The following table lists planned and unplanned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
Exxon Mobil Corp. (XOM) shut down the crude-distillation unit at its refinery in Torrance, Calif., for unplanned maintenance, the company said June 20. The company didn't say how long maintenance was expected to last.
Motiva Enterprises LLC shut down a production unit at its refinery in Port Arthur, Texas, on June 14 after discovering a possible leak, according to a government filing.
Canadian Oil Sands Ltd. (COS.T) said June 10 that Syncrude Canada Ltd. advanced 50 days of planned turnaround maintenance on Coker 8-1 at the northern Alberta oil sands project. The turnaround was scheduled to occur in the second half of 2013 but was advanced because of reduced throughput.
Several units at Marathon Petroleum Corp.'s (MPC) 80,000-barrel-a-day refinery in Texas City, Texas, remained off line June 10 following a leak at the refinery's FCCU, the company said.
Flint Hills Resources on June 7 said a coker unit wet-gas compressor at its Corpus Christi, Texas, refinery's west plant was restarted after tripping offline, according to a report to environmental regulators. Flaring occurred for about 26 minutes, and the coker unit was brought down "to a safe state." It wasn't clear whether the coker unit had been returned to normal operations.
Alon USA Energy, Inc. (ALJ) on June 7 said a reformer unit at its refinery in Krotz Springs, La., was restarted after shutting down for unplanned repairs late in April.
Phillips 66 (PSX) on June 6 said planned work is currently under way at its Wood River Refinery in Roxana, Ill. The company didn't elaborate on the scope of the maintenance, when it began or how long it would continue.
Motiva Enterprises LLC on June 6 said planned maintenance on a delayed coker unit's gas-recovery system at its Port Arthur, Texas, refinery under way since June 3 resulted in flaring. A filing to environmental regulators made available on June 5 didn't specify whether the work was planned or unplanned. It did say operations were slowed to stabilize the unit and to minimize flaring. The current status of operations isn't clear.
CVR Refining LP said unplanned sulfur-recovery unit maintenance on June 5 at its Wynnewood, Okla., refinery resulted in flaring an emission of hydrogen sulfide, according to a filing to the U.S. National Response Center. The report didn't specify whether the work was impacting production at the 70,000-barrels-a-day refinery.
For more detailed information, search Dow Jones Newswires using the code N/REF.
Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA CARIBBEAN EAST COAST GULF COAST Alon Krotz 74.0 Reformer unit restarted on June 6 USA Springs, LA June 6 following unplanned shutdown late in April. Flint Corpus 300.0 Coker unit wet gas compressor June 7 Hills Christi, TX restarted after a brief shut- down on June 7. The coker unit rate was reduced and it wasn't clear if it had been returned to normal rate - TCEQ filing. Marathon Texas City 88.0 Total shutdown of refinery on TX June 7 when a leak developed on the FCCU. No injuries and no restart estimate provided in TCEQ filing. Phillips Sweeny, 247.0 Unit 35, an aromatics unit, shut 66 TX on May 29 due to a furnace pro- blem. MIDWEST CVR Wynnewood 77.0 Unplanned SRU maintenance on Refining OK June 5 results in emission of hydrogen sulfide and flaring. Impact to production not known. Holly El Dorado,KS 135.0 Problems in FCCU will result in May 25 Frontier Cheyenne, WY about 10 days of down time, the company said May 15. Phillips Roxana, 328.0 Process leak at hydrocracker unit 66 IL reported to state regulators on May 28. Status of operations un- clear. Sinclair Casper 75.0 Plantwide restart on June 6 June 6 WY following a power outage the day before. ROCKIES WEST COAST Exxon Torrance 150.0 Refinery normalizing operations Mobil CA on May 30 after a power interrup- tion the same day. (The plant is under going planned maintenance.) Tesoso Martinez, 166.0 Major process unit restarted on Corp. CA May 25. Not clear if the restart was associated with May 16 par- tial, brief power outage. Four major units affected then were in restart on May 17. PLANNED CANADA Husky Saskatchewan Major turnaround to take place Spring Energy in spring of 2013. Plant-wide 2013 shutdown is planned for in- spection and equipment repairs. Valero Quebec 100.0 Refinery begins restart on June June 3 Energy 3 following nine weeks of plant- wide turnaround maintenance, the co. said. It will be another several days for the refinery to reach planned rates. CARIBBEAN Valero Aruba Refinery will be converted to a terminal while the company con- tinues to seek a buyer. EAST COAST PBF Delaware 182.2 Work will be done on fluid coker 4Q Energy City, DE during the 4Q 2013. 2013 Paulsboro, 160.0 Crude unit maintenance in 4Q 4Q N.J. 2013. 2013 GULF COAST Motiva Norco, LA 233.5 Planed work under way at manu- facturing complex, company said on May 22. Units not specified. Motiva Port Arthur 600.0 Planned work at DCU1 gas re- TX covery system, under way since June 3 resulted in flaring. Valero Sunray, 170.0 Maintenance on soot blowers under Energy TX way, the company said on May 24. No material effect on production an- ticipated. MIDWEST BP Whiting, 336.0 Largest of three CDUs shut for Mid-2013 IN replacement, the company said on Oct. 31 as part of major expansion project. Completion on track for the second half of 2013. Citgo Lemont, 167.0 Compressor back in service on May IL 29 after completion of repairs under way since May 20. Exxon Joliet, 250.0 Planned maintenance completed June 9. All operating units were involved in the work that started April 17. Husky Lima, 160.0 45 days of major turnaround OH scheduled in 2014; 70% of units involved. Remaining 30% will undergo major turnaround in 2015, the company said Feb. 9. Northern St.Paul Pk 84.5 FCCU maintenance is planned in October Tier MN October for most of the month. Phillips Roxana 328.0 Planned work under way, the co. 66 IL said on June 6. No details pro- vided. ROCKIES CHS Laurel 55.0 Refinery undergoing major turn- Inc. MT around maintenance since earlier this spring. Completion date not known. WEST COAST Alon Bakersfield 94.0 Company purchasing asphalt to Calif. Long Beach supply 2013 asphalt season. Re- Complex Paramount fining complex operations still CA suspended. Seeking permit to build rail line to supply midcontinent crude, the company said on March 8. Exxon Torrance, 155.0 Several unspecified process units CA will be down for planned work for several weeks, the company said on May 2. Tesoro Martinez 166.0 H2SO4 Plant restarted on June 2. June 2 Corp. CA Unclear when the unit shutdown or whether it had an impact to pro- duction.
Subscribe to WSJ: http://online.wsj.com?mod=djnwires
1 Year Alon Chart |
1 Month Alon Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions