We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Casino Guichard Perrachon | AQEU:COP | Aquis Europe | Ordinary Share |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.029 | 1.21% | 2.4285 | 2.4015 | 2.449 | 2.4455 | 2.371 | 2.3915 | 14,876 | 16:15:55 |
The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
Sunoco Inc. (SUN) Wednesday restarted an alkylation unit at its Philadelphia refinery that was shut Monday.
For more detailed information, search Dow Jones Newswires using the code N/REF.
Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA EAST COAST Conoco Linden, NJ 238.0 Officials consider run cuts n/a due to slack demand, a per- son familiar with operations said on July 17 Sunoco Philadelphia, 340.0 Alkylation unit restarted Girard Point Sept 2 after shut for unplanned repairs Aug 31 due to a hydrocarbon release from a valve. CARIBBEAN GULF COAST Citgo Corpus 163.0 FCCU shut due to July 19 n/a Christi, TX Alkylation Unit fire. No restart estimate. A worker was injured during the event. Shut down hydrotreater Aug 15 Cut feeds to FCCU Aug 18 Exxon Baytown 573.0 Waste heat boiler back up Aug. Aug. 31 31 after shutting down Aug. 30 for repairs. The boiler closure cut rates at the associated flexi- coker. Exxon Beaumont 344.0 Restarting hydrocracker unit Aug 26 that was unexpectedly shut Aug 25. Marathon Texas City 76.0 Alky unit restarted on Aug. Aug 28 28 after shutting down on Aug. 27 owing to an alky- late leak that injured one contract worker. Total Port Arthur 232.0 Condensate splitter shut again Aug 22 after Aug 17 restart Process unit 838 was partially restarted Aug 22 after the loss of a hydrogen compressor reduced output Aug 17 Valero Port Arthur, 310.0 45,000-b/d Hydrocracker Aug. 31 unit in restart Aug 31; unit shut for unplanned maintenance the previous week. MIDWEST Frontier El Dorado 130.0 Reformer shut due to fire. Sep. 3 Kansas on Aug. 27; unit expected to restart by Sep 3. ROCKY MOUNTAINS WEST COAST ExxonMobil Torrance, CA 149.5 Restarting an unidentified refinery process unit Aug 26 that was shut down Aug 25. Valero Benicia, CA 144.0 Coker unit in restart, the Aug. 31 Co. said Aug. 31; the unit stopped processing crude due to repairs to the scrubber Aug 27. PLANNED CANADA CARIBBEAN Valero Aruba 235.0 The refinery that was shut in June for 2-3 months for economic reasons is being closed indefinitely. EAST COAST Sunoco Philadelphia, 340.0 Reformer unit shut in Girard n/a PA Point section in early Oct for economic reasons. Shutdown to last 1-6 months. One-month work on FCCU unit planned for 3Q. Valero Delaware 210.0 Maintenance at 80,000-b/d FCCU delayed until 2010 from September 2009. Western Yorktown 64.5 Planned work scheduled 1Q 2010. Va. GULF COAST Chevron Pascagoula, 330.0 Pre-commercial heavy oil 2010 Miss. conversion project delayed from 2008 to 2010 due to economic factors. Exxon Baytown, TX 567.0 FCCU No. 3 boiler shut n/a for planned work July 10; the work will have no impact on the company's ability to supply customers. Valero Norco, LA 185.0 The coker will operate at 50% of capacity when restarted due to poor economics. Flint Corpus 288.1 $250 mln project for new Spr Hills Christi, TX diesel desulfurization, 2010 sulfur recovery unit to begin in Fall 2008. Construction to last 18 months. Estimated restart of a Aug 21 CCR/NHT unit and a hydrocracker unit at the West Plant section Marathon Garyville 245.0 Project to increase crude oil 4Q LA refining capacity by 180,000- 2009 b/d 85% complete, as of end April. New units expected start up in 4Q 2009. Motiva Port Arthur 285.0 Expansion project to increase 1Q TX throughput capacity by 325,000 2012 b/d, to 610,000-b/d, slowed. Completion now seen 1Q 2012, from 2010. Valero Corpus 340.0 Coker unit shutdown for econo- n/a Christi, TX mic reasons and planned work; delayed to June 19 from June 12. The 20,000-b/d unit will remain off line through July but could restart at any time if margins improve. 20,000-b/d FCCU in East n/a Plant shut; West Plant 50,000-b/d FCCU at reduced rates since mid-Dec for economic reasons. Valero Norco, LA 250.0 Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4Q 2012. Valero Port Arthur 325.0 77,000-b/d FCCU at reduced n/a TX rates since mid-Dec for economic reasons. Valero Norco, LA Turnaround at coker unit 1Q delayed until 1Q 2010 from 4Q 2009. Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a rates since mid-Dec for economic reasons. Valero Three Rivers 95.0 24,000-b/d FCCU at reduced n/a TX rates since mid-Dec for economic reasons. Plant-wide 24-day turnaround Sep to begin in Sep, co last said on July 28. Western El Paso 122.0 Planned work scheduled for 1Q 2010. MID-WEST Frontier El Dorado 130.0 FCCU and hydrotreater will be Nov KS shut in Oct for turnaround maintenance that takes place every four years. A coker turnaround and expan- Mid- sion project was delayed until Aug. mid-July, and subsequently delayed until August. Marathon Detroit, MI 102.0 Co pushes back finish date Late 2012. for heavy oil project. Sunoco Toledo, OH 160.0 Planned work to last from early Aug to mid-Sep. Valero Memphis, TN 195.0 FCCU upgrade originally slated 2012 for completion in 2009 has been shifted to 2012. Alon Krotz Springs 80.0 Plantwide turnaround starts Jan. 21/22 La. Jan 1 to last 21 days. ROCKY MOUNTAINS Conoco Billings, 61.0 On Mar 5 the co delayed for Jan. MT one year an expansion project 2010
which will increase capacity to 71,000 bbls. Construction of a new crude unit is now scheduled to begin in January 2010. Frontier Cheyenne 52.0 The refinery is operating at n/a WY reduced rates for economic reasons. WEST COAST PetroStar Valdez, AK 48.0 Refinery shut due to Dec. Jun/Jul 28 fire; expected to re- 2010 start in June/July 2010. Alon Paramount 55.0 Hydrocracker project post- CA poned indefinitely, the Co. said on Feb. 4 Chevron Richmond, 243.0 Judge halts construction on n/a CA expansion project July 1. Flint North Pole 210.0 One of three processing n/a Hills AK units has been shut due to low jet fuel demand, co confirmed on Mar 19. Shell Martinez 155.0 Crude Unit and Coker Unit Aug 15 CA to shut for planned main- tenance on July 10; re- start seen Aug 15. Tesoro Wilmington, 97.0 39-days of turnaround main- CA tenance is planned for 4Q 2009. Valero Benicia, CA 144.0 Hydrocracker restarted Aug 8 over Aug 8-9 weekend; shut for planned repairs on Aug 3. New crude unit is now scheduled to start up Jan 2010.
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call 1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call 1-888-301-0513
Order free Annual Report for Chevron Corporation
Visit http://djnewswires.ar.wilink.com/?link=CVX or call 1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call 1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call 1-888-301-0513
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call 1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call 1-888-301-0513
Order free Annual Report for Chevron Corporation
Visit http://djnewswires.ar.wilink.com/?link=CVX or call 1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call 1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call 1-888-301-0513
1 Year Casino Guichard Perrachon Chart |
1 Month Casino Guichard Perrachon Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions