The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswire's. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
Several units at Phillips 66's Los Angeles refinery have been brought back online and all units are seen back by the end of the week, the co. said on Sept. 20 Record heat and a power outage on Sept 15 forced a facility-wide shutdown.
Maintenance will continue for several weeks on a flexicoker at Exxon Mobil Corp.'s (XOM) 560,000-barrel-a-day refinery in Baytown, Texas, the company said on Sept. 20. The flexicoker was taken out of service on Sept. 11, due to a heat exchanger leak.
An equipment malfunction took place on Sept. 18 at the 146,000 barrel-a-day refinery owned and operated by WRB Refining in Borger, Texas, according to the Texas Commission on Environmental Quality.
An emissions event took place Sept. 18-19 at the 58,000 barrel-a-day refinery owned and operated by Delek Group LTD in Tyler, Texas, according to the Texas Commission on Environmental Quality. The emissions resulted from an electrical malfunction at a sulfur recovery unit.
A small delayed coker has been returned to service at BP's 337,000 barrel-a-day refinery in Whiting, Indiana after shutting down on July 27 due to a fire, a person familiar with operations at the plant said on Sept. 18.
Normal operations have resumed at the ExxonMobil/PDVSA joint-venture refinery in Chalmette, Louisiana, the company said on Sept 18. The refinery was shut in advance of Hurricane Isaac on Aug. 27. Efforts continue to restart the Baton Rouge refinery which was shut for the same reason on Aug. 27.
Phillips 66's Alliance refinery in Belle Chasse, Louisiana, is expected to be back in service by Sept. 22, the company said on Sept. 17. Plantwide operations were shut on Aug. 28, in advance of approaching hurricane Isaac.
Unspecified unit maintenance began Sept. 16 at Tesoro's 166,000 barrel-a-day Golden Eagle refinery in Martinez, Calif., marketers and traders doing business with the company said. Some traders said work is being performed at the plant's reformer unit.
Delek's refinery in Tyler, Texas, experienced excessive emissions on Sept. 15 and 16, according to the Texas Commission on Environmental Quality.
A heat exchanger hydrogen leak took place on Sept. 14, at Chevron's 245,000 barrel-a-day Richmond, Calif., refinery, traders and marketers doing business with the company said. The crude unit remains shut after a major fire on Aug. 6.
A wet gas compressor valve problem at Total's 174,000 barrel-a-day Port Arthur, Texas, caused a coking unit to malfunction which resulted in flaring on Sept. 14 and 15, according to the Texas Commission on Environmental Quality.
Fluid Catalytic cracking units at WRB Refining LLC's 146,000 barrel-a-day refinery in Borger, Texas, will be shut from Sept. 15 to Sept. 29, for maintenance, according to the Texas Commission on Environmental Quality.
For more detailed information, search Dow Jones Newswires using the code N/REF.
Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA CARIBBEAN EAST COAST MIDWEST Holly Tulsa, OK 125.0 Repair to diesel hydrotreater Frontier shut by a fire on Aug 2 will take 6-8 weeks, the co. said on Aug 8. GULF COAST Alon Big Spring 67.0 FCCU running at reduced rate TX on Sep 13 due to maintenance at associated wet gas compres- sor. Chal- Chalmette 192.5 Normal operations have re- mette LA sumed, the co. said on Sep 18. Refining The entire plant was shut Aug 27 ahead of Hurricane Isaac. Delek Tyler, TX 60.0 Excessive emissions due to elec- US trical malfunction at SRU on Sep 18-19 reported to regulators. Exxon Baton Rouge 503.0 Efforts continue to restart the Mobil LA the refinery, the co. said on Sep 18. The entire plant was shut ahead of Hurricane Isaac. Exxon Baytown, TX 560.0 Crude runs temporarily reduced Mobil on Sep 13 during fractionation tower restart. Flexicoker shut Sep 11 because of a heat exchanger lead will be down for several weeks of repairs the co. said on Sep 20. Motiva Port Arthur 600.0 Newly commissioned 325,000-b/d Early TX CDU was shut by a small fire 2013 over the Jun 9-10 weekend. Re- start seen in early 2013; lengthy repairs needed to correct cor- rosive issue at new equipment. Phillips Belle 247.0 Refinery expected to be back in Sep 22 66 Chasse, LA service by Sep 22, the co. said on Sep 17. The plant-wide shutdown occurred on Aug 28 ahead of Isaac. Pasadena Pasadena, TX 100.00 Flaring of off-spec product re- Refining ported to regulators on Aug. 10. Total Port Arthur 174.0 Flaring reported to regulators USA on Sep 14-15 due to wet gas compressor snag at coking unit. Valero Norco, LA 270.0 FCCU shut on Aug 10 is expected to return to service before the end of August, the Co. said. WRB Borger, TX 146.0 FCCUs shut Sep 15-29 for main- Sep 29 tenance a filing to regulators said. Equipment malfunction on Sep 19 reported to regulators. No further information available. MIDWEST BP Whiting, IN 337.0 Small coker unit has been in ser- Sep 18 vice for several weeks following an unplanned shutdown after a fire on Jul 27, a person familiar with operations said on Sep 18. Citgo Lemont, IL 167.0 FCCU shut Jul 28 for unplanned Aug 8 repair in Tulsa East Plant is in restart mode, an Aug 8 filing to regulators said. Refinery operations are being affected by Enbridge crude oil pipeline shutdown since July 27, the Co. said on July 30. ROCKIES WEST COAST BP Cherry Pt 226.0 Hydrotreater operations upset WA occurred on Sep 13. Chevron Richmond, 245.0 Heat exchanger hydrogen leak CA reported on Sep 15; impact on operations unclear. CDU No. 4 is shut after Aug 6 fire. Most other process units continue to operate, the co. said, although gasoline production was reduced by an unspecified amount, a Sep 12 DJ report said. No restart estimate. Exxon Torrance 155.0 Unplanned flaring reported to Mobil CA regulators on Sep 13. Unit(s) involved not specified. Phillips Wilmington/ 140.0 Some units have returned to ser- 66 Carson, CA vice and the entire plant will be fully operational by Sep 22, the co. said on Sep 20. Record heat and a power outage on Sep 15 forced plantwide shut- down, a report to regulators said. Restart expected by end of week. PLANNED CANADA Husky Saskatchewan Major turnaround to take place Spring Refinery in spring of 2013. Plant-wide 2013 shutdown for inspection and equipment repairs. CARIBBEAN Valero Aruba Refinery still up for sale, the Co. said on July 31, 2012. EAST COAST Monroe Trainer, PA 185.0 Some units will restart Sep 8-9; Energy full ops expected by month's end the co. said on Sep 6. Delta Airlines subsidiary buys Late refinery in April, plans turn- Summer around through summer. Startup 2012 planned in late summer 2012. Sunoco Philadelphia 335.0 Energy Partners buys Sunoco Inc.; 4Q PA deal to close 4Q 2012. 2012 Sunoco Marcus Hook 190.0 Marcus Hook shut Dec. 1 ahead of schedule due to poor refining economics. GULF COAST Valero Houston, TX 160.0 Eight weeks of maintenance set Oct/Nov to begin in Sept. 2012 at FCCU. 2012
Subscribe to WSJ: http://online.wsj.com?mod=djnwires
Valero McKee TX 170.0 Expansion project announced March 2011 to increase crude oil throughput by 25,000 b/d to 195,000 b/d. Valero Norco, LA 185.0 Hydrocracker project will pro- 2013 ceed and be completed in late 2013, the co. said on 7/27/10. Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4Q 2012. Valero Port Arthur 325.0 Hydrocracker project will pro- Late TX ceed and be completed in late 2012 2012. MIDWEST BP Whiting, IN 336.0 Largest of 3 CDUs will shut in 2nd- 4Q 2012 for expansion project, Half the Co. said July 31. Project 2013 completion set 2nd-half 3013. BP/Husky Toledo, OH 160.0 4 weeks of maintenance will Oct 11 begin at FCCU and coker com- pressors on Sep 13, a person familiar with the plant said on Aug 7. CVR Wynnewood 54.0 30-40 days maintenance planned Q3 OK in 3rd Q 2013, the co. said on 2013 Nov. 3, 2011. Holly Tulsa, OK 125.0 The entire refinery will be shut Late Frontier while West Plant section under- 2012 goes major turnaround maintenance in late 2012, the Co. said on Aug. 5, 2011. Holly El Dorado 139.0 Coker unit undergoing maintenance Frontire KS until further notice, traders said on Sep 14. No significant impact to production is expected. Husky Lima, OH 160.0 30-day maintenance will begin Sept Energy in Sept. the Co. said on July 24. 2012 Scope of work not disclosed. 15-day maintenance planned at 4Q diesel hydrotreater; 29-days at 2012 aromatics unit, set for 4Q 2012, the Co. said on Feb 9. New 20,000-b/d kerosene hydro- 1stH treater will start up in 1st 2013 half 2013, to co. said on Feb 9, 2012. 45-days of major turnaround scheduled in 2014; 70% of units involved. Remaining 30% will under go major turnaround in 2015, the co. said on Feb 9, 2012. Tesoro Mandan, ND 58.0 Total crude-oil processing capa- 2nd Q city to increase by 17% to 2012 68,000-b/d by 2nd quarter 2012. ROCKIES WEST COAST BP PLC Carson, CA 265.0 Planned flaring event will Aug 20 start on Aug. 4 through Aug. 20, the co. said in a filing on Aug. 2. The event isn't due to equip- ment breakdown. Tesoro Martinez, CA 166.0 Unspecified maintenance began Sep 16 a report to regulators said. Sources said the work is being done at the plant's re- former. Copyright (c) 2012 Dow Jones & Company, Inc.
Subscribe to WSJ: http://online.wsj.com?mod=djnwires
1 Year Ishares Diversified Alternatives Trust Chart |
1 Month Ishares Diversified Alternatives Trust Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions