We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Ellomay Capital Ltd | AMEX:ELLO | AMEX | Common Stock |
Price Change | % Change | Share Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|
-0.32 | -2.52% | 12.39 | 12.39 | 11.48 | 12.39 | 129 | 18:03:01 |
Exhibit 99.1 |
|
Ellomay Capital Ltd.
By: /s/
Ran Fridrich
Ran Fridrich
Chief Executive Officer and Director
|
1. |
Reelection of Shlomo Nehama, Ran Fridrich, Anita Leviant and Ehud Gil as directors;
|
2. |
Reelection of Daniel Vaknin as an external director for a second three-year term;
|
3. |
Election of Dorit Ben Simon as an external director for a first three-year term;
|
4. |
Approval of the terms of service the external directors and update to the terms of service of non-executive directors;
|
5. |
Approval of grant of options to the external directors;
|
6. |
Approval of terms of service of Ehud Gil, a member of the Board of Directors;
|
7. |
Approval of grant of options to Ehud Gil, a member of the Board of Directors;
|
8. |
Approval of extension of an exemption previously provided to Ehud Gil, a member of the Board of Directors;
|
9. |
Approval of an updated compensation policy for the Company’s officers and directors;
|
10. |
Approval of update to terms of employment of Asaf Nehama, the son of Shlomo Nehama, the Company’s Chairman of the Board and a controlling shareholder; and
|
11. |
Reappointment of Somekh Chaikin, a member of KPMG International, as the independent auditors of the Company for the fiscal year ending December 31, 2023 and until the
next annual general meeting of the Company’s shareholders, and authorization of the Board of Directors to approve, following the approval of the Audit Committee, the remuneration of the independent auditors in accordance with the volume and
nature of their services.
|
• |
Approximately 35.9 MW of photovoltaic power plants in Spain and a photovoltaic power plant of approximately 9 MW in Israel;
|
• |
9.375% indirect interest in Dorad Energy Ltd., which owns and operates one of Israel’s largest private power plants with production capacity of approximately
850MW, representing about 6%-8% of Israel’s total current electricity consumption;
|
• |
51% of Talasol, which owns a photovoltaic plant with a peak capacity of 300MW in the municipality of Talaván, Cáceres, Spain;
|
• |
Groen Gas Goor B.V., Groen Gas Oude-Tonge B.V. and Groen Gas Gelderland B.V., project companies operating anaerobic digestion plants in the Netherlands, with a
green gas production capacity of approximately 3 million, 3.8 million and 9.5 million Nm3 per year, respectively;
|
• |
83.333% of Ellomay Pumped Storage (2014) Ltd., which is involved in a project to construct a 156 MW pumped storage hydro power plant in the Manara Cliff,
Israel;
|
• |
Ellomay Solar Italy One SRL and Ellomay Solar Italy Two SRL that are constructing photovoltaic plants with installed capacity of 14.8 MW and 4.95 MW,
respectively, in the Lazio Region, Italy;
|
• |
Ellomay Solar Italy Four SRL, Ellomay Solar Italy Five SRL, Ellomay Solar Italy Seven SRL, Ellomay Solar Italy Nine SRL and Ellomay Solar Italy Ten SRL that are
developing photovoltaic projects with installed capacity of 15.06 MW, 87.2 MW, 54.77 MW, 8 MW and 18 MW, respectively, in Italy that have reached “ready to build” status; and
|
• |
Fairfield Solar Project, LLC, Malakoff Solar I, LLC, Malakoff Solar II, LLC, that are developing photovoltaic projects with installed capacity of 13 MW, 6.5 MW
and 6.5 MW, respectively, in the Dallas Metropolitan area, Texas, and have reached “ready to build” status.
|
1 Year Ellomay Capital Chart |
1 Month Ellomay Capital Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions