We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Name | Symbol | Market | Type |
---|---|---|---|
Ishares Diversified Alternatives Trust | AMEX:ALT | AMEX | Fund |
Price Change | % Change | Price | High Price | Low Price | Open Price | Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0 | - |
The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswire's. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
ExxonMobil Corp. (XOM) on Oct. 3 said a fire at its Baytown, Texas, refinery was confined to a single process unit and that operations at the rest of the refinery weren't impacted. The fire was caused by a hole in a reactor, a environmental filing said. The unit involved hasn't been identified.
Exxon Mobil Corp. on Oct. 2 said operations are normalizing at its Torrance, Calif., refinery following an early morning power outage on Oct. 1. Flaring associated with the effort could continue through Oct. 9.
Hess Corp. (HES) on Oct. 3 said operations at it's Port Reading, New Jersey, distillate and gasoline production facility continued normally while emergency responders worked to clear vapors at the truck rack due to a leak in a truck's line.
Phillips 66 (PSX) on Oct. 2 said all process units affected by the Sept. 30 third-party provider power outage at its Sweeny, Texas, refinery had been brought back on-line.
Alon USA (ALJ) on Oct. 2 said normal operations had resumed at its Big Spring, Texas, refinery's FCCU after a wet gas compressor malfunction the day before.
Philadelphia Energy Solutions (PES CG SUN) shut a CO boiler and may have slightly reduced FCCU output, a person familiar with the plant said on Oct. 2. There is no estimate of when the work will end.
BP PLC (BP BP.LN) completed turnaround maintenance underway since last month at its Whiting, Indiana, refinery a person familiar with operations at the plant said on Oct. 2. The smallest of three crude units restarted on Sept. 30 and an isomerization unit was in restart mode. A hydrotreater unit was returned to service last week.
Motiva Enterprises LLC on Oct. 2 said an impact assessment after a brief fire the day before in a crude distillation unit at its Convent, La., refinery continues. No other process units were affected by the event.
Citgo Petroleum Corp on Oct. 1 said planned maintenance got underway at unspecified units in the East and West facilities at its Corpus Christi, Texas, refinery.
Pasadena Refining Systems Inc. on Oct. 1 said FCCU operations quickly returned to normal after "slight" upsets at its Pasadena, Texas, refinery FCCU on Sept. 28 and 29.
CVR Energy (CVI) on Sept. 29 resumed turnaround maintenance at its Wynnewood, Okla. refinery after a boiler explosion on Sept. 28 fatally injured one worker and critically injured another. No process units or other areas of the facility were affected by the blast.
For more detailed information, search Dow Jones Newswires using the code N/REF.
Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA Irving Saint John 300.0 Normal operations resume Oil Canada on Sep 26 after an explo- sion at a small tank earlier in the day, the co. said. CARIBBEAN EAST COAST Hess Port Reading 70.0 Operations normal while vapors cleared due to truck's line leak at loading rack, the co. said Oct 3. Phila- Philadelphia 330.0 CO boiler shut for maintenance delphia PA may have slightly reduced FCCU Energy output, a person familiar with operations said on Oct 2. GULF COAST Alon Big Spring 70.0 FCCU resumed normal operations USA TX after a wet gas compressor mal- function the day before, the co. said on Oct. 2. The same unit ran at reduced rate Sep 13 due to maintenance at the compressor. Chevron Pascagoula, 330.0 Operations were back at normal MS after running at reduced rates since late August when Hurricane Isaac caused damage, the co. said on Sep. 27. Exxon Baytown, TX 560.0 Oct 3 fire confined to one unit Mobil was caused by a hole in a reactor. No impact on remaining operations, the co. said. Flexicoker shut Sep 11 because of a heat exchanger leak will be down for several weeks of repairs the co. said on Sep 20. Motiva Convent, LA 235.0 Impact assessment continues after brief fire at CDU on Oct 1. No other process units affected, the co. said. Pasadena Pasadena, TX 100.0 Co. on Oct. 1 said operations re- Refining turned to normal soon after slight upsets on Sep 28 and Sep 29. Phillips Sweeny, TX 247.0 Process units back on-line Oct. Oct 2 66 2 after early morning power outage on