![](/cdn/assets/images/search/clock.png)
We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Sterlite Ind.I. Adr/4 IR1 | NYSE:SLT | NYSE | Ordinary Share |
Price Change | % Change | Share Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 6.22 | 0.00 | 01:00:00 |
Sterlite Industries (India) Limited today announced its production results for the Second Quarter (Q2) and Half Year (H1) ended 30 September 2012.
Highlights
Zinc - India
Q2 Q1 H1 Particulars (in’000 tonnes, or as stated) FY2013 FY2012 % change YoY FY2013 FY2013 FY2012 % change YoY ZINC INDIA Mined metal content 190 210 (9%) 187 377 398 (5%) Refined Zinc - Total 163 185 (12%) 161 324 378 (14%) Refined Zinc - Integrated 153 185 (17%) 157 310 376 (17%) Refined Zinc - Custom 10 - - 4 14 2 - Refined Lead - Total 1 27 17 60% 31 58 33 75% Refined Lead - Integrated 24 17 40% 29 53 33 59% Refined Lead - Custom 3 - - 2 5 - - Silver - Total (in tonnes) 2 92 49 86% 82 174 96 81% Silver - Integrated (in tonnes) 80 49 63% 79 160 96 66% Silver – Custom (in tonnes) 12 - - 3 14 -Mined metal production was 190,000 tonnes in Q2 and 377,000 tonnes in H1, as compared with 210,000 tonnes and 398,000 tonnes in the corresponding prior periods. The Sindesar Khurd (SK) mine continued to ramp-up well with mined metal production up 39% at 45,000 tonnes in H1.
In line with the mined metal production, integrated production of refined zinc was 153,000 tonnes in Q2 and 310,000 tonnes in H1. Integrated production of refined lead was 24,000 tonnes in Q2, and 53,000 tonnes in H1, up 40% and 59% respectively, driven by the ramp-up of the new 100kt Dariba lead smelter.
In line with the mine plan and earlier guidance, mined metal production in FY2013 is expected to be slightly higher than the previous year, with production in H2 FY2013 more than making up for marginally lower production in H1 FY2013 as compared with the corresponding prior period.
Integrated production of silver was 80 tonnes in Q2 and 160 tonnes in H1, up 63% and 66% respectively, driven by the ramp-up of SK mine and the new 100kt Dariba lead smelter.
The Rampura Agucha underground mine and Kayar mine projects are progressing well to deliver commercial production in FY2014. The Kayar mine produced developmental ore in Q2.
Zinc International
Q2 Q1 H1 Particulars (in’000 tonnes, or as stated) FY2013 FY2012 % change YoY FY2013 FY2013 FY2012 % change YoY ZINC INTERNATIONAL 114 114 - 106 220 233 (5%) Zinc -refined 37 37 - 36 73 76 (4%) Mined metal content- BMM and Lisheen 77 77 - 70 147 157 (6%)Total production of refined zinc and mined zinc-lead metal in concentrate (MIC) was 114,000 tonnes in Q2, in line with the corresponding prior period, and 5% lower at 220,000 in H1 in line with the current year’s mine plan and on account of lower grades, as earlier guided.
Copper - India and Australia
Q2 Q1 H1 Particulars (in’000 tonnes, or as stated) FY2013 FY2012 % change YoY FY2013 FY2013 FY2012 % change YoY COPPER- INDIA / AUSTRALIA Copper - Mined metal content 6 5 14% 7 13 11 13% Copper - Cathodes 87 87 - 88 175 161 9%Copper cathode production was 87,000 tonnes in Q2, in line with the corresponding prior period, and 9% higher at 175,000 tonnes in H1.
Mined metal production at Australia was 14% higher at 6,000 tonnes in Q2 and 13% higher at 13,000 tonnes in H1.
The first 80MW unit of the 160MW captive power plant at Tuticorin, which will predominantly provide power to the copper smelter, was synchronised during the quarter.
Aluminium
Q2 Q1 H1 Particulars(in’000 tonnes, or as stated)
FY2013 FY2012 % change YoY FY2013 FY2013 FY2012 % change YoY ALUMINIUM Balco 63 60 4% 60 123 121 1%The Balco Korba-II smelter continues to operate at its rated capacity.
Due to a delay in obtaining regulatory approvals, the first 300MW unit of the BALCO 1,200MW captive power plant is now expected to be synchronized in the current quarter. Thereafter, we plan to tap the first metal at the 325 ktpa Korba-III aluminium smelter in Q4 FY2013. For the 211mt coal block at BALCO, we are progressing well towards obtaining the second stage forest clearance, and thereafter we intend to commence mining this year.
