ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

84WR Moyle2.9376%33

194.6887
0.00 (0.00%)
18 Dec 2024 - Closed
Delayed by 15 minutes
Name Symbol Market Type
Moyle2.9376%33 LSE:84WR London Bond
  Price Change % Change Price Bid Price Offer Price High Price Low Price Open Price Traded Last Trade
  0.00 0.00% 194.6887 0 00:00:00

Moyle Interconnector (Financing)PLC Moyle Interconnector Fault (3243X)

20/02/2017 1:20pm

UK Regulatory


Moyle2.9376%33 (LSE:84WR)
Historical Stock Chart


From Dec 2019 to Dec 2024

Click Here for more Moyle2.9376%33 Charts.

TIDM84WR

RNS Number : 3243X

Moyle Interconnector (Financing)PLC

20 February 2017

20 February 2017

Moyle Interconnector (Financing) plc

GBP135,010,000 Index-Linked Guaranteed Secured Bonds due 2033

Moyle Interconnector Fault

Over the weekend past a serious operational problem arose with the Moyle Interconnector, the 500MW electrical link between Northern Ireland and Scotland. At 15.25pm on Saturday 18(th) of February the Southern high voltage cable tripped, indicating a fault with the high voltage conductor.

Initial investigation has indicated that there is a cable fault which is located offshore in water of approximately 140m in depth. The Southern Cable has been disconnected and Moyle is now operating at a reduced capacity of 250MW.

Further investigation is continuing in order to pinpoint the precise location of the fault and to establish the cause of the problem.

This is very much an unexpected event in that the fault relates to the high voltage element of the interconnector which is robust and well established technology. It is regularly tested, passing all tests, and has operated without any problems since installation over 15 years ago. The other elements of the Moyle Interconnector, including the new Metallic Return Conductors which were successfully installed last year are unaffected and continue to perform in line with expectations.

It is too early to say if the cable has been damaged on the seabed following some kind of strike or if there is some other reason for the fault.

While investigations continue, Mutual Energy will begin to source the resources (specialist vessel, equipment and repair teams etc) necessary to deliver a full marine repair. Depending on the availability of resources and the nature of the seabed a sea-based repair could typically take an estimated six months.

This fault does not affect the ability of the interconnector Northern cable to continue to contribute 250MW to Northern Ireland's electricity system.

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCBXGDDGGDBGRG

(END) Dow Jones Newswires

February 20, 2017 08:20 ET (13:20 GMT)

1 Year Moyle2.9376%33 Chart

1 Year Moyle2.9376%33 Chart

1 Month Moyle2.9376%33 Chart

1 Month Moyle2.9376%33 Chart

Your Recent History

Delayed Upgrade Clock