ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

AAI Atlas Afric

0.095
0.00 (0.00%)
20 Dec 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Atlas Afric LSE:AAI London Ordinary Share GG00B9B3DY50 ORD NPV
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.095 0.00 00:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Atlas Dev & Support Services Ltd Ground Clearing Begins at Ethiopian Bottling Plant (6677P)

22/02/2016 7:00am

UK Regulatory


Atlas Afric (LSE:AAI)
Historical Stock Chart


From Dec 2019 to Dec 2024

Click Here for more Atlas Afric Charts.

TIDMADSS

RNS Number : 6677P

Atlas Dev & Support Services Ltd

22 February 2016

Atlas Development & Support Services Limited / Ticker: ADSS / Index: AIM / Sector: Support Services

22 February 2016

Atlas Development & Support Services Limited

('Atlas' or the 'Company')

Ground Clearing Begins at Ethiopian Bottling Plant

Atlas (AIM, NSE: ADSS), has commenced ground clearing at its 'Chancho Project' in Ethiopia, a new state-of-the-art facility 45km north of the capital, Addis Ababa, which will have capacity to produce 105 million 330ml bottles per annum. To commemorate this landmark development, an official ground breaking ceremony was held on 15 February 2016 and attended by local dignitaries and members of the Board.

To view photos taken at the official ground breaking ceremony, please visit the Company's website at www.atlassupport.com/industrial.

Levelling of the 5.5 acre Chancho Project site has begun and the top soil has been stripped. The work is being conducted through the Company's newly formed industrial division, which is focussed on consumer based industrial projects in Africa, in conjunction with the Company's joint venture company, Orchid Group ('Orchid').

The Chancho Project site is located in an established industrial area that is serviced by excellent road infrastructure as well as power. It is also within trucking distance of the intended mine sites for the materials needed to produce high quality bottles, being silica sand, limestone, dolomite, feldspar and soda ash. Preliminary assessments of potential sources and studies of local mining operations carried out confirm appropriate grades of silica sand and limestone are available in deposits 30km away from the site.

An initial pre-feasibility study has been completed at the Chancho Project, which has returned highly positive results. A full feasibility study is now being conducted in tandem with local and international engineering consultants, which is close to completion. Commissioning of the facility has been scheduled for 2018, with full production targeted for early 2019.

Chief Executive of Atlas, Carl Esprey said, "We are delighted to have broken ground at the Chancho Project, our state-of-the-art glass manufacturing facility neighbouring Addis Ababa. The Project has been an excellent acquisition for us, giving us a foothold in the burgeoning Ethiopian consumer market and positioning us at the forefront of advancements in the East African manufacturing sector. We are delighted with the progress that has been made so far and the ground breaking ceremony marks another momentous step in our transition into exciting new territory. We can now look forward to commencing development of the project site over the coming year and updating the market on our progress in due course."

Market Opportunity

For the last five years, due to increasing consumer demand and a young demographic, Ethiopia has been attracting significant investment from international beverage companies, with over $500 million invested to date. Beer production has been growing at a CAGR of 14.3% over the last 14 years with an additional 47% capacity currently under construction. The demand for glass bottles is largely unmet by local production and is at present mainly satisfied by expensive imports. There is strong demand for locally produced glass bottles in Ethiopia which Atlas aims to meet, through the development of the Chancho Project.

The Ethiopian government has designated manufacturing as a top priority, and support via development debt funding is, in principle, available for projects that substitute imports. Ethiopia represents one of the fastest growing economies in the world, as a result of rising income, population growth, well managed infrastructure spending, and stable government policies.

** ENDS **

For further information please visit www.atlassupport.com or contact:

 
 Carl Esprey        Atlas Development        Tel: +44 (0) 
                     & Support Services       20 7408 9200 
 Callum Stewart     Stifel Nicolaus Europe   Tel: +44 (0) 
                     Limited                  20 7710 7600 
 Ashton Clanfield   Stifel Nicolaus Europe   Tel: +44 (0) 
                     Limited                  20 7710 7600 
 Edward Burbidge    Burbidge Capital         Tel: +254 (0) 
                                              202 100 102 
 Hugo de            St Brides Partners       Tel: +44 (0) 
  Salis              Ltd                      20 7236 1177 
 Charlotte          St Brides Partners       Tel: +44 (0) 
  Heap               Ltd                      20 7236 1177 
 

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCEAEAEAAEKEAF

(END) Dow Jones Newswires

February 22, 2016 02:00 ET (07:00 GMT)

1 Year Atlas Afric Chart

1 Year Atlas Afric Chart

1 Month Atlas Afric Chart

1 Month Atlas Afric Chart

Your Recent History

Delayed Upgrade Clock