ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

GRC Gold Springs Resource Corp

0.07
0.005 (7.69%)
24 Dec 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Gold Springs Resource Corp TSX:GRC Toronto Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.005 7.69% 0.07 0.065 0.075 0.07 0.07 0.07 1,000 17:10:23

Goldstone Reports New Discovery at Hardrock Project, Provides Mid-Year Update

29/06/2011 10:20pm

Marketwired


Gold Springs Resource (TSX:GRC)
Historical Stock Chart


From Dec 2019 to Dec 2024

Click Here for more Gold Springs Resource Charts.

Goldstone Resources Inc. (TSX: GRC) (PINK SHEETS: GRSZF) today announced that drilling at the Hardrock Project joint venture by Premier Gold Mines Limited (TSX: PG) as operator has discovered a new zone at Tenacity South with confirmed high-grade mineralization in hole HR054 up to 10.89 grams per tonne gold (g/t Au) across 10.0 metres (m) (0.32 oz/t across 32.8 feet) including 45.40 g/t Au across 2.0 m (1.33 oz/t across 6.6 feet), and hole HR053 intersections of 37.49 g/t Au across 2.1 m.

Earlier in 2011, Goldstone and Premier released a NI43-101 compliant gold resource estimate for the Hardrock Project. Numerous zones remain wide open for expansion and the western-most hole drilled to-date (MM170) intersected 18.49 g/t Au across 20.5m or 0.54 ounces per ton (oz/t) across 67.2 feet.

Ongoing 2011 drilling has realized numerous successes that are expected to add materially to the current resource. Expansion of the SP and F Zones, more recently identified horizons including the P and K Zones, and new discoveries including the Tenacity South Zone auger well for the future economics of the project. Other highlights from the 2011 drill program include:


--  Expansion drilling in the SP Zone with intercepts up to 11.25 g/t Au
    across 8.2 m and 6.02 g/t Au across 15.0 m

--  Further expansion of the F-Zone deposit with intersections of up to
    6.97g/t Au across 5.0 m

--  Continued success in the recently discovered K-Zone with new assays of
    up to 10.16 g/t Au across 3.1 m

--  Several returning high-grade vein style mineralization within the main
    porphyry unit (P Zone) with intercepts as high as 7.15 g/t Au across 6.0
    m.

"We continue to very optimistic about the development potential of the Hardrock Project, " said Goldstone Chairman and Interim CEO Philip Cunningham. "We also believe our adjoining, 100-owned Key Lake property, for which we announced latest drilling results this morning, will benefit from its proximity to Hardrock."


The following tables provide highlights from 2011 drilling so far at
 Hardrock:

----------------------------------------------------------------------
                         UTM
                 Coordinates   Dip/Azimuth
Hole-ID                  (m)     (degrees)      From (m)        To (m)
----------------------------------------------------------------------
MM203B             5502700 N
                    501700 E       -65/360         911.4         915.0
----------------------------------------------------------------------
MM209C             5502724 N
including           501806 E       -70/360         879.0         894.5
                                          ----------------------------
                                                   879.0         884.0
----------------------------------------------------------------------
MM222A             5502770 N
including           502148 E       -72/360         867.2         871.3
                                          ----------------------------
                                                   868.3         871.3
----------------------------------------------------------------------
MM203D             5502700 N
including           501700 E       -65/360        1005.0        1009.1
                                          ----------------------------
                                                  1007.1        1009.1
----------------------------------------------------------------------
MM212              5502676 N
                    501599 E       -70/360        1096.9        1104.3
----------------------------------------------------------------------
MM221              5502900 N
including           502050 E       -70/360         853.0         859.0
                                          ----------------------------
                                                   854.7         857.7
----------------------------------------------------------------------
MM221E             5502900 N
                    502050 E       -70/360         679.0         680.2
----------------------------------------------------------------------
MM225              5502875 N
                    501846 E       -65/360         657.5         660.6
----------------------------------------------------------------------
(i) True widths are estimated at approximately 60-70% of intersection
 widths

----------------------------------------------------------------------
                         UTM
                 Coordinates   Dip/Azimuth
Hole-ID                  (m)     (degrees)      From (m)        To (m)
----------------------------------------------------------------------
MM189A             5502941 N
                    501900 E       -80/360         779.5         785.5
----------------------------------------------------------------------
MM192B             5502957 N
including           502200 E       -75/360         699.5         714.0
                                          ----------------------------
                                                   748.0         749.0
----------------------------------------------------------------------
MM192D             5502957 N
                    502200 E       -75/360         712.0         717.5
----------------------------------------------------------------------
MM222              5502770 N
                    502148 E       -72/360         797.0         808.5
----------------------------------------------------------------------
MM209              5502723 N
                    501806 E       -70/360         869.0         873.5
----------------------------------------------------------------------
MM209A             5502723 N
including           501806 E       -70/360         836.5         851.5
                                          ----------------------------
                                                   845.0         851.5
----------------------------------------------------------------------
MM209C             5502723 N
                    501806 E       -70/360         847.0         851.0
--------------                            ----------------------------
including                                          849.0         851.0
----------------------------------------------------------------------
MM221               5502900N
including            502050E       -70/360         676.9         685.1
                                          ----------------------------
                                                   676.9           680
----------------------------------------------------------------------
HR053              5502370 N
                    504950 E       -55/360         149.9         152.0
----------------------------------------------------------------------
HR054              5502320 N
including           504950 E       -55/360         275.0         285.0
                                          ----------------------------
                                                   276.0         278.0
----------------------------------------------------------------------
HR055              5502270 N
                    504950 E       -55/360       Assays pending
----------------------------------------------------------------------
HR056              5502270 N
                    504950 E       -55/360         340.1         346.7
----------------------------------------------------------------------
HR053              5502370 N
                    504950 E       -55/360         416.4         420.3
----------------------------------------------------------------------
HR054              5502320 N
                    504950 E       -55/360         495.3         498.0
----------------------------------------------------------------------
HR056              5502270 N
                    504950 E       -55/360       Assays pending
----------------------------------------------------------------------

The following tables provide highlights from 2011 drilling so far at
 Hardrock:

----------------------------------------------------------------------------
                                  Grade    Interval        Grade
Hole-ID        Interval(m)    (g/tonne)        (ft)     (oz/ton)        Zone
----------------------------------------------------------------------------
MM203B                 3.6         5.35        11.8         0.16           F
----------------------------------------------------------------------------
MM209C
including             15.5         2.88        50.8         0.08           F
              --------------------------------------------------------------
                       5.0         6.97        16.4         0.20           F
----------------------------------------------------------------------------
MM222A
including              4.1         4.13        13.4         0.12           F
              --------------------------------------------------------------
                       3.0         6.79         9.8         0.20           F
----------------------------------------------------------------------------
MM203D
including              4.1         4.46        13.4         0.13           K
              --------------------------------------------------
                       2.0         8.60         6.6         0.25
----------------------------------------------------------------------------
MM212                  7.4         3.16        24.3         0.09           K
----------------------------------------------------------------------------
MM221
including              6.0         4.99        19.7         0.15           K
              --------------------------------------------------
                       3.0         8.67         9.8         0.25
----------------------------------------------------------------------------
MM221E                 1.2        14.70         3.9         0.43           K
----------------------------------------------------------------------------
MM225                  3.1        10.16        10.2         0.30           K
----------------------------------------------------------------------------
(i) True widths are estimated at approximately 60-70% of intersection widths

----------------------------------------------------------------------------
                                  Grade    Interval        Grade
Hole-ID        Interval(m)    (g/tonne)        (ft)     (oz/ton)        Zone
----------------------------------------------------------------------------
MM189A                 6.0         7.15       19.68         0.21           P
----------------------------------------------------------------------------
MM192B
including             14.5         4.89        47.6         0.14           P
              --------------------------------------------------
                       1.0        93.80         3.3         2.74
----------------------------------------------------------------------------
MM192D                 5.5         4.23       18.04         0.12           P
----------------------------------------------------------------------------
MM222                 11.5         4.36       37.72         0.13           P
----------------------------------------------------------------------------
MM209                  4.5         6.90        14.8         0.20          SP
----------------------------------------------------------------------------
MM209A
including             15.0         6.02        49.2         0.18          SP
              --------------------------------------------------------------
                       6.5        10.91        21.3         0.32          SP
----------------------------------------------------------------------------
MM209C
                       4.0         6.17        13.1         0.18          SP
----------------------------------------------------------------------------
including              2.0        10.30         6.6         0.30          SP
----------------------------------------------------------------------------
MM221
including              8.2        11.25       26.90         0.33          SP
              --------------------------------------------------------------
                       3.1        18.80       10.17         0.55          SP
----------------------------------------------------------------------------
HR053                  2.1        37.49         6.9         1.09         TNS
----------------------------------------------------------------------------
HR054
including             10.0        10.89        32.8         0.32         TNS
              --------------------------------------------------------------
                       2.0        45.40         6.6         1.33         TNS
----------------------------------------------------------------------------
HR055                           Assays pending                           TNS
----------------------------------------------------------------------------
HR056                  6.6         6.43        21.6         0.19         TNS
----------------------------------------------------------------------------
HR053                  3.9         4.08        12.8         0.12         TN1
----------------------------------------------------------------------------
HR054                  2.7         5.53         8.9         0.16         TN1
----------------------------------------------------------------------------
HR056                           Assays pending                           TN1
----------------------------------------------------------------------------
(i) True widths are estimated at approximately 50-70% of intersection widths

