ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

UEN Urals EN.

35.00
0.00 (0.00%)
24 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Urals EN. LSE:UEN London Ordinary Share CY0107130912 ORD USD0.126 (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 35.00 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Urals Energy Public Company Limited South Dagi drilling update (8529R)

19/06/2018 10:38am

UK Regulatory


TIDMUEN

RNS Number : 8529R

Urals Energy Public Company Limited

19 June 2018

 
                             Dissemination of a Regulatory Announcement 
                              that contains inside information according 
                              to REGULATION (EU) No 596/2014 (MAR). 
 

19 June 2018

Urals Energy Public Company Limited

("Urals Energy", the "Company" or the "Group")

South Dagi drilling update

The Board of Urals Energy (AIM:UEN), the independent exploration and production company with operations in Russia, is pleased to provide an update on its drilling operations at the South Dagi licence area on Sakhalin Island.

South Dagi licence on Sakhalin Island.

The Company's initial South Dagi development programme consists of the drilling of four new wells (Well 1, Well 2, Well 3 and Well 5), which are being drilled using the rig purchased by the Company in 2017 from Jereh Group. The Company's target for the South Dagi development programme is to achieve aggregate production in excess of 1,000 bbls/day, which will help in offsetting the decline in production at Petrosak and thus sustain production at the Company's refinery on Sakhalin Island.

The Jereh rig has experienced a number of problems with its mobilisation and operational set up which, together with adverse weather conditions earlier this year, have delayed completion of the first new well at South Dagi (Well 1). The Board anticipates that Well 1 will now be completed by the end of July 2018.

However, in line with the Company's previous announcements, the Board has decided to start a work-over programme of existing wells at South Dagi using a smaller capacity workover rig. The Company has completed and tested a workover of an existing well located on the South Dagi licence area (Well 7). Well 7 flowed liquids to the surface which have been delivered to the Company's refinery for separation of oil and water. During well tests, the daily oil volumes achieved from Well 7 were approximately 225 bbls/day. A separator is to be set up in the licence area, so that oil/water separation can be carried out at the field. Well 7 was drilled to a depth of approximately 1,250 metres. Its perforation interval is 1,170 to 1,190 metres, with a pay zone thickness of eight metres. The well is formed from sand stone (of the Dagi formation type).

The smaller capacity workover rig has been moved to the second workover well (Well 4), which is likely to be a gas well, which will be used to provide power for operations.

As announced on 4 May 2018, in the summary of the assessment of the Company's Remaining Reserves and Resources Potential by Blackwatch Petroleum Services, the Proven Reserves (1P) of South Dagi have been estimated at 2.9 million bbls, with Proven and Probable Reserves (2P) estimated at 20.9 million bbls and Proven, Probable and Possible Reserves (3P) being estimated at 38.3 million bbls, of which the Company's share is 97.16%.

The Company will review the results of the initial South Dagi development programme and then make a decision on further development operations in the field.

First 2018 Shipment from Kolguev Island.

Tanker loading is scheduled for the first 10 days of July 2018. The Company expects to ship 20,000 tons, equivalent to 158,000 bbls, of special light crude.

Final results for the year ended 31 December 2017

The Company expects to publish its final results for the year ended 31 December 2017 before the end of this month.

Andrew Shrager, Chairman of Urals Energy, commented:

"Despite the delays with Well 1, the results of the first well workover on the South Dagi licence are encouraging, in terms of achieving a level of production that is consistent with our target for the initial development programme."

Mr Vasily Nikoluk, Urals Energy's Chief Geologist, a graduate of the Ivano Frankivsk University and the former head of the geology department at Gazpromneft, who meets the criteria of a qualified person under the AIM Guidance Note for Mining, Oil and Gas Companies, has reviewed and approved the technical information contained within this announcement.

- Ends -

For further information, please contact:

 
 Urals Energy Public Company 
  Limited 
 Andrew Shrager, Chairman          Tel: +7 495 795 
  Leonid Dyachenko, Chief                     0300 
  Executive Officer 
 Sergey Uzornikov, Chief       www.uralsenergy.com 
  Financial Officer 
 
 
 Allenby Capital Limited 
  Nominated Adviser and Broker 
 Nick Naylor / Alex Brearley            Tel: +44 (0) 20 
                                              3328 5656 
                                 www.allenbycapital.com 
 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

END

DRLFKCDNCBKKQAD

(END) Dow Jones Newswires

June 19, 2018 05:38 ET (09:38 GMT)

1 Year Urals Energy Chart

1 Year Urals Energy Chart

1 Month Urals Energy Chart

1 Month Urals Energy Chart

Your Recent History

Delayed Upgrade Clock