We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Name | Symbol | Market | Type |
---|---|---|---|
NYLI Merger Arbitrage ETF | AMEX:MNA | AMEX | Exchange Traded Fund |
Price Change | % Change | Price | High Price | Low Price | Open Price | Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|
0.08 | 0.24% | 33.55 | 33.57 | 33.48 | 33.49 | 13,760 | 01:00:00 |
RNS Number:6810T Monterrico Metals PLC 29 December 2003 Monterrico Metals plc First assay results from Rio Blanco Feasibility Study LONDON: 29 December 2003 - Monterrico Metals ("Monterrico" or the "Company") (MNA.L) is pleased to report the successful start-up of the Feasibility Study on it's 100% owned and operated Rio Blanco Copper Project in northern Peru ("Rio Blanco"). Drilling at Rio Blanco is now focused on defining a mineable reserve on the Eastern Slope of Henry's Hill. The objective is to convert in part the current indicated and inferred resource of 177 million tones @ 0.99% Cu into a proven and probable ore reserve. Monterrico is now drilling on an approximate 75m x 75m grid to quantify and qualify the distribution of the enriched (supergene) and primary (hypogene) copper mineralization. Assay results for the initial two holes of the proposed 20,000 metre infill program for the Feasibility Study are tabulated below. It is important to note both holes were terminated in mineralization. RB - 50 (290degrees / - degrees) From - to (m) Interval (m) Cu % Mo % Cu % equiv* Supergene ONLY 92 218 126.0 0.94 0.015 1.03 incl 174 204 30 1.48 0.014 1.57 Hypogene ONLY 218 411.5 193.5 0.51 0.016 0.61 incl. 228 276 48 0.71 0.021 0.84 Supergene + Hypogene 92 411.5 319.5 0.68 0.016 0.78 RB - 51 (250 degrees / - 65 degrees) From - to (m) Interval (m) Cu % Mo % Cu 5 equiv* Supergene ONLY 194 254 60 1.10 0.013 1.18 incl. 210 250 40 1.31 0.012 1.38 Hypogene ONLY 245 338.3 84.3 0.50 0.013 0.58 incl. 292 310 18 0.72 0.018 0.83 Supergen + Hypogene 194 338.3 144.3 0.75 0.013 0.83 * Copper equivalent grades have been calculated using current metal prices (US$1.00/lb. for copper and US$6.20/lb for molybdenum); %Cu equiv. = %Cu + %Mo x 6.2. Monterrico recently announced the results of the Pre-Feasibility Study to develop a large-scale, open cut mining and milling operation at Rio Blanco. The report demonstrated the technical and economic viability of processing 10 million tonnes of ore to produce 100,000 tonnes of copper in concentrate per year. This process also allows the recovery of valuable bi-products including molybdenum and silver. Monterrico is now assessing the grade of molybdenum and silver that may be recovered in parallel to producing the copper concentrate. The recovery and sale of molybdenum and silver in concentrate would result in additional revenues that would further improve the project economics. As result analysis of copper and molybdenum is now reported and the total copper equivalent grade quoted. The "Karina" exploration tunnel, driven along the 2,350m level, has been terminated at 322.4 meters midway across Henry's Hill. Monterrico earlier reported an interval of 90 meters @ 1.10% copper from the original 171 meters of advance. Laboratory results for the final 151.4 meter extension has received and include 60 meters at an average copper (only) grade of 1.23%. The contribution of molybdenum can be clearly seen as a valuable credit to the overall project economics. Tunnel KARINA From - to (m) Interval (m) Cu % Mo % Cu $ equiv* 28 322.4 294.4 0.91 0.014 1.00 ALL Supergene incl. 64 154 90 1.10 0.006 1.14 incl. 170 230 60 1.23 0.029 1.41 Monterrico recently raised GB#10.8 million, principally to fund the definitive Feasibility Study for Rio Blanco, which is scheduled for completion in early 2005. Mr Chris Eager, managing director, said "The first drill holes in the infill drilling campaign have further confirmed substantial widths of ore grade mineralization both in the enriched blanket and in the underlying primary zone. The scenario of building a concentrator at Rio Blanco has the advantage that we can factor in bi-product credits, increasing project revenues. Drilling deeper into the primary mineralization will increase Rio Blanco's resource base significantly". Ends For further information: Chris Eager, Chief Executive, Monterrico Metals plc Tel: 020 7448 5088/ Mobile: 07903 158 301 Keith Irons, Bankside Consultants Tel: 020 7444 4155/ Mobile: 07885 356 639 Richard Chase, Ambrian Partners, Tel: 020 8528 1456 This information is provided by RNS The company news service from the London Stock Exchange END DRLNKCKKKBDKDBB
1 Year NYLI Merger Arbitrage ETF Chart |
1 Month NYLI Merger Arbitrage ETF Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions