![](/cdn/assets/images/search/clock.png)
We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Sable Offshore Corp | NYSE:SOC | NYSE | Common Stock |
Price Change | % Change | Share Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|
0.17 | 1.04% | 16.57 | 16.625 | 16.17 | 16.40 | 199,055 | 21:00:03 |
DOW JONES NEWSWIRES
The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
ConocoPhillips' (COP) returned the New Jersey refinery FCCU to service on Jan. 29, traders doing business in the region said on Jan. 30. The unit was taken off-line on Jan. 26 for repairs. The company doesn't comment on day-to-day refining operations.
ConocoPhillips on Jan. 27 said maintenance work is under way at it's Los Angeles-area refiner in Carson, Calif. The plant is operated in conjunction with the Wilmington refinery, which is five miles away.
CVR Energy Inc. (CVI) on Jan. 26 reported emissions in connection with maintenance under way to repair damaged equipment at unspecified process units shut since Jan. 12 at its oil refinery in Wynnewood, Okla. A previous filing to environmental regulators said a 70,000-b/d crude unit was shut on Jan. 12 for what was expected to be three to four days of maintenance. The company doesn't comment on day-to-day operations.
ConocoPhillips (COP) on Jan. 26 said talk and reports of a 50% reduction of crude oil throughput at its Wood River Refinery in Roxana, Ill. are unfounded and that operations at the 306,000-barrel-a-day plant are routine.
Hess Corp. (HES) on Jan. 25 said it may take its Port Reading, N.J., fluid catalytic cracking facility off-line for three weeks of turnaround maintenance. The decision to undergo repairs will be made after a technical analysis. The unit is operating, but catalyst loss has been somewhat higher than normal, a spokeswoman for the company said. The 70,000-barrel-a-day facility recently reported several flaring events to the National Response Center.
For more detailed information, search Dow Jones Newswires using
the code N/REF. Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA CARIBBEAN Valero Aruba 235.0 Crude throughput rates cut by an unspecified amount for the past several weeks due to economics co. said on Jan 9. EAST COAST Conoco Linden, NJ 238.0 FCCU restarted on Jan 29; shut Jan 29 Phillips unplanned on Jan 26, traders said. Sunoco Philadelphia 330.0 Hydrotreater shut Dec 15 for PA maintenance; restart timing not known. Traders say unit remains shuttered on Jan 10. GULF COAST Pasadena Pasadena TX 100.0 Coker unit shut on Dec 10 due to N/A Refining fire. One man injured. Fire con- tained; cause under investigation. MIDWEST Conoco/ Wood River 306.0 Jan 25 reports 0f 50% crude oil Cenovus IL processing rate cut unfounded, the Co. said on Jan 26. "Opera- tions routing.". Flaring/emissions event on Jan 22 reported to regulators. CVR Wynnewood OK 70.0 Emissions associated with work at crude unit, shut unplanned on Jan. 12, continue, the co. said in a filing to regulators on Jan 29. ROCKIES Sinclair Sinclair 74.0 Refinery at reduced rates fol- WY lowing fires at CDU on Sept. 3 and Sept. 4. Repairs underway. Plant continues to operate at re- duced rates, sources said Nov. 11. WEST COAST Exxon Torrance 155.0 Refinery returning to normal oper- Mobil CA ations on Jan 11 after two temporary external power outages shut some units and slowed others on Jan 9. PLANNED CANADA CARIBBEAN HOVENSA St. Croix 350.0 Refinery operations to cease by Mid- mid-Feb.; facility will be con- Feb. verted to a products storage terminal, the co. said on Jan 18. EAST COAST Conoco Trainer, PA 185.0 Crude processing halted; operations winding down, the company said on Sept. 30. The refinery will be shuttered in six months if not sold. Hess Port Reading 70.0 The FCCU facility may be shut Corp NJ for three weeks turnaround a co. executive said on Jan 25. The unit has been operating but is experiencing more catalyst loss than usual. Sunoco Philadelphia 335.0 Refineries up for sale on July Marcus Hook 190.0 Sept. 6; Marcus Hook shut 2012 Dec. 1 ahead of schedule due to poor refining econo- mics. Phila. to shut in July. GULF COAST BP Texas City 406.6 FCCU and Alkylation unit routine TX maintenance that began earlier in Jan continues, a person familiar with the refinery said on Jan 9. Restart estimate not available. Citgo Corpus 157.0 East Plant crude unit shut Jan Christi, TX 10 for turnaround maintenance. No other details provided. Conoco Belle Chasse 247.0 Refinery up for sale a Phillips LA Nov. 29 Bloomberg News report said. Conoco Westlake, LA 239.4 Planned maintenance currently Phillips under way at unspecified unit(s) the co. said on Jan 10; no other details provided. CVR Wynnewood 54.0 Maintenance turnaround for up 4Q Energy OK to 40 days starting in 3Q 2013. 2012 Holly Artesia, NM 100.0 Crude runs will be reduced by Early Frontier 50% during 30 days of major turn- 2012 maintenance in early 2012, the Co. said on Aug. 5. Motiva Port Arthur 285.0 Expansion project to increase 1Q TX throughput capacity by 325,000 2012 b/d, to 610,000-b/d, slowed. Completion now seen 1Q 2012, from 2010. Valero McKee TX 170.0 Vacuum unit turnaround planned for first half of 2012, company said. Expansion project announced March 2011 to increase crude oil throughput by 25,000 b/d to 195,000 b/d. Valero Meraux, LA 135.0 FCCU will be shuttered during alkylation unit turnaround main- tenance that began wk of Jan 2 the co. said on Jan 9. Valero Houston,TX 88.0 Seven weeks of FCCU maintnance end-March starting in Feb. 2012 the Co. said on Nov. 1, 2011. Valero Norco, LA 185.0 Ten weeks of work planned for mid-April the crude and coker units start- 2012 ing Feb. 2012, co said on Nov. 1, 2011. Valero Norco, LA 185.0 Hydrocracker project will pro- 2013 ceed and be completed in late 2013, the co. said on 7/27/10. Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4Q 2012. Valero Port Arthur 325.0 Hydrocracker project will pro- 2012 TX ceed and be completed in late 2012. MIDWEST CVR Coffeyville 115.7 Second phase of turnaround work Q1 KS planned for Feb. 2012; first 2012 phase concluded in Nov. 2011. CVR Wynnewood 54.0 30-40 days maintenance planned Q3 OK in 3rd Q 2013, the co. said on 2013 Nov. 3, 2011. Holly Tulsa, OK 125.0 The entire refinery will be shut Late Frontier while West Plant section under- 2012 goes major turnaround maintenance in late 2012, the Co. said on Aug. 5, 2011. Husky Lima, OH 160.0 15-days of maintenance planned at Energy at aromatics unit in the fall of 2012. Husky Toledo, OH 140.0 Two turnarounds planned in 4Q 4thQ Energy 2011; one for two weeks, one for 2011 25 days. The plant will run at 90% of capacity during work, the co. said on Nov. 3, 2011. Tesoro Mandan, ND 58.0 Total crude-oil processing capa- 2nd Q city to increase by 17% to 68,000 2012 b/d by 2nd quarter 2012. Valero Memphis, TN 180.0 Five weeks of maintenance on early-April crude unit starting in March. 2012 2012, co. said on Nov. 1, 2011. WEST COAST Alon Bakersfield 14.5 Refining operations halted for CA at least one month for econo- mic reasons, a local news re- port said on Jan 15. Conoco Carson, CA 139.0 Maintenance work under way at Wilmington Carson plant, the Co. said on Jan 27; no details were pro- vided. Tesoro West Coast N/A Q4 2011 maintenance at West Coast refineries delayed until 2012. Further details not pro vided. Valero Wilmington, 78.0 Four weeks of maintenance for Feb. 10 CA crude and coker units got under way on Jan 13. The entire plant will be off line during the work.
1 Year Sable Offshore Chart |
1 Month Sable Offshore Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions