ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

GETS Groupe Euro.

5.835
0.00 (0.00%)
21 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Groupe Euro. LSE:GETS London Ordinary Share FR0010533075 ORD EUR0.4
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 5.835 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Eurotunnel Adds Additional Capacity for Olympic Games in London

21/05/2012 7:45am

UK Regulatory


Groupe Euro. (LSE:GETS)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Groupe Euro. Charts.
 
TIDMGETS 
 
 

Eurotunnel (Paris:GET) (LSE:GETS) is bringing an additional half Shuttle (rake) into service to transport cars between Calais and Folkestone, thus increasing capacity in the lead up to the Queen's Diamond Jubilee celebrations and the London Olympic Games. As a result of the interest in these events, sharp peaks of traffic are expected between the continent and Great Britain.

 

The new rake will enter service this morning in Coquelles, Pas-de-Calais, in front of invited guests from both sides of the Channel. The new 12 wagon rake will be launched by the French Olympic rhythmic gymnast, Delphine Ledoux.

 

The rake is 400 metres long and is composed of 14 wagons (12 carrying and two loading wagons) plus the two locomotives. It has been constituted from the re-commissioning of stock material. The project to bring the rake into service started in September 2011, since when it has required 250,000 hours of work, 322 km of cabling, and the installation of 89,000 parts and components. 180 people have worked on the project for a total cost of EUR10 million.

 

An additional improvement to the Eurotunnel Le Shuttle service this summer is the increase in the speed of the Shuttles to 160 kph (from 140 kph), which will reduce crossing times to less than 30 minutes; this will enable the timetable to accommodate up to five departures per hour in each direction.

 

Jacques Gounon, Chairman and Chief Executive Officer of Groupe Eurotunnel, stated: "Eurotunnel is looking forward to the Olympic Games in London where the values of performance, innovation and rigour, to which we adhere, will be celebrated. We have invested and we are ready to meet the growing demand from our customers."

 
Groupe Eurotunnel 
For media enquiries: 
John Keefe Consultant, + 44 (0) 1303 284491 
press@eurotunnel.com 
or 
For investor enquiries: 
Michael Schuller, +44 (0) 1303 288749 
Michael.schuller@eurotunnel.com 
 
 
 
 
 

1 Year Groupe Euro. Chart

1 Year Groupe Euro. Chart

1 Month Groupe Euro. Chart

1 Month Groupe Euro. Chart

Your Recent History

Delayed Upgrade Clock