The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
Most recently, Exxon Mobil Corp. (XOM) reported in a Thursday evening filing that a pump failure at its Baytown, Texas refinery resulted in a loss of cooling water supply resulting in the shut down of some units. Exxon said that production was not impacted and all customer needs were being met, according to the state environmental report.
A fire early Thursday at Lion Oil Company's El Dorado, Arkansas, oil refinery has reduced crude oil throughput to about 60% of capacity, company spokesman Wallace Moody said.
Repairs to electrical instrumentation and insulation damaged by the fire are underway; crude throughput is expected to return to normal rates by Saturday, he added.
The El Dorado refinery is able to process up to 70,000 barrels of crude oil a day and will be shutting down in September for 60-days of plant-wide turnaround maintenance, Moody said.
Total S.A. (TOT) restarted an unnamed unit at its Port Arthur, Texas Refinery, according to a report issued Monday.
Tesoro Corp. (TSO) said it expects its Kenai, Alaska and Martinez, Calif. refineries to be processing at normal capacity rates by the end of the week, a company spokesman said Monday.
On June 4, two units at the Alaska refinery were shut down because of a power failure. The refinery has a capacity to process up to 72,000 barrels a day.
In May, the hydrocracker and reformer at the Golden Eagle refinery in Martinez were shut down for planned maintenance. The refinery can process up to 166,000 barrels a day.
Exxon said a boiler unit at its Baytown, Texas, refinery hit a snag over the weekend but production has not been impacted.
On June 19, the refinery restarted one boiler unit only to have another trip off, a company spokeswoman said. The second boiler is being restarted, according to Neely Nelson. Both boilers are located at the refinery's fluid catalytic cracking unit #3.
On June 17, Exxon shut hydrocracking unit No. 1 at the Baytown refinery. It was not clear whether the outage was planned or unplanned, nor was the duration noted in the filing to Texas state regulators.
And a SCOT unit shut down for unknown reasons June 17 at Total Port Arthur. It is no clear when the unit will be restarted.
BP (BP) 16 shut a distillate desulfurization unit at its Whiting, Indiana, refinery due to a leak in an associated compressor. The outage is expected to be short-lived, and a restart was expected in 24-36 hours.
Valero Energy Corp. (VLO) said on June 15 that the restart of a crude unit, vacuum unit and coker at its Norco, La., refinery is a least three weeks away. The units were shut due to a minor fire on June 9.
Also on June 15, Valero said it would delay the plant-wide shutdown of its Aruba refinery to mid-July rather than early July. The process of shutting down the units will begin in early July.
For more detailed information, search Dow Jones Newswires using the code N/REF.
Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA EAST COAST CARIBBEAN GULF COAST Delek Tyler, TX 58.0 SCOT unit shut June 9 Jun 14 for approximately four days of unplanned work. Exxon Baytown, TX 567.0 Hydrocracking unit no. 1 n/a shut June 17. No restart timing available. Boiler hit snags, restarted June 23. Exxon shuts down some units n/a after loss of cooling water supply June 24. No production impact, co said. Total Port Arthur 232.0 SCOT unit shutdown June 17 n/a for unknown reason. Valero Norco, LA 185.0 Crude, vacuum, coker unit shut Jul 5 to restart in 3 weeks following (est.) June 9 minor fire. MIDWEST ROCKY MOUNTAINS BP Whiting, IN 410.0 Distillate desulfruization June 17 shut June 16 due to leak in compressor; restart seen in 24-36 hours. WEST COAST Alon Paramount, 53.0 Naphtha hydrotreater Early CA shut April 23 due to an July explosion will take 10 weeks to restart, the co. said on May 7. The refinery has been at re- duced rates since Apr. 23. PetroStar Valdez, AK 48.0 Refinery shut due to Dec. Jun/Jul 28 fire; expected to re- 2010 start in June/July 2010. Tesoro Kenai, AK 72.0 Power failure shuts hy- June drocracking and isomeri- 26-27 zation unit on June 4; restart seen some time next week. Will return to normal rates by June 26, 27 PLANNED CANADA CARIBBEAN Valero Aruba 235.0 The refinery will be shuttered Sep/Oct for economic reasons by mid- July. Restart will be re- evaluated in two to three months. EAST COAST Sunoco Philadelphia, 340.0 Reformer unit shut in Girard n/a PA Point section in early Oct. for economic reasons. Shutdown to last one to six months. GULF COAST Chevron Pascagoula, 330.0 Pre-commercial heavy oil 2010 Miss. conversion project delayed from 2008 to 2010 due to economic factors. Citgo Corpus 156.0 SCOT unit shut June 8 to Jun 14 Christi, Tx remove fouling and to quench tower and exchangers. Flint Corpus 288.1 West Plant Coking Unit in re- Hills Christi, TX start mode on June 3; unit shut June 1 for planned maintenance. $250 mil. project for new Spr diesel desulfurization, 2010 sulfur recovery unit to begin in Fall 2008. Construction to last 18 months. Marathon Garyville 245.0 Project to increase crude oil 4Q LA refining capacity by 180,000- 2009 b/d 85% complete, the Co. said on Apr. 30. New units expected start up in 4th-quarter, 2009. Motiva Port Arthur 285.0 Expansion project to increase 1st-Q TX throughput capacity by 325,000 2012 b/d, to 610,000-b/d, slowed. Completion now seen in 1st- quarter 2012, from 2010. Valero Corpus 340.0 Coker Unit shutdown for econo- n/a Christi, TX mic reasons and planned work; delayed to June 19 from June 12. The 20,000-b/d unit will remain off-line through July but could restart at any time if margins improve, the Co. said. 20,000-b/d FCCU in East n/a Plant shut; West Plant 50,000-b/d FCCU at reduced rates since mid-Dec. for economic reasons. Valero Norco, LA 250.0 Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4th-quarter 2012, the Co. said on Jan. 27. Valero Port Arthur 325.0 77,000-b/d FCCU at reduced n/a TX rates since mid-Dec. for economic reasons. Mainte- is planned at a hydrotreater unit, the company said on April 17; no details were given. Valero Norco, LA Turnaround at coker unit 1/Q delayed until the first 2010 quarter of 2010 from fourth quarter 2009, the Co. said on Apr. 28. Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a rates since mid-Dec. for economic reasons.
Valero Three Rivers 95.0 24,000-b/d FCCU at reduced n/a TX rates since mid-Dec. for economic reasons. Plant-wide 24-day turnaround Sep to begin in Sept., the Co. said on Apr. 28. Western El Paso, TX 122.0 Crude unit shut May 24 week Jun 3 for 10-days maintenance. WRB Borger, TX 152.0 Gas Oil Hydrodesulfurization Jun unit will be restart some 6-14 time between June 6 and 14. It is unclear when then unit was taken out of service. Planned maintenance at Unit Jul 12 29 FCCU electrostatic precipi- tators starts May 31. Work will conclude on July 12. MID-WEST BP Whiting 410.0 Restart pf FCCU shut in April 2nd- IN for Spring turnaround mainte- Half nance delayed to 2nd-half Jun June from mid-May. Frontier El Dorado 130.0 A coker turnaround and expan- Mid- KS sion project was delayed until Aug. Mid-July, and subsequently delayed until August. Valero Memphis, TN 195.0 FCCU upgrade originally slated 2012 for completion in 2009 has been shifted to 2012, the Co. said on Jan. 27. ROCKY MOUNTAINS Conoco Billings, 61.0 On Mar. 5 the Co. delayed for Jan. MT one year an expansion project 2010 which will increase capacity to 71,000 bbls. Construction of a new crude unit is now scheduled to begin in January 2010. Frontier Cheyenne 52.0 The refinery is operating at n/a WY reduced rates for economic reasons. WEST COAST Alon Paramount 55.0 Hydrocracker project post- CA poned indefinitely, the Co. said on Feb. 4 Chevron Richmond, 243.0 Hydrocracking Unit and re- Jun 27 CA former shut May 28 for 30- days planned maintenance. Exxon Torrance 155.0 Maintenance will begin in July July Mobil at one of two 26,000-b/d coker units, traders said on May 22. Flint North Pole 210.0 One of three processing n/a Hills AK units has been shut due to low jet fuel demand, the co. confirmed on Mar. 19. Shell Martinez 155.0 Crude Unit and Coker Unit Aug 15 CA to shut for planned main- tenance on July 10; re- start seen Aug. 15. Tesoro Golden Eagle 166.0 Hydrocracker/reformer Mid Martinez, CA shut for planned mainte- June nance May 9-10. Units to return to service by mid- June. Normal rates by June 26-27. Tesoro Wilmington, 97.0 39-days of turnaround main- CA tenance is planned for fourth-quarter 2009.
Order free Annual Report for BP plc
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call 1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call 1-888-301-0513
Order free Annual Report for Chevron Corporation
Visit http://djnewswires.ar.wilink.com/?link=CVX or call 1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call 1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call 1-888-301-0513
1 Year TotalEnergies Chart |
1 Month TotalEnergies Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions