ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

HTE Harvest Energy Tr

9.41
0.00 (0.00%)
Last Updated: 00:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type
Harvest Energy Tr NYSE:HTE NYSE Ordinary Share
  Price Change % Change Share Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 9.41 0.00 00:00:00

US Refinery Status: Marathon's Louisiana Plant At Full Rates -2

26/03/2010 2:37pm

Dow Jones News


Harvest Energy (NYSE:HTE)
Historical Stock Chart


From Nov 2019 to Nov 2024

Click Here for more Harvest Energy Charts.
BP      Texas City     455.8  Ultraformer No. 4 restarted       March 23 
        TX                    March 23 after shutting down 
                              for repairs on March 19. Emis- 
                              sions are expected to last 
                              until March 27. 
 
Chevron  Pascagoula  330.0    Pre-commercial heavy oil          2010 
         Miss.                conversion project delayed 
                              from 2008 to 2010 due to 
                              economic factors. 
 
                              Work is progressing on the 
                              continuous catalytic reformer, 
                              expected to be completed by 
                              mid-2010, Co. said Feb. 25. 
                              Co. is planning to put a premium 
                              base-oil facility at plant. 
 
Flint    Corpus       288.1   Seven days of work at flare       March 28 
Hills    Christ, TX           gas recovery unit starts 
                              March 21. The start and end 
                              dates are estimates only. 
 
Flint    Corpus               $250 mln project for new Spring   2010 
Hills    Christi, TX          diesel desulfurization, 
                              sulfur recovery unit to begin 
                              in Fall 2008. Construction 
                              to last 18 months. 
 
Marathon Garyville    436.0   Plant operating at newly ex-      n/a 
         LA                   panded capacity and may ex- 
                              ceed it, the co. said on March 
                              25. 
 
Motiva   Convent, LA   235.0  Planned turnaround maintenance    Early 
                              began Jan 28 at several un-       April 
                              specified process units. Re- 
                              start seen in early April. 
 
Motiva   Port Arthur   285.0  Expansion project to increase     1Q 
         TX                   throughput capacity by 325,000    2012 
                              b/d, to 610,000-b/d, slowed. 
                              Completion now seen 1Q 
                              2012, from 2010. 
 
Valero   Corpus       340.0   Plant shut; West Plant 
         Christ, TX           50,000-b/d FCCU at reduced 
                              rates since mid-Dec for 
                              economic reasons. 
 
                              36,000-b/d HCU in West Plant      March 
                              restarted, Co. said March 16, 
                              after about 18 days of work 
                              delayed from Feb. 
 
Valero   Norco, LA    250.0   Upgrade project to build 2012 
                              a new diesel hydrotreater 
                              unit moved from 2010 to 
                              4Q 2012. 
 
Valero   Port Arthur  325.0   Hydrocracker turnaround lasting 
                              38 days has begun, Co. said 
                              March 15. 
 
                              77,000-b/d FCCU at reduced        n/a 
                              rates since mid-Dec for 
                              economic reasons. 
 
Valero   Sunray, TX   170.0   55,000-b/d FCCU at reduced        n/a 
                              rates since mid-Dec for 
                              economic reasons. 
 
Valero   Texas City   245.0   Repaired an exchanger leak 
         TX                   found in the alkylation unit 
                              located at Complex 2, Co. 
                              said March 15. 
 
 
MIDWEST 
 
BP       Toledo, OH   155.0   $400 million upgrade              2012 
                              to start 2010. 
 
Valero   Memphis, TN  195.0   Plant will completely restart     End 
                              by end-April after over-haul of   April 
                              FCCU, alkylation unit. The plant 
                              has been off-line since March 14. 
 
Marathon Catlettsburg 226.0   Turnaround maintenance at un-     n/a 
         KY                   specified units starts March 
                              10. No restart estimate. 
 
 
ROCKY MOUNTAIN 
 
Western  Bloomfield,   16.8   Co. announced plans Nov. 9 
         NM                   to idle plant and shift 
                              production to Gallup plant. 
 
Suncor   Commerce      93.0   No. 1 Crude unit will shut for    Mar 22 
         City, CO             planned maintenance on Mar 6; 
                              restart Mar 22. 
                              Cryo Unit will shut for planned   Apr 4 
                              maintnenance Mar 20; restart 
                              April 4. 
                              Planned work at reformer unit     Fall 
                              deferred to Fall 2010 from Feb    2010 
                              28 start date. 
 
Tesoro   Salt Lake     58.0   Major turnaround work will 
         City, Utah           begin in 1Q 2010, the Co. said 
                              on Feb 3. 
 
Tesoro   Mandan, N.D.  60.0   Planned turnaround will           2Q 
                              begin 2Q 2010, the Co. said 
                              on Feb 3. 
 
WEST COAST 
 
Exxon    Torrance, CA 150.0   FCCU, alkylation unit shut        Apr 10 
                              March 20-21 as part of turn- 
                              around maintenance that be- 
                              gan March 1 at several units. 
                              The work is expected to last 
                              for 40 days, trade sources said 
                              on Feb. 11. 
 
Tesoro   Golden Eagle 166.0   Turnaround work began in early    n/a 
         Martinez,            Dec at FCCU and alkylation 
         CA                   unit, the Co. said on Feb 3. 
                              Restart timing unclear. 
                              Other major turnaround mainte-    2011 
                              nance deferred to 2011 from 
                              late 2009, the Co. said Feb 3. 
 
Tesoro   Oahu, HI      94.0   Planned turnaround work will 
         Kapolei              begin 3Q, 2010, the Co. said 
                              on Feb 3. 
 
 

Order free Annual Report for BP plc

Visit http://djnewswires.ar.wilink.com/?link=BP or call 1-888-301-0513

Order free Annual Report for ConocoPhillips

Visit http://djnewswires.ar.wilink.com/?link=COP or call 1-888-301-0513

Order free Annual Report for Hess Corporation

Visit http://djnewswires.ar.wilink.com/?link=HES or call 1-888-301-0513

Order free Annual Report for Holly Corp.

Visit http://djnewswires.ar.wilink.com/?link=HOC or call 1-888-301-0513

Order free Annual Report for Marathon Oil Corporation

Visit http://djnewswires.ar.wilink.com/?link=MRO or call 1-888-301-0513

Order free Annual Report for Suncor Energy Inc.

Visit http://djnewswires.ar.wilink.com/?link=SU or call 1-888-301-0513

Order free Annual Report for Tesoro Corporation

Visit http://djnewswires.ar.wilink.com/?link=TSO or call 1-888-301-0513

Order free Annual Report for Exxon Mobil Corporation

Visit http://djnewswires.ar.wilink.com/?link=XOM or call 1-888-301-0513

 
 

1 Year Harvest Energy Chart

1 Year Harvest Energy Chart

1 Month Harvest Energy Chart

1 Month Harvest Energy Chart