ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

PXC Phoenix Copper Limited

14.25
0.00 (0.00%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Phoenix Copper Limited LSE:PXC London Ordinary Share VGG7060R1139 ORD NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 14.25 14.00 14.50 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Miscellaneous Metal Ores,nec 0 -1.55M -0.0124 -11.49 17.8M

Phoenix Global Mining Ltd Empire Mine:16% increase in forecast Cu production (3901L)

19/04/2018 7:00am

UK Regulatory


Phoenix Copper (LSE:PXC)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Phoenix Copper Charts.

TIDMPGM

RNS Number : 3901L

Phoenix Global Mining Ltd

19 April 2018

Phoenix Global Mining Ltd / Ticker: AIM:PGM / Sector: Mining

19 April 2018

Phoenix Global Mining Ltd ('Phoenix' or the 'Company')

Preliminary Economic Assessment Completed for the Empire Mine Project, Idaho

16% increase in forecast annual copper production

Phoenix Global Mining Ltd (LSE AIM: PGM), the AIM quoted, North American-focused base and precious metals exploration and development company, is pleased to announce the results of the Preliminary Economic Assessment (PEA) for its Empire Mine project in Custer County, Idaho, USA.

PEA Highlights:

   --      8,124 Tonnes Annual Copper Production 
   --      $65m average annual revenue, assuming $8,265 per tonne copper price across life of mine 
   --      8-Year Mine Life @ 0.24% Copper Cut-Off Grade 
   --      76% Heap Leach Copper Recovery 
   --      $61.2m pre-production capex 
   --      $4,068 per tonne Copper Cash Cost of Production 
   --      $53.66 million after tax NPV (7.5% discount) 
   --      23.5% IRR after tax 

-- PEA is based on open pit oxide copper production only, and excludes any potential revenue from gold, silver or zinc

Dennis Thomas, the Company's CEO, said: "I am pleased to report on the successful completion of our PEA on the Empire Mine open pit oxide deposit. This is a significant milestone for the Company and brings us an important step closer to copper production.

The PEA shows an average copper cathode production rate of 8,124 tonnes a year from a 2 million tonne a year mine at a cash cost of production of US$1.85 per pound of copper, an increase of 16% in annual copper production from our original projections. The project has robust economics and the 2018/2019 work programme will provide the opportunity to not only grow the existing Empire copper oxide resource but also to address the potential economic benefits of the gold, silver and zinc that were reported in the updated November 2017 resources following the 2017 drilling programme. The PEA does not consider production of these potential by-products. We are also confident that the project economics will continue to improve as the operating and capital costs are further examined and refined through the course of the BFS and we look forward to updating shareholders as we progress through the BFS process

A Bankable Feasibility Study (BFS) work programme has been developed that will commence in Q3 this year and will build from the current PEA. The BFS will provide the necessary information to begin construction in 2019 with the goal of production by early 2021."

 
 Preliminary Economic 
  Assessment 
-------------------------  ------------  ------------ 
 Average annual copper            8,124   Tonnes 
  production 
-------------------------  ------------  ------------ 
 Average annual revenue      65,010,500   US$ 
-------------------------  ------------  ------------ 
 Average annual operating    33,051,375   US$ 
  costs 
-------------------------  ------------  ------------ 
 Average EBITDA              31,959,125   US$ 
-------------------------  ------------  ------------ 
 Mine life                            8   Years 
-------------------------  ------------  ------------ 
 Revenue per tonne of             8,002   US$ / tonne 
  copper 
-------------------------  ------------  ------------ 
 Cash cost of production          4,068   US$ / tonne 
-------------------------  ------------  ------------ 
 Pre-production capital      61,207,000   US$ 
  costs 
-------------------------  ------------  ------------ 
 LOM cash flow pre-tax      134,580,000   US$ 
-------------------------  ------------  ------------ 
 LOM cash flow after        117,940,000   US$ 
  tax 
-------------------------  ------------  ------------ 
 NPV (5%) pre-tax            82,800,000   US$ 
-------------------------  ------------  ------------ 
 NPV (5%) after tax          70,580,000   US$ 
-------------------------  ------------  ------------ 
 NPV (7.5%) pre-tax          64,210,000   US$ 
-------------------------  ------------  ------------ 
 NPV (7.5%) after tax        53,660,000   US$ 
-------------------------  ------------  ------------ 
 

Project Overview

The Empire Project is located in southeast-central Idaho, in the Alder Creek Mining District and encompasses 109 contiguous mining claims, including 21 patented lode claims and 88 unpatented lode claims, covering 1774 acres (719 hectares). The Project consists of a skarn-hosted, open-pit, heap leach SX-EW copper resource and a deeper-rooted and past-producing high-grade copper, gold, silver and tungsten vein system. The subject of this PEA is the open-pit copper oxide resource.

Mineral Resources

The PEA is based on the previously reported November 7, 2017 Resource Update prepared by Hard Rock Consulting. This estimate encompasses the open-pit copper oxides occurring within an optimized pit-shell and includes 11,485 million tons in the Measured and Indicated category, grading 0.52% Cu above a cutoff grade of 0.184%, and 9,880 million tons of Inferred material above the same cutoff grading 0.41% Cu.

Mine Planning

The PEA mine plan was prepared by Hard Rock Consulting (HRC) using GemCom and AutoCad software. There were no constraints on land boundaries, allowing the pit shell and design pit to encompass and capture the majority of the MI&I resources in the November 7, 2017 Resource Report. The PEA-level phased pit design was based on slopes recommended by Call and Nicholas of 45-degrees in the oxide breccia rock type and 51-degrees in all other rock types. The 2.2 million tonne a year mine plan uses a cut-off grade of 0.24% copper.

The pit designs are based on PEA-level operating cost assumptions and appear to be consistent with current labour, fuel, reagent, and general processing costs.

Operating costs were calculated assuming CAT 777 trucks and CAT 992 loaders and DM45 production drills. The work schedule assumes two-12 hour shifts per day, 365 days per year at an assumed 92% availability for haul trucks and loaders, and 85% availability for all other equipment.

Production Schedule

The PEA mine plan was designed as a series of four phased push-backs to achieve a balanced production of ore and waste rock over the life of the mine. The mine preproduction requirements at the project are minimal given the presence of mineable mineralization near the bedrock surface. The first pit phases are planned near the crusher area to minimize haulage distances at the beginning of the mine life. Waste material from the pit areas will be utilized for construction of the heap leach pad, crusher area and other infrastructure.

Crushing, Screening and Agglomeration

Run-of-mine ("ROM") ore will be delivered to a modular crushing-screening plant at a rate of 350 short tons per hour. This throughput is based on 75% plant availability on a 24-hour basis. ROM material is expected to have a P(100) of 24". The leach pad is currently being designed for crushed material having a P(80) of 3/4 ".

The crushing-screening plant will consist of dump hopper, a vibrating grizzly feeder, a jaw crusher, a secondary screen and cone crusher, and a tertiary screen and cone crusher. These components are connected by 30-in wide conveyors.

Ore grade material from the open pit will be crushed to 6.35 mm and then agglomerated with cement prior to loading on the heap leach pad in 10m lifts. Agglomerated ore will be conveyed to the leach pad via a series of grasshopper conveyors feeding a radial stacker.

Heap Leaching and Pregnant Leach Solution (PLS) Pond

Golder Associates have provided a PEA-level preliminary layout for a 20-million-tonne heap leach pad. The leach pad is located in an east-west valley located to the north of the Empire open pit in an area known as North Gulch. The layout includes perimeter roads and anchor trenches.

The PLS pond will receive the aggregate flow of PLS from the leach pad and has a pond capacity of 1,495,000 gallons. The contingency pond is designed to capture any overflow of the PLS pond in the event of a 24-hour 100-year storm event that saturates the leach pad. The design capacity is 8,380,000 gallons.

The leach pad is planned to be constructed in stages in order to minimize initial capital. Phase 1 will allow for 3 years of operation before phase 2 will need to be constructed.

Solvent Extraction, Tank Farm and Electrowinning (SX-EW)

Copper-bearing PLS will be pumped to the solvent extraction (SX) area for processing to extract the copper from solution. The SX stripping circuit consists of two stripping mixer-settlers in a series arrangement. Each SX stripper has two mix tanks and a settler which mix the copper-rich organic from the extraction settlers with strongly acidic lean electrolyte to transfer copper from the organic liquid to the electrolyte. Rich electrolyte loaded with copper leaving the stripping settlers will report to the loaded organic tanks in the tank farm.

The tank farm will be located below the solvent extraction facility and contains tanks, pumps, heat exchangers, and filters that service the SX-EW facilities. The tank farm will store and transfer organic, electrolyte, reagents, and crud, as well as provide storage for a 5-day supply of fresh reagents. The tank farm is designed with secondary containment capable of holding 110% of the contents of the largest tank.

The electrowinning facility removes copper from the rich electrolyte solution and plates the copper on cathodes using a direct current electrical process. The copper sheets are stripped, or "harvested", on a daily or weekly basis. The sheets are then sampled, bundled, weighed, and loaded onto flatbed trucks for transport to market.

A main electrical substation is located in the SX-EW plant area and receives power from a new 24.9kV power line coming from the Mackay substation 3 miles away belonging to Lost River Electric Cooperative in Mackay, Idaho. The Empire substation will transform power from 24.9 kV to 13.8 kV for the tankhouse, and lower voltages for distribution to the various areas of the plant. Medium and low voltage in the various plant areas will be 4160 V and 480 V. Motor control centres and electrical equipment rooms for the low voltage distribution are located at the crushing plant, the stockpile/agglomerator, the EW tankhouse, the SX circuit and tank farm, the leach pad/PLS pond and up at the truck shop near the Empire open pit.

Infrastructure and Services

Ancillary facilities at the mine site include a prefabricated modular guardhouse and truck scale, a pre-engineered metal warehouse/maintenance building, a truck shop and a fuel station.

In the town of Mackay, other ancillary facilities will include the administration building and an assay lab for production samples from the mine. A separate solution lab will be housed in a room at the EW building for control of process solutions.

The administration building is provided for the general administrative personnel, safety, environmental and office services. Currently, the building is specified to be a pre-engineered building. Space is also provided for an analytical laboratory. A warehouse/maintenance building is provided in the SX-EW plant area and a security gate house is provided at the main entrance to the plant.

Mine Access Road

The access to the Empire mine follows along the existing Smelter Avenue that leads from Mackay to the mine site. The mine access road has been designed for a maximum grade of 8% and will be widened to 40 ft to accommodate two-way traffic and oversize vehicles delivering mining equipment. Berms and drainage channels have been incorporated into the PEA design.

Power Supply and Distribution

Grid power for the Empire mine will be provided by Lost River Electric Cooperative, located in Mackay, and is assumed in the PEA at a bulk industrial rate of $0.07 per kW-hr. Power will be supplied through a new 24.9 kV power line from the Mackay substation.

Water Supply and Distribution

The Empire copper SX-EW operation will be a zero-discharge facility. All water that is used in the operation will be recycled into the raffinate leach solution.

The PEA estimates operational requirements of approximately 386 gpm for the processing circuit, truck shop, and dust control, with approximately 194 gpm lost to evaporation and irreducible moisture content in the heap. Fresh water and fire water will be stored in tanks at the site and will be filled with water from the Company's Cliff Creek water right and from a constructed catchment basin. Potable water will be sourced from Mackay.

Commodity Price Projections

In view of the medium-to long term copper supply shortfall a copper price of $3.75 per pound ($8,265 per tonne) has been used for the base case analysis. This price is based on the average forecast copper price as reported by Metal Bulletin Apex Copper.

Permitting and Environmental

As part of the PEA process, the Company determined that the most practical and economical mining and processing scenario would be to design the heap leach pad and SX-EW facility on unpatented claims north of the open-pit. This decision was made based on slope angles and safety factor calculations.

As a result, the Empire project will require the submission of a Plan of Operations and Record of Decision prior to operation. Project permitting will require a joint agency review and approval process for disturbance on patented land subject to regulation by the Idaho Department of Lands (IDL) and unpatented land in the Salmon-Challis National Forest (SCNF) managed by the Forest Service. It is anticipated that the Forest Service will be the lead agency for environmental reviews of the entire project, which will solicit input from state agencies and other federal agencies.

To initiate permitting, the Company will submit a Plan of Operation to the Forest Service. The plan must include general information including dates and duration of proposed operations, site location, access - including construction specifications for earthwork, layout of operation, description of operational details, engineering designs for structures, and environmental protection measures (EPMs). The EPMs must address air and water quality, fish and wildlife impacts, cultural resources, protection of scenic values, and solid and hazardous waste management. There are no water quality concerns that have been identified in the Project Area.

The Forest Service will conduct an environmental review, as required by the National Environmental Policy Act ("NEPA"). Formal scoping of the NEPA review will be initiated after submittal of the Plan of Operation. The project may be reviewed under an Environmental Assessment, since it does not fall into one of the categories of actions that normally require an Environmental Impact Statement, particularly since the claim block is not located within an inventoried roadless area, wilderness area, or proposed wilderness area.

A reclamation performance bond will be posted prior to the issuance of the Record of Decision. A single bond instrument could be issued to satisfy the requirements of the Forest Service and IDL on the unpatented and patented claims.

Economic Model and Analysis

The PEA for the Empire Project evaluates the project as a heap leach SX-EW copper cathode operation at a mining rate of 2 million tonnes of ore a year. The economic viability of the Project was evaluated using a constant-dollar, after-tax discounted cashflow.

Mineral resources were incorporated into the economic evaluation using Measured, Indicated and Inferred material. These are based on the November 2017 NI 43-101 resources.

After-Tax cash flows were calculated on a yearly basis for the life of the mine. Federal, state and local taxes were considered for this evaluation.

The Project is projected to have robust economics at the base case copper price of $3.75/lb. The projected sensitivities in the Net Present Value from variations in the discount rate have also been calculated on an After-Tax basis

The project economics are summarized below:

 
                                                                           Imperial                            Metric 
=================  ====================  ===================  =================================  ================================= 
 Resources          Cut-off grade                                                         0.24%                              0.24% 
  Measure & indicated   short tons/tonnes                                            10,024,000                          9,096,189 
             Cu Grade   %                                                                 0.56%                              0.56% 
  Inferred              short tons/tonnes                                             8,098,000                          7,348,457 
             Cu Grade   %                                                                 0.46%                              0.46% 
  Waste                 short tons/tonnes                                            48,565,000                         44,069,873 
                               Strip Ratio                                                 2.68                               2.68 
 -----------------------------------------  ----------------  ---------------------------------  --------------------------------- 
                    Average ore per 
 Mine Production     day                  short tons/tonnes                               6,200                              5,626 
  Average ore per 
   year                 short tons/tonnes                                             2,200,000                          1,996,370 
  Average waste per 
   year                 short tons/tonnes                                             5,896,000                          5,350,272 
  Life of mine (LOM)    years                                                                 8                                  8 
 --------------------  -------------------------------------  ---------------------------------  --------------------------------- 
 Copper 
  Production        LOM Cu grade          %                                               0.52%                              0.52% 
  Contained copper      short tons/tonnes                                                94,234                             85,512 
  Average 
   metallurgical 
   recovery             %                                                                 76.0%                              76.0% 
  LOM recovered 
   copper               short tons/tonnes                                                71,618                             64,989 
  Average annual 
   copper production    short tons/tonnes                                                 8,952                              8,124 
 --------------------  -------------------------------------  ---------------------------------  --------------------------------- 
                                          US$ / short 
                    Base case copper       ton / per 
 LOM Revenue         price                 tonne                                          7,500                              8,265 
   US$ / pound 
    copper                                                                                 3.75                               3.75 
  LOM gross revenue     US$                                                         537,136,080                        537,136,080 
  LOM Net revenue 
   after freight, 
   insurance, 
   royalties            US$                                                         520,084,000                        520,084,000 
 --------------------  -------------------------------------  ---------------------------------  --------------------------------- 
 LOM Operating 
  Costs             Mining                US$                                       115,480,000 
  Processing            US$                                                         122,959,000 
  G&A                   US$                                                          22,511,000 
  Mining licences 
   & property tax       US$                                                           3,461,000 
  Total                 US$                                                         264,411,000                        264,411,000 
 --------------------  -------------------------------------  ---------------------------------  --------------------------------- 
 LOM EBITDA                                US$                                      255,673,000 
---------------------------------------   ------------------  ---------------------------------  --------------------------------- 
 Average 
  annual 
  revenue                                  US$                                       65,010,500 
 Average annual operating 
  cost                                    US$                                        33,051,375 
 Average 
  annual 
  EBITDA                                   US$                                       31,959,125                         31,959,125 
---------------------------------------   ------------------  ---------------------------------  --------------------------------- 
 Pre Production 
  Capital           Lease purchase 
  Costs              or contract mining   US$                                           185,000 
  Crushing & 
   agglomerating        US$                                                          11,122,000 
  Leach pads & ponds    US$                                                           5,419,000 
  Process plant         US$                                                          21,629,000 
  Infrastructure        US$                                                           3,435,000 
  Site general          US$                                                          13,879,000 
  Utilities             US$                                                           3,538,000 
  Bonding               US$                                                           2,000,000 
  Total                 US$                                                          61,207,000                         61,207,000 
 --------------------  -------------------------------------  ---------------------------------  --------------------------------- 
 Ongoing 
  Capital           Crushing & 
  Costs              agglomerating        US$                                         2,145,000 
  Leach pads & ponds    US$                                                           7,085,000 
  Mining equipment 
   lease purchase       US$                                                          18,310,000 
  Reclamation bonding   US$                                                           4,000,000 
  Salvage               US$                                                           - 643,000 
  Total                 US$                                                          30,897,000                         30,897,000 
 --------------------  -------------------------------------  ---------------------------------  --------------------------------- 
                    LOM cash flow pre 
 Cash Flow           tax                  US$                                       134,580,000 
  LOM cash flow after 
   tax                  US$                                                         117,940,000 
 --------------------  -------------------------------------  ---------------------------------  --------------------------------- 
 NPV (5.0%)         NPV pre tax           US$                                        82,800,000 
  NPV after tax         US$                                                          70,580,000 
 --------------------  -------------------------------------  ---------------------------------  --------------------------------- 
 NPV (7.5%)         NPV pre tax           US$                                        64,210,000 
  NPV after tax         US$                                                          53,660,000 
 --------------------  -------------------------------------  ---------------------------------  --------------------------------- 
 IRR                IRR pre tax           %                                               26.3%                              26.3% 
  IRR after tax         %                                                                 23.5%                              23.5% 
 --------------------  -------------------------------------  ---------------------------------  --------------------------------- 
 Operating 
  Costs /                                 US$ / pound 
  Pound Copper      Mining                 copper                                          0.81 
                        US$ / pound 
  Processing             copper                                                            0.86 
  General &             US$ / pound 
   Administration        copper                                                            0.16 
  Mine License &        US$ / pound 
   Property Tax          copper                                                            0.02 
  Cash Cost / lb        US$ / pound 
   Cu                    copper                                                            1.85 
 --------------------  -------------------------------------  ---------------------------------  --------------------------------- 
 
 

Capital Cost Estimates

Capital costs for developing the Empire mine are estimated from other recent mine development capital costs as well as quotes for some of the larger components. The operating costs were determined based on HRC's industry knowledge and prior experience, Info Mine's Cost Mine Service, and actual costs data from operating mines of similar size. Golder Associates prepared the heap leach facility construction capital cost estimate, and M3 Engineering contributed PEA-level design information and takeoff data for the plant capital and operating cost estimates.

The open pit mining equipment is assumed to be leased rather than purchased. The type of lease is assumed to be a capital equipment lease. Total initial capital is estimated at $67.9 million, including a $6.8 million contingency

Sustaining capital costs are included for phase 2 and 3 of the leach pad. A portion of the leach pad conveying system is also delayed for purchase into year 1.

Operating Cost Estimates

Operating costs for the Project were developed from material and consumption data provided by M3 Engineering, HRC's industry knowledge and prior experience, and Info Mine's Cost Mine Service.

Taxes

State, local, and federal taxes, including income taxes and the Idaho Mining License tax, have been considered in this study, and are included in the economic analysis.

Royalties

A 2.5 percent royalty, calculated on the gross proceeds less transportation and refining costs, has been included for all the metal produced, as required by underlying agreements.

Consultants

The following consultants have contributed to the PEA and have been involved with the project since Q2 2017:

   --     Resources and Mine Planning                   Hard Rock Consulting LLC - Lakewood, Colorado 
   --     Open Pit Slope Stability                               Call & Nicholas - Tucson, Arizona 
   --     Heap Leach Pad and Ponds Designs        Golder Associates Inc - Tucson, Arizona 

-- Metallurgical Testwork Minerals Technology LLC - Tucson, Arizona

-- Process Plant and Infrastructure M3 Engineering & Technology Corp. - Tucson, Arizona

   --     Environmental Base Line and Permits    CES - Pocatello, Idaho 

Qualified Person

The information in this announcement has been reviewed by Roger Turner A.C.S.M., M.Sc., M.I.M.M.M., C.Eng., Chief Technical Officer and Director of the Company. Mr Turner is a graduate mining engineer from the Camborne School of Mines with an MSc in Economic Geology from Leicester University with more than 40 years' experience in mine development, construction and operation and is a qualified person under the AIM Rules. Mr Turner consents to the inclusion of the information in the form and context in which they appear.

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 
 
 

**S**

For further information please visit www.pgmining.com or contact:

 
 Phoenix Global         Dennis Thomas / Richard   c/o St Brides 
  Mining Ltd             Wilkins                   Partners 
                                                   +44 20 7236 
                                                   1177 
---------------------  ------------------------  -------------- 
 SP Angel               Lindsay Mair / Caroline   Tel: +44 20 
  (Nominated Advisor)    Rowe                      3470 0470 
---------------------  ------------------------  -------------- 
 Brandon Hill           Jonathan Evans / Oliver   Tel: +44 20 
  Capital (Broker)       Stansfield                3463 5000 
---------------------  ------------------------  -------------- 
 St Brides Partners     Charlotte Page / Susie    Tel: +44 20 
  (Financial PR)         Geliher                   7236 1177 
---------------------  ------------------------  -------------- 
 

Notes

Phoenix Global Mining Ltd (AIM: PGM) is a North American-focused, base and precious metal explorer and developer, which is fast-tracking the historically-producing Empire Mine in Idaho, USA, back into production and exploring for cobalt in Idaho and gold in Canada.

Having established an initial copper oxide JORC and NI 43-101 resource of 19.4 mt grading 0.47% copper ('Cu') for 90,547t contained Cu, plus zinc, gold and silver, Phoenix has defined a two-phase development strategy. Phase One is focused on commencing low cost, open pit production from the current oxide resource, targeting 7,000t copper cathode per annum. Stage Two will look to extend the life of mine by targeting the deeper (below c.120m), higher grade copper sulphides, where intercepts of up to 11.4% Cu have been recovered. Preliminary Economic Analysis work on the priority open pit oxide resource is already underway. It is estimated that only 5% of the potential ore system has been explored to date and accordingly there is significant opportunity to increase the resource through phased exploration; the current resource relates to the oxide resource only, which remains open along strike and does not include the deeper, higher grade sulphides. Phoenix owns 80% of Empire.

The Company also holds 100% of the Bighorn and Redcastle cobalt-copper properties in Idaho, USA, which are located north of the Empire Mine on the Idaho Cobalt Belt. These are situated close to the town of Cobalt and are close to projects being advanced by Canadian junior miners, including eCobalt Solutions and US Cobalt. Exploration will continue during 2018 to identify drilling targets.

The Company has also acquired an exclusive option to earn into 80% of the Gordon Lake Project, in the Northwest Territories, Canada, a high-grade shear hosted gold project comprising of 17 known mineralised zones of which only four have been tested with 59 diamond drill holes. The Company will proceed to examine the optimal way forward to develop the project as a low-cost underground gold producer.

With a management team that has successfully constructed, commissioned and operated mines and low risk, mining-friendly jurisdictions with excellent infrastructure, Phoenix is looking to fulfil its ambitions to become a mid-tier base and precious metals producing company, offering exposure to three high value and high demand metals with compelling demand/supply fundamentals.

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLIPMRTMBIBBIP

(END) Dow Jones Newswires

April 19, 2018 02:00 ET (06:00 GMT)

1 Year Phoenix Copper Chart

1 Year Phoenix Copper Chart

1 Month Phoenix Copper Chart

1 Month Phoenix Copper Chart

Your Recent History

Delayed Upgrade Clock