Power
Q2 Q1 H1 Particulars (in million units) FY2013 FY2012 % change YoY FY2013 FY2013 FY2012 % change YoY POWER Total Power Sales 2,474 1,748 42% 2,458 4,933 3,415 44% SEL 3 1,940 1,267 53% 1,938 3,879 2,404 61% Balco 270MW Power Sales 346 387 (10%) 338 684 811 (16%) HZL Wind Power 188 94 99% 182 370 200 85%Power sales were 2,474 million units in Q2 and 4,933 million units in H1, 42%and 44% higher than the corresponding prior periods. This significant increase was primarily due to higher power sales from three units of the Jharsuguda 2,400MW power plant, operating at availability of over 80% and plant load factor (PLF) of 50% in H1, with the fourth unit generating under trial run. PLF of the Jharsuguda 2,400MW power plant was constrained due to evacuation limitations. We continue to work towards debottlenecking of our evacuation capacity, and target to enhance it by an additional 1,000MW transmission by Q4 FY2013.
Power sales were augmented by higher sales at HZL wind power, which was expanded by 150MW to 274MW last year.
Power sales at Balco 270 MW were 10% lower at 346 million units in Q2 and 16% lower at 684 million units in H1 due to lower demand.
Work at the Talwandi Sabo power project is progressing well and the first unit is now expected to be synchronized in Q2 FY2014.
Production Summary (Unaudited)
(in ’000 tonnes, except as stated)
Q2 Q1 H1 Particulars FY2013 FY2012 % change YoY FY2013 FY2013 FY2012 % change YoY ZINC INDIA Mined metal content 190 210 (9%) 187 377 398 (5%) Refined Zinc - Total 163 185 (12%) 161 324 378 (14%) Refined Zinc - Integrated 153 185 (17%) 157 310 376 (17%) Refined Zinc - Custom 10 - - 4 14 2 - Refined Lead - Total 1 27 17 60% 31 58 33 75% Refined Lead - Integrated 24 17 40% 29 53 33 59% Refined Lead - Custom 3 - - 2 5 - - Silver - Total (in tonnes) 2 92 49 86% 82 174 96 81% Silver - Integrated (in tonnes) 80 49 63% 79 160 96 66% Silver – Custom (in tonnes) 12 - 3 14 - ZINC INTERNATIONAL 114 114 - 106 220 233 (5%) Zinc -refined 37 37 - 36 73 76 (4%) Mined metal content- BMM and Lisheen 77 77 - 70 147 157 (6%) COPPER- INDIA / AUSTRALIA Copper - Mined metal content 6 5 14% 7 13 11 13% Copper - Cathodes 87 87 0% 88 175 161 9% ALUMINIUM Balco 63 60 4% 60 123 121 1% POWER (in million units) Total Power Sales 2,474 1,748 42% 2,458 4,933 3,415 44% SEL 3 1,940 1,267 53% 1,938 3,879 2,404 61% Balco 270MW Power Sales 346 387 (10%) 338 684 811 (16%) HZL Wind Power 188 94 99% 182 370 200 85%1.
Includes captive consumption of 3,076 tonnes in H1 FY2013 vs. 2,739 tonnes in H1 FY 2012, and 1,435 tonnes in Q2 FY2013 vs. 1,348 tonnes in Q2 FY2012.
2.
Includes captive consumption of 16 tonnes in H1 FY2013 vs. 14 tonnes in H1 FY 2012 and 8 tonnes in Q2 FY2013 vs. 7 tonnes in Q2 FY2012.
3.
Includes production under trial run of 339 million units in H1 FY2013 vs. 288 million units in H1 FY2012, and 138 million units in Q2 FY2013 vs. 149 million units in Q2 FY2013.
About Sterlite Industries
Sterlite Industries (India) Limited is India’s largest diversified metals and mining company. The company produces aluminium, copper, zinc, lead, silver, and commercial energy and has operations in India, Australia, Namibia, South Africa and Ireland. The company has a strong organic growth pipeline of projects. Sterlite Industries is listed on the Bombay Stock Exchange and National Stock Exchange in India and the New York Stock Exchange in the United States. For more information, please visit www.sterlite-industries.com
Disclaimer
This press release contains “forward-looking statements” – that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as “expects,” “anticipates,” “intends,” “plans,” “believes,” “seeks,” “should” or “will.” Forward–looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets including the London Metal Exchange, fluctuations in interest and or exchange rates and metal prices; from future integration of acquired businesses; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements. We do not undertake to update our forward-looking statements.
1 Year Silverline Tech 1:10 Chart |
1 Month Silverline Tech 1:10 Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions