ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

HUDRF AnorTech Inc (PK)

0.0169
0.00 (0.00%)
31 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
AnorTech Inc (PK) USOTC:HUDRF OTCMarkets Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.0169 0.0178 0.04 0.00 21:02:34

Hudson Reports High Grade Rare Earth Assays from 2012 Drill Program on the Sarfartoq Project in Greenland

21/01/2013 7:22pm

OTC Markets


HUDSON RESOURCES INC. (“Hudson” or “the Company” – TSX-V: “HUD”, OTCQX: “HUDRF”) is pleased to announce the 2012 drill results for the Sarfartoq light rare earth element (“REE”) project in Greenland. A total of 5,555 meters of diamond core drilling was completed in connection with rare earth exploration and development. Nineteen holes were drilled in the vicinity of the ST1 Zone resource. The other four were exploration holes drilled on the south side of the carbonatite at the ST24 target. Complete drill results are presented in Table 2 below and a map of the drill locations will be available on the Company’s website.

2012 Drill Program Highlights:
- Sixteen drill holes surrounding and infilling the ST1 Zone resource area contained high-grade intersections including:

  • 6 meters of 6.05% TREO (SAR12-03)

  • 6 meters of 4.91% TREO (SAR12-01)

  • 8 meters of 4.61% TREO (SAR12-15)

  • 6 meters of 4.34% TREO (SAR12-15)


- Wide zones of neodymium mineralization at ST1 continue to demonstrate the high proportion of neodymium that has been outlined in the resource.

- Drill results confirm continuation of high-grade mineralization at depth.

James Tuer, Hudson’s President, stated, “We are very pleased with the results from our 2012 drill program. We have continued to demonstrate that the mineralization extends to the northeast and have intersected some of our highest-grade material as we move in that direction. Drilling to the south confirmed that the mineralization continues at depth with a high ratio of neodymium to total rare earth oxides at 23%. We expect that these results will increase the overall grade and tonnage of the resource when they have been incorporated into the resource model”.

“Going forward, our efforts at the ST1 Zone will focus on defining the metallurgical flow sheet as we have already outlined a sufficiently large and potentially economic deposit. We expect to have our flow sheet completed by the end of the second quarter of this year. This is a relatively low-cost exercise but it is critical in demonstrating the viability of a REE deposit.”

“The bulk of the Company’s capital budget for 2013 will be focused on our White Mountain anorthosite project, where the Company has made substantial progress in a relatively short time. We expect to have significant updates on this project over the next several months.”

The ST1 Zone at Sarfartoq represents one of the industry’s highest ratios of neodymium and praseodymium to TREO, averaging 25%, based on the inferred resource. Based on the latest resource model, the ST1 Zone contains over 27 million kilograms of neodymium oxide and 8 million kilograms of praseodymium oxide, which are the key components in permanent magnets and the fastest growing sector of the rare earths industry.

Table 1: 2012 High-Grade Intercepts of Neodymium and Praseodymium Oxide.

Hole ID    From    To    Intersection    TREO    (Nd+Pr)2O3
 
--------------------------------------------------------------------------------------------------------------------------
ST-1 North
SAR12-01    141.0    147.0    6.0    4.91%    9.9
--------------------------------------------------------------------------------------------------------------------------
SAR12-03    126.0    132.0    6.0    6.05%    11.4
--------------------------------------------------------------------------------------------------------------------------
SAR12-04    148.0    154.0    6.0    3.86%    8.2
--------------------------------------------------------------------------------------------------------------------------
ST1 South
SAR12-05    352.0    358.0    6.0    3.23%    7.1
--------------------------------------------------------------------------------------------------------------------------
SAR12-07    386.0    406.0    20.0    2.36%    5.5
--------------------------------------------------------------------------------------------------------------------------
ST1 Infill
SAR12-06    192.0    212.0    20.0    3.16%    6.7
--------------------------------------------------------------------------------------------------------------------------
SAR12-20    92.0    100.0    8.0    3.90%    7.8
--------------------------------------------------------------------------------------------------------------------------
SAR12-21    45.0    55.0    10.0    2.39%    5.3
--------------------------------------------------------------------------------------------------------------------------
SAR12-22    146.0    174.0    28.0    1.85%    5.2
     276.0    296.0    20.0    2.35%    5.7
--------------------------------------------------------------------------------------------------------------------------
ST1 North Extension
SAR12-152.    163.0    169.0    6.0    4.34%    7.2
     275.0    283.0    8.0    4.61%    6.7
--------------------------------------------------------------------------------------------------------------------------
SAR12-182.    154.0    168.0    14.0    3.00%    4.8
     200.0    208.0    8.0    3.48%    4.8
--------------------------------------------------------------------------------------------------------------------------
SAR12-192.    46.0    52.0    6.0    3.11%    5.2
--------------------------------------------------------------------------------------------------------------------------
Note 1. The 2012 drill holes at ST1 were generally drilled at an azimuth of approximately 310 degrees and a dip of between 45 and 65 degrees. As a result, true widths are estimated to be 80% to 95% of reported intersections. An estimate of the true width for holes SAR12-01, 02, 04, 05, and 19 can not be determined until the resource has been updated.
Note 2. These results were previously published on September 24, 2012.
Note 3. Neodymium Oxide (Nd2O3) currently trades for $82.50/kg and Praseodymium Oxide (Pr2O3) trades for $90/kg FOB China (ref: Industrial Minerals on line, January 15, 2013).


Table 2: Complete 2012 Sarfartoq Drill Results

Hole ID                        To    From    Intersection    TREO    (Nd+Pr)2O3    (Nd+Pr)2O3
                         (m)    (m)    (m)         /TREO    (kg/t)
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-01    ST-1 N                   137.0    151.0    14.0    3.49%    20.10%    7.02
               incl         141.0    147.0    6.0    4.91%    20.10%    9.87
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-02    ST-1 S                   192.0    194.0    2.0    3.03%    25.20%    7.63
          and              302.0    304.0    2.0    2.14%    22.80%    4.87
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-03    ST-1 N                   126.0    140.0    14.0    4.26%    18.80%    8.02
               incl         126.0    132.0    6.0    6.05%    18.90%    11.42
          and              156.0    158.0    2.0    2.36%    18.70%    4.40
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-04    ST-1 N                   138.0    158.0    20.0    2.35%    20.40%    4.78
               incl         148.0    154.0    6.0    3.86%    21.20%    8.17
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-05    ST-1 S                   82.0    86.0    4.0    1.53%    27.80%    4.26
          and              270.0    272.0    2.0    2.11%    24.40%    5.15
          and              332.0    372.0    40.0    1.68%    25.60%    4.31
               incl         352.0    358.0    6.0    3.23%    22.00%    7.10
          and              418.0    448.0    30.0    1.17%    30.00%    3.51
               incl         420.0    428.0    8.0    1.82%    34.60%    6.31
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-06    ST-1 Infill                   172.0    174.0    2.0    2.76%    20.40%    5.63
          and              184.0    220.0    36.0    2.15%    21.60%    4.65
               incl         192.0    212.0    20.0    3.16%    21.20%    6.70
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-07    ST-1 S                   360.0    406.0    46.0    1.73%    26.20%    4.55
               incl         386.0    406.0    20.0    2.36%    23.50%    5.53
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-08    ST-1N                   156.0    160.0    2.0    0.41%    36.90%    1.50
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-09    ST-24    No significant results
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-10    ST-1N                   23.0    25.0    2.0    2.42%    16.60%    4.03
          and              31.7    33.3    1.6    6.22%    16.00%    9.97
          and              94.0    96.0    2.0    3.85%    19.50%    7.52
          and              204.0    206.0    2.0    2.09%    17.60%    3.67
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-11    ST-24    No significant results
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-12    ST-1N                   189.0    191.0    2.0    2.21%    19.40%    4.28
          and              233.0    235.0    2.0    4.73%    19.00%    8.98
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-13    ST-24                   22.0    24.0    2.0    2.15%    16.30%    3.52
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-14    ST-24    No significant results
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-15    ST-1 North Extension         90.0    100.0    10.0    3.42%    16.00%    5.47
          and              163.0    177.0    14.0    2.74%    16.90%    4.64
               incl         163.0    169.0    6.0    4.34%    16.70%    7.24
          and              233.0    287.0    54.0    2.11%    15.70%    3.32
               incl         243.0    251.0    8.0    2.54%    16.60%    4.22
               and         257.0    269.0    12.0    2.91%    15.80%    4.60
               and         275.0    283.0    8.0    4.61%    14.50%    6.66
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-16    ST-1 S     Failed to reach target depth
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-17    ST-1 S     Failed to reach target depth
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-18    ST-1 North Extension         38.0    40.0    2.0    2.28%    17.30%    3.93
          and              48.0    56.0    8.0    2.59%    17.20%    4.46
          and              82.0    90.0    8.0    1.65%    17.90%    2.95
          and              116.0    124.0    8.0    2.29%    16.50%    3.77
          and              154.0    168.0    14.0    3.00%    16.10%    4.84
          and              200.0    208.0    8.0    3.48%    13.90%    4.85
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-19    ST-1 North Extension         46.0    52.0    6.0    3.11%    17.60%    5.25
          and              134.0    136.0    2.0    2.57%    17.60%    4.53
          and              148.0    150.0    2.0    2.89%    13.60%    3.93
          and              156.0    158.0    2.0    2.46%    16.40%    4.03
          and              160.0    162.0    2.0    4.62%    13.20%    6.08
          and              172.0    174.0    2.0    2.18%    14.60%    3.19
          and              198.0    200.0    2.0    2.70%    15.70%    4.23
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-20    ST-1 Infill                   74.0    104.0    30.0    2.18%    16.10%    4.69
               incl         78.0    84.0    6.0    2.66%    21.50%    5.72
               and         92.0    100.0    8.0    3.90%    20.10%    7.85
          and              160.0    172.0    12.0    2.38%    22.30%    5.32
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-21    ST-1 Infill                   37.0    59.0    22.0    1.79%    22.20%    3.97
               incl         45.0    55.0    10.0    2.39%    22.20%    5.30
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-22    ST-1 Infill                   42.0    300.0    258.0    1.15%    27.30%    3.15
               incl         52.0    56.0    4.0    1.41%    30.90%    4.35
               incl         142.0    296.0    154.0    1.57%    26.40%    4.13
                    incl    146.0    174.0    28.0    1.85%    28.20%    5.21
               and         224.0    296.0    72.0    1.87%    25.40%    4.74
                    incl    276.0    296.0    20.0    2.35%    24.20%    5.69
------------------------------------------------------------------------------------------------------------------------------------------------
SAR12-23    ST-1 Infill:    Hole abandoned after 23m due to mechanical failure
------------------------------------------------------------------------------------------------------------------------------------------------
Note: All measurements are in meters. All elements reported by Actlabs are in parts per million (ppm) and have been converted to % oxide. Total Rare Earth Oxides (TREO) refers to the elements lanthanum through lutetium plus yttrium expressed as oxides in the form REE2O3


Drill core was logged and sampled in the field and split core was shipped to North Vancouver, BC for processing at ALS Canada Ltd. A strict QA/QC program was followed, which includes the use of elemental standards, duplicates and blanks. In cases where the entire hole was not sampled, only significant drill intersections of carbonate mineralization were sampled. Core was split in the field with half of the core being sent to ALS Chemex and the remaining half stored on-site for future reference. All samples were analyzed using lithium borate fusion, acid dissolution and ICP-MS analysis.

The Sarfartoq REE project is located within 20 km of tidewater and only 60 km from Greenland’s international airport at Kangerlussuaq. The project is owned 100% by Hudson. The Company remains well financed with approximately $7 million in working capital.

Dr. Michael Druecker is a qualified person as defined by National Instrument 43-101 and reviewed the preparation of the scientific and technical information in this press release in respect of the Sarfartoq REE Project.

BY ORDER OF THE BOARD OF DIRECTORS
"James Tuer"
James Tuer, President

1 Year AnorTech (PK) Chart

1 Year AnorTech (PK) Chart

1 Month AnorTech (PK) Chart

1 Month AnorTech (PK) Chart