We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Name | Symbol | Market | Type |
---|---|---|---|
NYLI Merger Arbitrage ETF | AMEX:MNA | AMEX | Exchange Traded Fund |
Price Change | % Change | Price | High Price | Low Price | Open Price | Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|
0.0074 | 0.02% | 33.5574 | 33.57 | 33.49 | 33.49 | 3,274 | 15:34:35 |
RNS Number:2728O Monterrico Metals PLC 04 August 2003 Initial Resource Estimate at Rio Blanco Copper project in Peru London, 04 August 2003 : Monterrico Metals plc ("Monterrico") is pleased to announce that an independent estimate has been prepared by Snowden Mining Industry Consultants ("Snowden") in Canada for the Henry's Hill prospect at the company's 100% owned Rio Blanco Project. Snowden reports that Henry's Hill contains a combined (Indicated + Inferred) resource of 177 million tonnes grading 0.98% copper, at the 0.70% total copper cut off, containing approximately 1.7 million tonnes (3.8 billion pounds) of copper within a global resource of over 1 billion tonnes at 0.58% copper. Cut-off Combined Resource Indicated Resource Inferred Resource % Cu Tonnes Grade Tonnes Grade Tonnes Grade '000 % Cu '000 % Cu '000 % Cu 0.70 176,700 0.98 161,000 0.98 15,700 0.98 0.50 662,200 0.69 476,300 0.72 185,900 0.63 0.30 1,071,700 0.58 723,100 0.61 348,600 0.52 The resource at Henry's Hill includes a high-grade core within this larger mineralized envelope containing 65 million tonnes grading 1.26% copper. Furthermore the Henry's Hill target remains open in several directions and a follow-up program of infill drilling is designed to test the continuity and extensions of the copper mineralization in order to amplify and further qualify the resource. The resource statement will form an integral part of the pre-feasibility study that is due for completion in September 2003. This study will define the economics of a mining operation at Rio Blanco and determine a range of capital and operating costs for the operation. Chris Eager, Managing Director and CEO of Monterrico, stated: "Monterrico is delighted with the initial Mineral Resource Estimate, considering only part of this large porphyry system has been tested. In particular our confidence is bolstered by the amount of high-grade near surface secondary copper given its potential to enhance the economics of the project start-up. We are pleased to report that Monterrico is close to achieving its target of defining a resource of 200 million tonnes at 1% copper and we are confident of exceeding this target during feasibility drilling." Ends For further information: Chris Eager, Chief Executive, Monterrico Metals plc Tel: 020 7448 5088/ Mobile: 07903 158 301 Keith Irons, Bankside Consultants Tel: 020 7444 4155/ Mobile: 07885 356 639 Technical NOTE Monterrico has completed 31 widely spaced drill holes 13,987 metres at Henry's Hill. As the physical dimension of target area is 1.5km long and up to 600m wide, the approach has been to drill holes on a grid of 150 x 150 metres. This latest round of drilling, combined with the previous exploration by Cyprus-Amax (1996/98), has successfully elevated >90% of the resource estimate into the Indicated category (at 0.7% Cu cutoff). Snowden's Mineral Resource estimate for Henry's Hill has been determined in accordance with the JORC Code (1999) for Reporting on Mineral Resources and Ore Reserves. The resource estimate was carried out using ordinary kriging into domains based upon the copper oxidation state, which is known to be the primary control on the localisation of mineralisation. Snowden carried out the estimate within an interpreted 0.3% total copper envelope and within a similar soluble copper envelope, and estimated both total copper and soluble copper grades. Cut-off TOTAL Indicated Resource Inferred Resource % Cu Tonnes Grade Tonnes Grade Tonnes Grade '000 % Cu '000 % Cu '000 % Cu Soluble Copper Envelope 0.70 88,900 1.06 87,300 1.06 1,600 0.95 0.50 218,200 0.82 181,200 0.85 37,000 0.65 0.30 316,100 0.72 251,400 0.76 64,700 0.58 Total Copper Envelope 0.70 176,700 0.98 161,000 0.98 15,700 0.98 0.50 662,200 0.69 476,300 0.72 185,900 0.63 0.30 1,071,700 0.58 723,100 0.61 348,600 0.52 All drill core samples were assayed by SGS (Peru) S.A., an independent ISO 9002 certified laboratory located in Lima. ALS-Chemex prepared two certified standards and a blank that were used to ensure assay quality. The analytical method was a three acid (partial digestion) assay analysis for the copper with an atomic absorption finish. Monterrico's internal Drill Core Sampling and Analysis Protocols were employed to ensure sample handling integrity, quality assurance and quality control. The Competent Person who supervised the design and conduct of work performed at Rio Blanco was Geoffrey Keyte, Chief Geologist and Project Manager. This information is provided by RNS The company news service from the London Stock Exchange END MSCXXLLBXVBFBBK
1 Year NYLI Merger Arbitrage ETF Chart |
1 Month NYLI Merger Arbitrage ETF Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions