We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Tarquin | LSE:TQN | London | Ordinary Share | GB00B0Y52T38 | ORD 15P |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 13.00 | 0.00 | 01:00:00 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
0 | 0 | N/A | 0 |
Operations Update TARQUIN RESOURCES PLC ("Tarquin" or "the Company") OPERATIONS UPDATE 30 January 2008. The directors of Tarquin (AIM : TQN) wish to inform and update the market on the following activities which have been carried out during the quarter ended 31 December 2007. Project Puquios (formerly Las Pascualas): The feasibility study commenced early in the quarter with the appointment of Idesol Ingenieros SA, an experienced Santiago based consultancy firm, as the principal engineers. Progress has been largely to plan, with the key activities undertaken including the preparation of flow-sheets, water balance, general arrangement drawings, leach-pad design and the mechanical equipment list. In addition, initial vendors quotations for some major equipment has been received and work commenced on a revised preliminary cost estimate. The target completion date for the feasibility study remains the September 2008 quarter. Four diamond drill holes were completed for geomechanical appraisal, nine to validate previous RC holes and four larger diameter holes to provide samples for further metallurgical testwork. The Phase 1 metallurgical test programme was largely completed with preliminary results indicating metal recoveries in line with pre-feasibility study assumptions. The final report for this programme is expected in February 2008. Good progress continued to be made with the Environmental approvals with final approval now expected by February 2008. A contract was let for the re-drilling of the water well that is proposed as the major source of project water supply. This programme of drilling and the associated pump tests are scheduled to commence in January 2008. Exploration continued in the vicinity, and at Las Nipas a significant copper-molybdenum-gold geochemical anomaly was located, detailed geological mapping was completed and drill sites prepared for a drilling programme to commence in March 2008. The project has been renamed Puquios (the project is located adjacent to the Puquios valley) to avoid confusion with another Chilean mining project with a similar name to Las Pascualas. The information set out above is based on data compiled by Roger Shakesby, who is a Director of the Company. Mr Shakesby has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he has undertaken and consented to the inclusion of the data in the form and context in which it appeared. For further information: Annie Richards Tarquin Resources plc Tel: 020 7514 1480 Charles Vivian Pelham Public Relations Tel: 020 7743 6672 Hugh Oram Nabarro Wells & Co. Limited Tel: 020 7710 7400 - ---END OF MESSAGE---
1 Year Tarquin Resources Chart |
1 Month Tarquin Resources Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions