ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

HUDRF AnorTech Inc (PK)

0.0169
0.00 (0.00%)
31 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
AnorTech Inc (PK) USOTC:HUDRF OTCMarkets Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.0169 0.0178 0.04 0.00 21:02:34

Correction: Hudson Reports Additional High Grade Assays at Greenland Rare Earth Project

03/11/2011 3:44pm

Marketwired


AnorTech (PK) (USOTC:HUDRF)
Historical Stock Chart


From Jun 2019 to Jun 2024

Click Here for more AnorTech (PK) Charts.


Marketwire issues a correction for the press release disseminated earlier today at 9:10 AM ET. An incomplete version of the press release was disseminated in error. The full, corrected and complete press release follows:

HUDSON RESOURCES INC. (the "Company") (TSX VENTURE:HUD)(OTCQX:HUDRF) is pleased to announce the 2011 Phase Two drill results for the Sarfartoq rare earth element project in Greenland. Phase Two drilling included 4,888m of infill and step out drilling at the ST1 Zone where the Company has outlined a 43-101 compliant inferred resource of 14.1Mt at 1.5% TREO. An additional 1,858m of exploratory drilling was also completed peripheral to ST1. A further 1,450m of drilling was completed in the ST19 area located approximately 9km southeast of ST1. Complete drill results are presented in Table 3 below. In total 16,514m over 71 holes were drilled this year. In addition, a 5 tonne metallurgical sample was collected from surface.

2011 Phase Two Highlights:


--  Fourteen holes at the ST1 Zone intercepted high-grade intervals assaying
    from 2.07% TREO to 6.49% TREO - averaging 3.6% TREO over 10.5m. In
    total, the 2011 drill program had 19 high-grade intercepts (minimum 10m)
    averaging 13m of 3.3% TREO. 
--  The highest grade intercept to date of 6.5% TREO over 8m was drilled at
    the north end of the ST1 Zone - well outside of the current resource
    model. 
--  Wide zones of mineralization at ST1 include 60m of 2.7%, 74m of 2.2% and
    66m of 2.0% TREO. 
--  An ST19 intercept of 56 m of 2.76% TREO including 14.0 m of 3.53% TREO.
--  New high-grade system discovered 900m to the north east of the ST1 Zone
    in hole SAR11-50 with 14.0m of 3.3% TREO including 4.0m of 7.2% TREO. 


Table 1: 2011 Phase Two High-Grade Intercepts at the ST1 Zone
              
                                      Intersection                         
Hole ID           From (m)    To (m)         (1)(m)     TREO     Nd2O3/TREO
---------------------------------------------------------------------------
---------------------------------------------------------------------------
SAR11-36            192.0     198.0            6.0     2.84%          14.5%
---------------------------------------------------------------------------
SAR11-37            304.0     316.0           12.0     3.11%          19.8%
---------------------------------------------------------------------------
SAR11-38            198.0     202.0            4.0     4.28%          14.7%
---------------------------------------------------------------------------
SAR11-40             36.0      48.0           12.0     2.82%          16.9%
---------------------------------------------------------------------------
SAR11-42            150.0     158.0            8.0     3.36%          16.5%
---------------------------------------------------------------------------
SAR11-44             52.0      62.0           10.0     2.68%          16.0%
                     72.0      82.0           10.0     2.70%          16.5%
---------------------------------------------------------------------------
SAR11-45             28.0      44.0           16.0     2.91%          17.3%
                     70.0      84.0           14.0     4.76%          14.9%
---------------------------------------------------------------------------
SAR11-56            158.0     166.0            8.0     3.85%          14.4%
---------------------------------------------------------------------------
SAR11-58            254.0     276.0           22.0     3.95%          15.8%
---------------------------------------------------------------------------
SAR11-62            134.0     142.0            8.0     4.91%          14.2%
---------------------------------------------------------------------------
SAR11-64            192.0     198.0            6.0     3.72%          16.3%
---------------------------------------------------------------------------
SAR11-66            154.0     166.0           12.0     3.68%          15.0%
---------------------------------------------------------------------------
SAR11-69(2)         152.0     164.0           12.0     2.07%          26.8%
---------------------------------------------------------------------------
SAR11-71            134.0     142.0            8.0     6.49%          13.7%
---------------------------------------------------------------------------
Note 1. The 2011 drill holes at ST1 were generally drilled at an azimuth of 
310 degrees and a dip of between 45 and 65 degrees. As a result, true widths
for holes SAR11-36, -42, and SAR11-64 are estimated to be 95% to 80% of     
reported intersections, respectively. An estimate of the true width of the  
other holes can not be determined until the resource has been updated.
     
Note 2. This intersection was added due to the very high proportion of      
neodymium in the sample.                                                    

James Tuer, Hudson's President, stated, "We are very pleased with the results from our 2011 Phase Two drill program. We have now demonstrated that the mineralization extends to the northeast and have intersected some of our highest grade material as we move in that direction. A step out hole almost a kilometer north of ST1 intercepted some of our highest grade material to date and confirms the exploration potential of this largely untested Sarfartoq carbonatite. Now that all of our 2011 drill results are in we will be working towards preparing an updated resource model in the coming months. Based on this years results, we expect to be able to move resources from the inferred to indicated category and increase the overall grade of the resource."

The Preliminary Economic Assessment (PEA), which is being carried out by Wardrop, a Tetra Tech Company, is now expected to be completed in the next two weeks. Metallurgical test-work is ongoing at Hazen Research in Colorado and the Saskatchewan Research Council in Saskatoon. The metallurgical studies are being conducted under the direction of John Goode, P. Eng. John has extensive experience in the rare earth industry in North America and China.

The distribution of individual rare earth oxides as a percentage of the total rare earth oxides from the Phase Two results are documented in Table 2. The results for the ST1 Zone are consistent with previous assay results and demonstrate a high proportion of neodymium oxide to total rare earth oxides. Note that the gross amount of neodymium oxide is approximately the same at each location which is important since Hudson currently anticipates developing the resource primarily as a neodymium mine. Neodymium prices remain robust with neodymium oxide currently quoted at US$240/kg, FOB China, and at US$145/kg, within China, according to www.metal-pages.com.


Table 2: Distribution of Rare Earths in Phase Two Samples
                 
            Average                                                        
Area          Width    TREO   La2O3   Ce2O3   Pr2O3   Nd2O3   Sm2O3   Eu2O3
---------------------------------------------------------------------------
---------------------------------------------------------------------------
ST1-CARB         31    1.7%   23.3%   50.0%    5.4%   17.6%    1.7%    0.4%
ST1-E-CARB        7    2.1%   28.2%   49.3%    4.8%   14.3%    1.4%    0.3%
ST19-CARB        15    3.0%   33.1%   48.2%    4.1%   11.8%    1.1%    0.2%
                                                                           
Area                          Gd2O3   Tb2O3   Dy2O3    Y2O3   Other   Total
                           ------------------------------------------------
                           ------------------------------------------------
ST1-CARB                       0.9%    0.1%    0.2%    0.4%    0.0%  100.0%
ST1-E-CARB                     0.9%    0.1%    0.2%    0.4%    0.0%  100.0%
ST19-CARB                      0.7%    0.1%    0.2%    0.5%    0.1%  100.0%

Note: "CARB" refers to carbonatite the Company has identified as likely to  
be mineralized based on lithology.                                          


