0.21 0.00 22:02:51

Piedmont Increases Lithium Resources By 40%

08/04/2021 11:00am

Business Wire


Piedmont Lithium (ASX:PLL)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Piedmont Lithium Charts.
  • Piedmont Lithium Project’s Global Mineral Resources increased to 39.2 Mt @ 1.09% Li2O
  • Exploration and infill drilling continues with five rigs operating on the Core property
  • The updated resource base will underpin the Scoping Study update targeted for May 2021
  • A further resource update will precede the DFS scheduled for September 2021 release

Piedmont Lithium Limited (“Piedmont” or the “Company”) (Nasdaq:PLL; ASX:PLL) is pleased to announce an updated Global Mineral Resource estimate (“MRE”) (Table 1) for the Company’s flagship Piedmont Lithium Project in North Carolina, USA which includes updated Mineral Resource estimates from the Core and Central properties and an initial Mineral Resource estimate from the Huffstetler property (Table 2). The total MRE for the project is 39.2 Mt at 1.09% Li2O (Figure 1), with 55% of the MRE currently classified in the Indicated category. The Mineral Resource estimate is reported in accordance with JORC Code (2012 Edition).

Table 1: Piedmont Lithium Global Mineral Resources Estimate (MRE)

Resource Category

Tonnes (Mt)

Grade (Li2O%)

Li2O (t)

LCE (t)

Indicated

21.6

1.12

241,000

597,000

Inferred

17.6

1.03

181,000

449,000

Total

39.2

1.09

422,000

1,046,000

Keith D. Phillips, President and Chief Executive Officer, commented: “Increasing the scale of our North Carolina mineral resource to 39.2 Mt at 1.09% Li2O establishes our asset as one of the largest spodumene resources in North America – and the only one in the United States. The expanded resource offers the potential for increased annual lithium production, something we will evaluate as we prepare our updated Scoping Study for release next month. All this is coming together at an ideal time, as the public and private sectors dramatically increase their investment in the electrification of America. Given the scope and strategic location of our Piedmont Lithium Project, we believe we are ideally positioned to play a critical role in helping the United States build a clean energy economy and a U.S. based EV supply chain.”

To view the complete ASX Release, click here.

Keith D. Phillips President & CEO T: +1 973 809 0505 E: kphillips@piedmontlithium.com Brian Risinger Vice President – Corporate Communications T: +1 704 910 9688 E: brisinger@piedmontlithium.com

1 Year Piedmont Lithium Chart

1 Year Piedmont Lithium Chart

1 Month Piedmont Lithium Chart

1 Month Piedmont Lithium Chart

Your Recent History

Delayed Upgrade Clock