Sep 30, the co. said. MIDWEST Citgo Lemont, IL 167.0 Electrical problems at a gas com- pressor reported to regulators on Sep 20 results in flaring; impact to production unclear. Exxon Channahon 238.6 Coker unit rate cut on Sep 23 IL following a compressor shut- down. Impact to operations un- clear. Holly Tulsa, OK 125.0 Sep 24: No update on status of re- Frontier pair work to diesel hydrotreater shut by fire on Aug 2. On Aug 8 the co. said repairs would take 6-8 weeks. ROCKIES WEST COAST Chevron Richmond, 245.0 CDU No. 4 is shut after Aug 6 fire. Most other process units continue to operate, the co. said, although gasoline production was reduced by an unspecified amount, a Sep 12 DJ report said. No restart estimate. Exxon Torrance, 155.0 Operations normalizing the co. Mobil CA said on Oct 2, after third- party power outage on Oct 1 re- sulted in unit shutdowns and slow- downs. Flaring may continue through Oct 9 as the process con- tinues. PLANNED CANADA Husky Saskatchewan Major turnaround to take place Spring Refinery in spring of 2013. Plant-wide 2013 shutdown for inspection and equipment repairs. CARIBBEAN Valero Aruba Refinery will be converted to a terminal while the co. continues to seek a buyer, the co. said on Sep 4. EAST COAST Monroe Trainer, PA 185.0 Some units will restart Sep 8-9; Energy full ops expected by month's end the co. said on Sep 6. Sunoco Marcus Hook 190.0 Marcus Hook shut Dec. 1 2011 ahead of schedule due to poor refining economics. GULF COAST Citgo Corpus 165.0 Planned maintenance starts Oct. Christi, TX 1 at unspecified units in East and West Plant facilities, the co. said on Oct. 1. Phillips Borger, TX 146.0 FCCU 40 shut Sep 24 for just Oct 29 66 over one month of maintenance; & FCCU 29 will shut Oct 21 for Nov 20 one month, a TCEQ filing said. Valero Houston, TX 160.0 FCCU shut for eight weeks of Nov 20 turnaround maintenance, the co. said on Sept. 21 Valero McKee TX 170.0 Expansion project announced March 2011 to increase crude oil throughput by 25,000 b/d to 195,000 b/d. Valero Norco, LA 185.0 Hydrocracker project will pro- 2013 ceed and be completed in late 2013, the co. said on 7/27/10. Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4Q 2012. Valero Port Arthur 325.0 Hydrocracker project will pro- Late TX ceed and be completed in late 2012 2012. MIDWEST BP Whiting, IN 336.0 Maintenance underway since late Oct 2 Aug. completed. CDU and isomer- ization unit restarted Sep 30; Hydrotreater restarted Sep 27, a source said on Oct 2. Largest of 3 CDUs will shut in Late late in 4Q 2012 for expansion 4Q project, the co. said July 31. 2012
Subscribe to WSJ: http://online.wsj.com?mod=djnwires
Project completion set 2nd-half 2013. BP/Husky Toledo, OH 160.0 4 weeks of maintenance will Oct 11 begin at FCCU and coker com- pressors on Sep 13, a person familiar with the plant said. CVR Wynnewood 54.0 Turnaround work resumed Sep 30 Energy OK after Sep 29 boiler explosion. No other process units or area of the plant affected by the blast. 30-40 days maintenance in Q3 2012 OK announced on Nov. 3, 2011. Holly Tulsa, OK 125.0 The entire refinery will be shut Late Frontier while West Plant section under- 2012 goes major turnaround maintenance in late 2012, the Co. said on Aug. 5, 2011. Holly El Dorado 139.0 Coker unit undergoing maintenance Frontier KS until further notice, traders said on Sep 14. No significant impact to production is expected. Husky Lima, OH 160.0 30-day maintenance will begin Sept Energy in Sept. the Co. said on July 24. 2012 Scope of work not disclosed. 15-day maintenance planned at 4Q diesel hydrotreater; 29-days at 2012 aromatics unit, set for 4Q 2012, the Co. said on Feb 9, 2012. New 20,000-b/d kerosene hydro- 1stH treater will start up in 1st 2013 half 2013, to co. said on Feb 9, 2012. 45-days of major turnaround scheduled in 2014; 70% of units involved. Remaining 30% will under go major turnaround in 2015, the co. said on Feb 9, 2012. Phillips Roxana, IL 305.0 Unspecified unit shut for planned 66 maintenance on Sep 25, the co. said. No further details provided. ROCKIES WEST COAST Tesoro Martinez, CA 166.0 Reformer restart began Sep 23 after Sep 16 shutdown reports to regulators said. Copyright (c) 2012 Dow Jones & Company, Inc.
Subscribe to WSJ: http://online.wsj.com?mod=djnwires
1 Year Ishares Diversified Alternatives Trust Chart |
1 Month Ishares Diversified Alternatives Trust Chart |
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions