We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Ballarat Gold | LSE:BGF | London | Ordinary Share | AU000000BGF7 | ORD SHS NPV |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 12.50 | 0.00 | 00:00:00 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
0 | 0 | N/A | 0 |
RNS Number:3420Q Ballarat Goldfields N.L. 30 January 2007 Ballarat Goldfields NL ASX and Media release: 30 January 2007 Quarterly Activities and Cash flow Report For the 3 months ended 31 December 2006 SUMMARY Corporate and Finance * Proposed merger with Lihir Gold Ltd (LHG) via a scheme of arrangement (Scheme) was announced on 17 October 2006 and Explanatory Statement released to the ASX on 18 December 2006. * The Directors unanimously recommend that, in absence of a superior proposal, shareholders vote in favour of the merger. * If approved, Ballarat Shareholders will own 5 shares in the new merged Lihir entity, for every 54 BGF shares they owned. * As part of the merger, BGF placed 149 million shares with LHG at $0.28 raising $41.7 million. These funds enabled BGF to commit to the new development plan. * Cash balance at 31 December 2006 was A$40.7 million .Mine Development * Performance to the revised development plan, implemented in the September quarter, was slightly ahead of schedule with key depth and lateral targets achieved during the quarter. * Underground development of 989 metres continued the improved development rates achieved in the previous quarter. * Over 7,000 tonnes of low grade development material from a sill drive at the base of the 218 Woah Hawp ore block was processed. * Commitment made for construction of the In-Line Leach Reactor (stage 2 of the process plant). * Water treatment options, previously focused on dewatering objectives, are being reviewed to access the opportunity for supplementary supply to the city of Ballarat. Mine Geology and Exploration * Drilling continues to confirm the geological model. * Assay grades continue to support the existence of strong gold mineralisation. MERGER WITH LIHIR GOLD LIMITED BGF and Lihir Gold Limited (Lihir) announced on 17 October 2006 a proposal to merge the two companies via a scheme of arrangement (Scheme). Under the terms of the Scheme, BGF will become a wholly owned subsidiary of Lihir with BGF shareholders receiving 5 New Lihir Shares for every 54 BGF shares held, valuing BGF at 28.8 cents per share (based on the LHG share price as at the date of the announcement of the merger). An Explanatory Statement was released to ASX and mailed to BGF shareholders on 10 January 2007 to provide them with relevant information necessary to determine whether to vote in favour of the merger at the Scheme Meeting that will take place on 12 February 2007 in Ballarat. The Directors of Ballarat Goldfields unanimously recommend that, in the absence of a superior proposal, BGF shareholders vote in favour of the proposed merger as they believe it will deliver significant value to BGF shareholders. Ballarat Goldfields Directors (all of whom hold BGF shares) intend to vote their shares, and any proxies cast at their discretion, in favour of the merger. The Explanatory Statement is also available on the BGF website at www.ballarat-goldfields.com.au. BALLARAT EAST PROJECT Development Revised Development Strategy As announced in early September 2006, BGF completed a comprehensive review of its development strategy for the Ballarat East project. The outcome was a new and substantially superior development plan, with emphasis on early access to the deeper, higher grade Resources, deferring production until calendar year 2008. Underground Development Depth and lateral development objectives established under the revised development plan, implemented in September, were achieved putting the underground development slightly ahead of schedule. Ballarat Goldfields - Decline Advance Summary Woah Hawp Decline Sulieman Decline Prince Decline (depth below surface) (depth below surface) (depth below surface) Planned Actual Planned Actual Planned Actual Dec-06 339 345 324 330 336 337 Development rates were sustained at the high rates achieved in the previous quarter with a total of 989m developed for the December quarter. Ground conditions have improved with depth and with work practices now reflecting accumulated local knowledge the current development rates are expected to be maintained, and improved upon, as increased heading availability further improves equipment utilisation and productivity. Dec Qtr 05 Mar Qtr 06 Jun Qtr 06 Sept Qtr 06 Dec Qtr 06 U/G Development (m) 546 584 691 976 989 Ore Tonnes 6,737 6,519 3,993 4,100 7,345 The development focus remains on the Sulieman, Woah Hawp and the recently commenced Prince declines. The Sulieman decline initially provides a platform for underground diamond drilling and in the future will become the main return airway for the mine. The Woah Hawp decline is being driven to provide access to Resources in the central and northern areas of the mine and the Prince decline will provide access to deeper high grade Resources in the southern part of the mine. As the Resources are accessed it is planned that they will be fully delineated by drilling, developed and then brought into production. Development continued within the 218 Woah Hawp ore block during the quarter with a sill drive pushed to the geological boundary of the structure, and extensive mapping undertaken to better define the ore zones before production drilling commenced in late December. An underground ventilation circuit was commissioned in the first week of January to support the development of the Prince decline system. BGF is re-evaluating the nature and timing of major elements of the ventilation circuit for Ballarat East including ventilation options at South Prince and Golden Point as a consequence of the improved underground development rates. A second underground dewatering pump installation was commissioned in the first week of January that will allow access to the 176 Sulieman trial stoping area over the coming months. Processing Plant The High Pressure Grinding Roll trials have been completed and results are being analysed in order to determine the best option to meet future expanded production rates. Approximately 7,000 tonnes of low grade development material was processed during the December quarter as part of the trials, and to enable further fine tuning of the process plant. Approximately 500 tonnes of sulphide concentrate was produced, which has been added to the previous stockpiled material in readiness for the stage 2 leach circuit. Approximately 4kg of gold was recovered to dore with the balance of the gold reporting to the sulphide concentrate. Gekko Systems were engaged to commence construction of stage 2 of the processing plant, the concentrate leaching circuit (In-Line Leach Reactor) that will commence treating gold bearing sulphide concentrates later in 2007. MINE GEOLOGY AND EXPLORATION Exploration drilling During the December quarter drilling was focused on shallow resources close to the planned Woah Hawp decline, followed by deeper drilling (to 700m below the surface) targeted towards the Blue Whale fault. The drilling results continue to identify gold mineralisation in the locations defined by the geological model, with visible gold and higher grade assay results observed in quartz veins close to the Blue Whale fault. Significant assay results from the December 2006 quarter are summarised in the following Table: Hole number Down hole depth (m) Width (m)* Grade g/t Location BEU145 289 to 293 4.0 5.2 Tiger Fault ---------- --------------- --------- -------- ------------- BEU145B 334 to 339 5.0 4.2 Mako Fault ---------- --------------- --------- -------- ------------- 354 to 356 2.0 10.7 MakoFW fault ---------- --------------- --------- -------- ------------- BEU158B 371 to 375 4.0 3.7 Whale Shark Fault ---------- --------------- --------- -------- ------------- (NB*All of the intersections reported have been adjusted for their estimated true widths.) ENVIRONMENT AND COMMUNITY In maintaining continual improvement of amenity and environmental aspects, BGF ensures progressive and continual land rehabilitation is achieved. A major replanting program was successfully completed during the quarter, despite lower than average rainfall. Maintaining a high level of community support and regulatory compliance is a key focus and was successfully achieved during the quarter with no significant environmental breaches or incidents. A high level of pro-active community dialogue was maintained with blast vibration being the main point for discussion. A contract has been awarded to construct a water treatment facility at the historic Llanberris shaft site. The treatment plant will enable BGF to recommence dewatering the northern part of the Ballarat East field in 2007. BGF is pursuing water re-use opportunities within the Ballarat community. CORPORATE AND FINANCE Finance The cash balance at 31 December 2006 was $40.7 million. As part of the proposed merger, BGF placed 149 million ordinary shares with Lihir at $0.28 raising $41.7 million on 17 October 2006. BACKGROUND INFORMATION Ballarat East Project Summary Situated in one of the most famous historical gold mining regions of Australia, Ballarat produced over 12 million ounces before it's premature closure, around the time of the first world war. In 2004, for the first time following discovery in the 1850's, the leases over the entire Ballarat field were consolidated under the sole ownership of BGF. This has resulted in the company constructing a comprehensive geological model of the entire field, demonstrating what many had suspected, that Ballarat had massive unexplored prospectivity. Following a prefeasibility study, based on BGF's geological model, underground development at Ballarat East recommenced in December 2004. The plan, proposed an initial underground mine at Ballarat East, with twin access declines servicing the haulage and ventilation. This plan has now been modified, as increased knowledge has led to increased resources and a better understanding of the likely distribution of high grade gold within the system. Drilling has continued to increase confidence in the geological model. Development of the mine and associated process plant is continuing, with stage 1 of the process plant now commissioned. BGF's geological model robust BGF's geological model remains robust as the drilling continues to intersect gold mineralisation in the target zones identified by the geological model. After probability adjustment for risk and uncertainty the company derived an Exploration Potential of 8.3 million ounces, with 90% confidence limits ranging from 3.3 million ounces to 15.7 million ounces in addition to a Total resource of 1.4 million ounces, including 0.24 million ounces of indicated resource, for Ballarat East. (Further information is available on the BGF website www.ballarat-goldfields.com.au) Note: The information in this report that relates to Exploration Results, Mineral Resources and Exploration Potential is based on information compiled by Mr Steven Olsen. Mr Olsen is an employee of Ballarat Goldfields NL, is a member of the Australian Institute of Mining and Metallurgy and is a Competent Person under the definition of the 2004 JORC Code. The Exploration Potential described above is conceptual in nature, and there is insufficient information to establish whether further exploration will result in the determination of a Mineral Resource. Mr Olsen consents to the publication of this information in the form and context in which it appears. . The terms Exploration Results, Mineral Resources and Exploration Potential are used in accordance with their definitions in the 2004 JORC Code, which is available at www.jorc.org. CORPORATE DIRECTORY Registered and Principal Office Directors Chairman 10 Woolshed Gully Drive Alister Maitland Managing Director Mt Clear Victoria 3350 Richard Laufmann Non-executive Director Australia Mike Etheridge Director of Operations Wojciech Ozga Web Site Company Secretary www.ballarat-goldfields.com.au Amber Rivamonte Shareholder Services Stock Exchange Listing Computershare Investor Services Pty Australian Stock Exchange Code BGF Limited GPO Box 2975EE Alternative Investment Market (AIM) BGF Melbourne AIM Nominated Advisor Victoria 3000 RFC Corporate Finance Ltd Australia Level 14, 19-31 Pitt St Investor Enquires Tel: 1300 850 505 Sydney, NSW, Australia 2000 Tel: 03 9415 5000 AIM Nominated Broker Fax: 03 9473 2500 Numis Securities www.computershare.com Cheapside House, 138 Cheapside London EC2V 6LH, United Kingdom For further information: please visit the company website (www.ballarat-goldfields.com.au) Or contact Joel Forwood, Manager Corporate and Markets, on (03) 5327 1111. Rule 5.3 Appendix 5B Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity BALLARAT GOLDFIELDS NL ABN Quarter ended ("current quarter") ------------------- ------------------ 50 006 245 441 December 2006 ------------------- ------------------ Consolidated statement of cash flows ------------ ------------ Cash flows related to operating activities Current quarter Year to date $A'000 (12 months) $A'000 ------------ ------------ 1.1 Receipts from product sales and related - - debtors 1.2 Payments for (a) exploration and (12,137) (22,135) evaluation (b) development - - (c) production - - (d) administration (995) (2,131) 1.3 Dividends received - - 1.4 Interest and other items of a similar 494 788 nature received 1.5 Interest and other costs of finance paid (98) (298) 1.6 Income taxes paid - - 1.7 Other (provide details if material) - - ------------ ------------ Net Operating Cash Flows (12,736) (23,776) ------ -------------------------- ------------ ------------ Cash flows related to investing activities 1.8 Payment for purchases of: (a)prospects (1,952) (3,942) (b)equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a)prospects 1 16 (b)equity investments (c)other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other (provide details if material) ------------ ------------ Net investing cash flows (1,951) (3,926) ------------ ------------ 1.13 Total operating and investing cash flows (14,687) (27,702) (carried forward) ------ -------------------------- ------------ ------------ 1.13 Total operating and investing cash flows (14,687) (27,702) (brought forward) ------ -------------------------- ------------ ------------ Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, 41,720 42,411 etc. 1.15 Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other (provide details if material) ------------ ------------ Net financing cash flows 41,720 42,411 ------ ---------------------- ------------ ------------ Net increase (decrease) in cash held 27,033 14,708 1.20 Cash at beginning of quarter/year to date 13,642 25,967 1.21 Exchange rate adjustments to item 1.20 ------------ ------------ 1.22 Cash at end of quarter 40,675 40,675 ------ ---------------------- ------------ ------------ Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities ------------- Current quarter $A'000 ------------- 1.23 Aggregate amount of payments to the parties included in 224 item 1.2 ------------- 1.24 Aggregate amount of loans to the parties included in - item 1.10 ------ -------------------------------- ------------- 1.25 Explanation necessary for an understanding of the transactions ------------------------------------------- Item 1.23 includes salaries, director fees and superannuation paid to directors during the quarter. ------------------------------------------- Non-cash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows -------------------------------------------- N/A -------------------------------------------- 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest -------------------------------------------- N/A -------------------------------------------- Financing facilities available Add notes as necessary for an understanding of the position. ------------- ------------- Amount available Amount used $A'000 $A'000 ------------- ------------- 3.1 Loan facilities - - ------------- ------------- 3.2 Credit standby arrangements - - ----- ----------------------- ------------- ------------- Estimated cash outflows for next quarter $A'000 ------------------ 4.1 Exploration and evaluation 12,000 ------------------ 4.2 Development - ----- ----------------------------- ------------------ Total 12,000 ----- ----------------------------- ------------------ Reconciliation of cash ------------------------- ------------ ------------- Reconciliation of cash at the end of the quarter Current Previous (as shown in the consolidated statement of cash quarter quarter flows) to the related items in the accounts is as follows. $A'000 $A'000 ------------------------- ------------ ------------- 5.1 Cash on hand and at bank 40,675 13,642 ------------ ------------- 5.2 Deposits at call ------------ ------------- 5.3 Bank overdraft ------------ ------------- 5.4 Other (provide details) ----- ---------------------- ------------ ------------- Total: cash at end of quarter (item 1.22) 40,675 13,642 ----- ---------------------- ------------ ------------- Changes in interests in mining tenements -------- --------------- -------- -------- Tenement Nature of Interest at Interest reference interest beginning of at end of quarter quarter (note (2)) -------- --------------- -------- -------- 6.1 Interests in mining tenements relinquished, reduced or lapsed -------- --------------- -------- -------- 6.2 Interests in mining tenements acquired or increased -------- --------------- -------- -------- Issued and quoted securities at end of current quarter Description includes rate of interest and any redemption or conversion rights together with prices and dates. Total number Number quoted Issue price Amount paid per security up per (see note 3) security (cents) (see note 3) (cents) ------ ---------- ---------- ---------- ----------- ----------- 7.1 Preference +securities (description) ------ ---------- ---------- ---------- ----------- ----------- 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs, redemptions ------ ---------- ---------- ---------- ----------- ----------- 7.3 +Ordinary 1,347,653,935 1,347,653,935 securities ---------- ---------- ----------- ----------- 7.4 Changes 149,000,000 149,000,000 28.0 28.0 during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs ------ ---------- ---------- ---------- ----------- ----------- 7.5 +Convertible debt securities (description) ---------- ---------- ----------- ----------- 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted ------ ---------- ---------- ---------- ----------- ----------- 7.7 Options 8,000,000 Exercise Expiry date (description price and conversion factor) 1,500,000 One third 30/9/2007 each at: 12 cents; 13 cents; 15 cents respectively 3,750,000 17.25 cents 30/9/2007 1,500,000 15 cents 2/12/2007 2,300,000 25 cents 30/9/2008 20.5 cents 30/09/2011 ---------- ---------- ----------- ----------- 7.8 Issued during quarter ---------- ---------- ----------- ----------- 7.9 Exercised during quarter ---------- ---------- ----------- ----------- 7.10 Expired during quarter ------ ---------- ---------- ---------- ----------- ----------- 7.11 Debentures (totals only) ------ ---------- ---------- ---------- 7.12 Unsecured notes (totals only) ---------- ---------- Compliance statement 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4). 2 This statement does give a true and fair view of the matters disclosed. Sign here: Managing Director Richard Laufmann Date: 30 January 2007 Notes 1 The quarterly report provides a basis for informing the market how the entity's activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report. 2 The "Nature of interest" (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2. 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities. 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report. 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with. == == == == == This information is provided by RNS The company news service from the London Stock Exchange END IR IIFLVLDIIVID
1 Year Ballarat Gold Chart |
1 Month Ballarat Gold Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions