ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

PNRL Paringa Resources Ltd

1.44
0.00 (0.00%)
14 Jun 2024 - Closed
Delayed by 15 minutes
Name Symbol Market Type
Paringa Resources Ltd NASDAQ:PNRL NASDAQ Depository Receipt
  Price Change % Change Price Bid Price Offer Price High Price Low Price Open Price Traded Last Trade
  0.00 0.00% 1.44 2.00 0.50 0 01:00:00

Paringa Intercepts the Kentucky Number 9 Coal Seam With the Poplar Grove Slope

20/12/2018 12:10am

GlobeNewswire Inc.


Paringa Resources (NASDAQ:PNRL)
Historical Stock Chart


From Jun 2019 to Jun 2024

Click Here for more Paringa Resources Charts.

Paringa Resources Limited (“Paringa” or “the Company”) (ASX: PNL, NASDAQ: PNRL) is pleased to advise that the Company has intercepted the Western Kentucky Number 9 coal seam with the Poplar Grove primary transportation slope in Western Kentucky. The intersection of the coal seam by the Poplar Grove slope is a material milestone towards the production of coal.

Working gas in underground storage (bcf) and Henry Hub natural gas price ($/mbtu)
U.S. domestic power sector coal stockpiles (Mt) and quarterly thermal coal exports (Mf)

Intercepting the coal seam enables the Company to progress to the next phase of mining activities, including bottom development.  Bottom development involves the linking of the slope with both the intake and exhaust air shafts to establish the mine’s permanent ventilation system, as well as the construction of critical underground infrastructure such as the bottom sump, slope belt tailpiece and tramp iron magnet. Production of coal from bottom development will be utilised to commission the coal handling and preparation plant (“CHPP”) and to produce clean coal for sales to customers.

The CHPP is ready to receive first coal, with final exterior cladding and roofing to be completed shortly. All other materials handling infrastructure at the mine site is operational, enabling the transfer of run of mine material from the mine site to the CHPP. The Ainsworth dock on the Green River is also structurally complete and will be ready to receive the first coal processed by the CHPP.

Paringa has recently completed the last of seven job fairs (interview and hiring events) interviewing over 400 qualified applicants. Additionally, mining equipment is currently being received in anticipation for the transition from contract mining to owner-operated production in January.

Market update

Several factors are creating significant upward pressure on Illinois Coal Basin (“ILB”) coal prices, with evidence that local utilities are rapidly moving to secure 2019 and 2020 coal supply, and incentivising higher pricing and longer-term contracts than have been seen in the region for some time.

Strong market fundaments continue to prevail in the ILB, particularly regarding the price of natural gas, the main competing fuel source for power generation.

Working gas stocks in underground storage are currently significantly below the minimum 5-year range. In November, natural gas prices surged as much as 50% as cold weather in the U.S. raised concerns about supply shortages given the lack of available inventory, with Henry Hub pricing reaching a high of $4.93/mbtu.

Figures 1 & 2 are available at http://www.globenewswire.com/NewsRoom/AttachmentNg/cd25c708-7785-42ac-a9d4-4a361f864e4a

Additionally, high international coal pricing has led to a shift in coal sales from domestic consumption to export, from less than 18Mt of net exports from the U.S. in 2016 to potentially ~55Mt in 2018. 

With less coal available domestically in the U.S., coal stockpiles have continued to fall. U.S. Energy Information Administration data released for September 2018 saw a draw of ~3.5 million tons in power generation coal stockpiles, the largest draw in 28 years.

Figures 3 & 4 are available at http://www.globenewswire.com/NewsRoom/AttachmentNg/f19423b4-fb96-42e7-880c-b944441e13ef

For further information, contact:

Egan Antill                                                          CEO & Managing Director                                  eantill@paringaresources.com                            

Dominic AllenVice President, Financedallen@paringaresources.com 

Forward Looking Statements

This report may include forward-looking statements. These forward-looking statements are based on Paringa’s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Paringa, which could cause actual results to differ materially from such statements. Paringa makes no undertaking to subsequently update or revise the forward-looking statements made in this announcement, to reflect the circumstances or events after the date of that announcement.

1 Year Paringa Resources Chart

1 Year Paringa Resources Chart

1 Month Paringa Resources Chart

1 Month Paringa Resources Chart

Your Recent History

Delayed Upgrade Clock