Table 3: Complete 2011 Phase Two Drill Results
                                                            
                                                Ele-        Azimuth     Dip
                                             vation   Depth    (deg-   (deg-
Hole ID    Area           Easting  Northing      (m)     (m)   rees)   rees)
---------------------------------------------------------------------------
---------------------------------------------------------------------------
SAR11-36   ST-1            485368   7378442     657     214     310     -70
SAR11-37   ST-1            485160   7378155     643     360     310     -65
SAR11-38   ST-1            485368   7378442     657     269     310     -75
SAR11-39   ST-1            485091   7378223     635     262     310     -70
SAR11-40   ST-1            485188   7378340     647     192     310     -50
SAR11-41   ST-1            485091   7378223     635     192     310     -45
SAR11-42   ST-1            485217   7378372     646     189     310     -45
SAR11-43   ST-1            485139   7378314     642     252     310     -50
SAR11-44   ST-1            485217   7378372     646     116     120     -60
SAR11-45   ST-1            485217   7378372     646     153     120     -80
SAR11-46   ST-1 east       485331   7378675     667     207     180     -55
SAR11-47   ST-1 east       485745   7378835     671     214     180     -55
SAR11-48   ST-1 east       485735   7378857     675     246     315     -55
SAR11-49   ST-1 east       485331   7378675     667     240       0     -55
SAR11-50   ST-1 east       486258   7378784     682     244     315     -55
SAR11-51   ST-1 east       485098   7378702     688     311      90     -60
SAR11-52   ST-1 east       485921   7378567     676     259     315     -55
SAR11-53   ST-1            485324   7378541     603      76     130     -45
SAR11-54   ST-1            485324   7378541     603     256     130     -55
SAR11-55   ST-1 south      485760   7378252     676     137     220     -45
SAR11-56   ST-1            485324   7378541     603     207     130     -70
SAR11-57   ST-19E          489119   7370340     590     143     150     -75
SAR11-58   ST-1            485222   7378369     646     311      44     -49
SAR11-59   ST-19E          489119   7370340     590     198       0     -90
SAR11-60   ST-19E          489119   7370340     590     217      15     -82
SAR11-61   ST-19E          489320   7370398     589     238     224     -50
SAR11-62   ST-1            485252   7378419     646     166     130     -75
SAR11-63   ST-19E          489012   7370290     524     210      10     -50
SAR11-64   ST-1            485361   7378381     687     229     315     -63
SAR11-65   ST-19 Gorge     488101   7370498     553     299     215     -80
SAR11-66   ST-1            485322   7378452     647     174     225     -85
SAR11-67   ST-19 Gorge     488008   7370552     556     232     250     -75
SAR11-68A  ST-1            485568   7378397     677      18     310     -45
SAR11-68   ST-1            485568   7378397     677     366     310     -50
SAR11-69   ST-1            484980   7378285     550     372     179     -54
SAR11-70   ST-1            485044   7377993     626     314     310     -73
SAR11-71   ST-1            485377   7378547     611     214      57     -80


                                             Intersection             Nd2O3/
Hole ID      Area          From (m)   To (m)           (m)   TREO      TREO
---------------------------------------------------------------------------
---------------------------------------------------------------------------
SAR11-36     ST-1            192.0    198.0           6.0   2.84%     14.5%
---------------------------------------------------------------------------
SAR11-37     ST-1            260.0    326.0          66.0   1.96%     19.5%
                      incl.  272.0    286.0          14.0   2.54%     16.4%
                      incl.  302.0    318.0          16.0   2.88%     19.5%
                      incl.  304.0    316.0          12.0   3.11%     19.8%
---------------------------------------------------------------------------
SAR11-38     ST-1            140.0    146.0           6.0   2.00%     15.7%
                      and    192.0    204.0          12.0   1.97%     15.5%
                      incl.  198.0    202.0           4.0   4.28%     14.7%
---------------------------------------------------------------------------
SAR11-39     ST-1            148.0    204.0          56.0   1.51%     23.0%
                      incl.  154.0    180.0          26.0   1.73%     21.9%
                      and    232.0    252.0          20.0   1.00%     23.6%
---------------------------------------------------------------------------
SAR11-40     ST-1             18.0     48.0          30.0   1.67%     17.8%
                      incl.   36.0     48.0          12.0   2.82%     16.9%
---------------------------------------------------------------------------
SAR11-41     ST-1             90.0    104.0          14.0   1.53%     22.2%
                      and    124.0    134.0          10.0   0.89%     27.8%
---------------------------------------------------------------------------
SAR11-42     ST-1              5.7     28.0          22.3   1.09%     17.0%
                      and    150.0    164.0          14.0   2.61%     16.9%
                      incl.  150.0    158.0           8.0   3.36%     16.5%
---------------------------------------------------------------------------
SAR11-43     ST-1             28.0     46.0          18.0   1.86%     17.7%
                      and     60.0     80.0          20.0   1.34%     21.7%
                      and    148.0    188.0          40.0   0.77%     25.1%
---------------------------------------------------------------------------
SAR11-44     ST-1             28.0     92.0          64.0   1.44%     16.7%
                      incl.   52.0     62.0          10.0   2.68%     16.0%
                      incl.   72.0     82.0          10.0   2.70%     16.5%
---------------------------------------------------------------------------
SAR11-45     ST-1             16.0     90.0          74.0   2.15%     17.5%
                      incl.   28.0     44.0          16.0   2.91%     17.3%
                      incl.   36.0     44.0           8.0   4.04%     15.4%
                      incl.   66.0     86.0          20.0   4.15%     15.4%
                      incl.   70.0     84.0          14.0   4.76%     14.9%
---------------------------------------------------------------------------
SAR11-46     ST-1 east       148.0    154.0           6.0   2.32%     15.5%
                      and    190.0    194.0           4.0   3.33%     14.9%
---------------------------------------------------------------------------
SAR11-47     ST-1 east       103.0    109.0           6.0   1.62%     14.3%
---------------------------------------------------------------------------
SAR11-48     ST-1 east       106.0    121.0          15.0   1.23%     15.9%
---------------------------------------------------------------------------
SAR11-49     ST-1 east        16.0     22.0           6.0   1.32%     15.8%
                      and     40.0     44.0           4.0   1.55%     16.8%
---------------------------------------------------------------------------
SAR11-50     ST-1 east       206.0    220.0          14.0   3.26%     13.0%
                      incl.  206.0    210.0           4.0   7.15%     12.3%
                      incl.  216.0    218.0           2.0   5.90%     12.0%
---------------------------------------------------------------------------
SAR11-51     ST-1 east       282.0    286.0           4.0   1.74%     18.5%
---------------------------------------------------------------------------
SAR11-52     ST-1 east       203.7    204.9           1.2   5.46%     13.9%
---------------------------------------------------------------------------
SAR11-53     ST-1               No Significant intersections over 2m       
---------------------------------------------------------------------------
SAR11-54     ST-1             48.0     58.0          10.0   1.04%     17.0%
                      and    166.0    178.0          12.0   1.06%     18.5%
---------------------------------------------------------------------------
SAR11-55     ST-1 south         No Significant intersections over 2m       
---------------------------------------------------------------------------
SAR11-56     ST-1            148.0    166.0          18.0   2.08%     15.4%
                      incl.  158.0    166.0           8.0   3.85%     14.4%
---------------------------------------------------------------------------
SAR11-57     ST-19E           32.0     54.0          22.0   3.04%     12.6%
                      incl.   32.0     46.0          14.0   3.62%     11.8%
---------------------------------------------------------------------------
SAR11-58     ST-1             30.0    132.0         102.0   0.87%     16.6%
                      incl.  104.0    110.0           6.0   1.85%     16.5%
                      incl.  126.0    132.0           6.0   1.66%     15.5%
                      and    232.0    292.0          60.0   2.65%     16.3%
                      incl.  252.0    288.0          36.0   3.53%     16.0%
                      incl.  254.0    276.0          22.0   3.95%     15.8%
---------------------------------------------------------------------------
SAR11-59     ST-19E           46.0     50.0           4.0   4.90%     11.3%
                      and     76.0    132.0          56.0   2.76%     12.5%
                      incl.   82.0    104.0          22.0   3.74%     10.5%
                      and    108.0    122.0          14.0   3.53%     11.9%
---------------------------------------------------------------------------
SAR11-60     ST-19E           54.0     58.0           4.0   2.20%     11.3%
---------------------------------------------------------------------------
SAR11-61     ST-19E                          Not Sampled                   
---------------------------------------------------------------------------
SAR11-62     ST-1             60.0    144.0          84.0   1.69%     17.3%
                      incl.  102.0    112.0          10.0   2.21%     19.0%
                      incl.  130.0    144.0          14.0   4.04%     15.0%
                      incl.  134.0    142.0           8.0   4.91%     14.2%
---------------------------------------------------------------------------
SAR11-63     ST-19E             No Significant intersections over 2m       
---------------------------------------------------------------------------
SAR11-64     ST-1            172.0    214.0          42.0   1.58%     17.2%
                      incl.  192.0    198.0           6.0   3.72%     16.3%
---------------------------------------------------------------------------
SAR11-65     ST-19 Gorge     272.0    274.0           2.0   3.56%     12.9%
---------------------------------------------------------------------------
SAR11-66     ST-1            144.0    170.0          26.0   2.34%     15.8%
                      incl.  154.0    166.0          12.0   3.68%     15.0%
---------------------------------------------------------------------------
SAR11-67     ST-19 Gorge      16.5     18.5           2.0   4.56%     13.9%
---------------------------------------------------------------------------
SAR11-68A    ST-1                            Not Sampled                   
---------------------------------------------------------------------------
SAR11-68     ST-1            316.0    320.0           4.0   1.65%     15.7%
---------------------------------------------------------------------------
SAR11-69     ST-1            136.0    182.0          46.0   1.37%     24.4%
                      incl.  152.0    164.0          12.0   2.07%     26.8%
                      and    258.0    268.0          10.0   1.65%     20.3%
                      and    350.0    360.0          10.0   2.04%     19.5%
---------------------------------------------------------------------------
SAR11-70     ST-1            No Significant intersections over 2m - Hole   
                             terminated prior to targeted mineralization   
---------------------------------------------------------------------------
SAR11-71     ST-1            128.0    144.0          16.0   3.96%     14.3%
                      incl.  134.0    142.0           8.0   6.49%     13.7%
---------------------------------------------------------------------------
Note: All measurements are in metres. Elevation is height above sea level. 
All elements reported by Actlabs are in parts per million (ppm) and have   
been converted to % oxide. Total Rare Earth Oxides (TREO) refers to the    
elements lanthanum through lutetium plus yttrium expressed as oxides in the
form REE2O3.                                                               

Drill core was logged and sampled in the field and split core was shipped to Ancaster Ontario for processing at Activation Laboratories Ltd. (Actlabs). A strict QA/QC program was followed, which includes the use of elemental standards, duplicates and blanks. In cases where the entire hole was not sampled, only significant drill intersections of carbonate mineralization were sampled. Core was split in the field with half of the core being sent to Actlabs and the remaining half stored on-site for future reference. All samples were analyzed using lithium borate fusion, acid dissolution and ICP-MS analysis.

The Sarfartoq REE project is located within 20km of tidewater and only 60km from Greenland's international airport. The project is owned 100% by Hudson. The Company is currently well financed with approximately $13 million in working capital.

The ST1 Zone at Sarfartoq represents one of the industry's highest ratios of neodymium and praseodymium to TREO, totaling 25%, based on the inferred resource. The ST1 Zone contains over 40 million kilograms of neodymium oxide which is the key component in permanent magnets and the fastest growth sector of the rare earths industry.

Dr. Michael Druecker is a qualified person as defined by National Instrument 43-101 and reviewed the preparation of the scientific and technical information in this press release in respect of the Sarfartoq REE Project.

ON BEHALF OF THE BOARD OF DIRECTORS

James Tuer, President

Forward-Looking Statements

This news release includes certain forward-looking statements or information. All statements other than statements of historical fact included in this news release, including, without limitation, statements regarding plans for the completion of a financing and the intended terms and use of proceeds thereof, and other future plans and objectives of the Company are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's plans or expectations include market prices, general economic, market or business conditions, regulatory changes, timeliness of government or regulatory approvals and other risks detailed herein and from time to time in the filings made by the Company with securities regulators. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts: Hudson Resources Inc. James Tuer President 604-628-5002 or 604-688-3415 604-688-3452 (FAX)tuer@hudsonresources.cawww.hudsonresources.ca

1 Year AnorTech (PK) Chart

1 Year AnorTech (PK) Chart

1 Month AnorTech (PK) Chart

1 Month AnorTech (PK) Chart