Stephen McGibbon, P. Geo., is the Qualified Person for the information contained in this press release and is a Qualified Person within the meaning of National Instrument 43-101. Assay results are from core samples sent to Activation Laboratories, an accredited mineral analysis laboratory in Ancaster, Ontario, or to Accurassay Laboratories, an accredited mineral analysis laboratory in Thunder Bay, Ontario, for preparation and analysis utilizing both fire assay and screen metallic methods.

Hardrock Deposit

The Hardrock Project is located approximately 4 kilometres south of the town of Geraldton, Ontario and is host to several past-producing mines which collectively produced more than 3 million ounces of gold from depths primarily within 600 metres of surface between 1938 and 1968. Underground resources are located proximal to and below the historic mine workings. New discoveries including the High-Grade North Zone and the F2 East Zone will be the focus of the planned underground drill program. The current Mineral Resource estimate uses 11 identified mineralized domains to develop a combination potential open pit and underground mineral resource. The Hardrock Project benefits from development advantages with the Trans-Canada Highway, Trans-Canada Pipeline, and major power lines running through, or in close proximity to, the Project site. Significant services and a skilled labour pool exist with several communities located within 30 kilometres. Goldstone holds a 30% carried interest in the Hardrock Project

About Goldstone

Goldstone Resources Inc. is a gold exploration and development company operating in the historically significant Geraldton-Beardmore camp of Northwestern Ontario. On June 21, 2011, Goldstone and Premier Gold jointly announced that they have entered into a definitive agreement whereby Premier will acquire, by way of a plan of arrangement, all of the outstanding common shares of Goldstone.

Goldstone is focusing on gold exploration and deposit delineation at its Key Lake, Brookbank, Northern Empire and Leitch-Sand River gold properties, and as a partner in the Hardrock Project joint venture with Premier Gold. Goldstone's 100%-owned NI 43-101 compliant resources in the Beardmore area. In April 2011, Premier announced an updated NI 43-101resource estimate for the Hardrock Project in the Geraldton area of which Goldstone has a 30% interest. The camp is host to several mines which historically produced more than 4.1 million ounces of gold from high grade ore-before being shut down primarily as a result of a $35 gold price-and to Goldstone's fully permitted, expandable 200-TPD Northern Empire mill.

Further information is available on the Company's website at www.goldstoneresourcesinc.com and on SEDAR under the Company's profile at www.sedar.com.

Forward-Looking Statements

This news release may contain forward-looking information under applicable securities laws concerning Goldstone's business, operations, financial performance, condition and prospects, as well as management's objectives, strategies, beliefs and intentions. Forward looking information is frequently identified by such words as "may", "will", "plan", "expect", "anticipate", "intend" and similar words referring to future events and results. This forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those implied by the forward-looking information. Factors that may cause actual results to vary materially include, but are not limited to, inaccurate assumptions concerning the exploration for and development of mineral deposits, delay or inability to raise additional financing on satisfactory terms, unanticipated operational or technical difficulties, changes in laws or regulations, the risks of obtaining necessary licenses and permits, changes in general economic conditions and changes in conditions in the financial markets. Readers are cautioned not to place undue reliance on this forward-looking information as actual results may differ materially from those expressed or implied in the forward looking information. Goldstone does not assume the obligation to revise or update this forward-looking information after the date of this release or to revise such information to reflect the occurrence of future unanticipated events, except as may be required under applicable securities laws.

Neither Toronto Stock Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

Contacts: Goldstone Resources Inc. Philip Cunningham Chairman and Interim CEO (416) 860-1636 www.goldstoneresourcesinc.com

1 Year Gold Springs Resource Chart

1 Year Gold Springs Resource Chart

1 Month Gold Springs Resource Chart

1 Month Gold Springs Resource Chart

Your Recent History

Delayed Upgrade Clock