ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

THR Thor Energy Plc

1.20
0.00 (0.00%)
Last Updated: 08:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Thor Energy Plc LSE:THR London Ordinary Share GB00BRJ52319 ORD GBP0.001
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 1.20 1.10 1.30 1.20 1.20 1.20 121,601 08:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Misc Nonmtl Minrls, Ex Fuels 0 -520k -0.0019 -6.32 3.34M

Thor Mining PLC QUARTERLY REPORT JANUARY TO MARCH 2018 (4872M)

30/04/2018 7:02am

UK Regulatory


Thor Energy (LSE:THR)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Thor Energy Charts.

TIDMTHR

RNS Number : 4872M

Thor Mining PLC

30 April 2018

30 April 2018

THOR MINING PLC

("THOR" OR THE "COMPANY")

QUARTERLY REPORT JANUARY TO MARCH 2018

 
 Highlights                                                     Outlook for June Quarter 
                                                                2018 
-------------------------------------------------------------  ---------------------------------------------------------- 
 TUNGSTEN & MULTI COMMODITIES 
  Molyhil, NT Australia 
    *    Conditional acquisition of interest in Bonya project         *    Complete Bonya acquisition & schedule initial 
         adds multiple outcropping tungsten deposits adjacent              drilling program 
         Molyhil 
 
                                                                      *    Review of parameters for capital and operating 
    *    Upgraded Open Cut Ore Reserve adds to mine life and               expenses to prepare an upgraded Definitive 
         identifies subsequent underground mining potential.               Feasibility Study (DFS). 
 
 
    *    Continued strength in global tungsten and molybdenum 
         pricing. 
  Pilot Mountain, Nevada USA 
    *    Internal scoping study to determine high level               *    Evaluation of scoping study outcomes. 
         operating parameters. 
 
                                                                      *    Stage 2 of metallurgical testwork. 
  COPPER 
   Kapunda, SA Australia 
    *    Release of Inferred Mineral Resource Estimate showing        *    Leach testing on historical core samples. 
         119,000 tonnes contained copper considered amenable 
         to In Situ Recovery. 
                                                                      *    Preparation for field pump testing 
 
 

INVESTMENTS

USA Lithium to be acquired by ASX listed Hawkstone Mining Limited, valuing the Thor holding at >A$600,000.

CORPORATE & FINANCE

-- The Company completed a share placement to Metal Tiger PLC raising GBP300,000 before expenses.

-- Cash position remains robust with A$3.0million in funds held ensuring that forecast activities are fully financed into 2019.

Commenting, Mr Mick Billing, Executive Chairman of Thor Mining, said:

"A very productive period for the Company with substantial progress. All three of our core projects continue to make very good progress."

"In particular, the acquisition of the interest in the tungsten and copper deposits at Bonya has the potential to be a game changer for Molyhil with the expectation of consequent substantial mine life extension. We look forward to the first drill program at Bonya, scheduled for early in the September quarter"

"Following the upgraded Open Cut Ore Reserve for Molyhil, we have been progressing the Definitive Feasibility Study (DFS) and the outcomes of this are expected shortly."

"The scoping study at Pilot Mountain is nearing completion, and we expect to have some guidance from this during the June quarter."

"We will continue to provide investors with regular updates in respect of progress."

TUNGSTEN PROJECTS

Tungsten and Molybdenum Price Trends

At the date of this report, the price of tungsten, per mtu of APT (Ammonium Para Tungstate) was US$326.00/mtu, while the molybdenum price has held its strengthened position at around US$12.00/lb.

Industry discussion suggests that these stronger pricing levels for both commodities are likely to continue for some time, with molybdenum in particular forecast to have supply constraints for several years.

MOLYHIL TUNGSTEN PROJECT - NT (100% Thor)

In January 2015, Thor announced an updated feasibility study for its wholly-owned Molyhil tungsten project, demonstrating a project NPV of A$67million (approximately GBP39million).

A full background on the project is available on the Thor Mining website;

www.thormining.com/projects.

During the quarter (8 January 2018) Thor announced an upgraded Statement of Open Pit Ore Reserve.

This new ore reserve increases the open pit mine life by 1 year to 7 years, with increases in metal content of 10% for tungsten and 19% for molybdenum.

The study also identified portions of the Indicated and Inferred resource estimate, remaining outside the revised pit shell, which appear economic for mechanised underground mining techniques.

Table A:

Molyhil Open Cut Ore Reserve Statement (announced 8 January 2018)

 
 Classification       Reserve       WO(3)              Mo 
                   '000 Tonnes   Grade    Tonnes   Grade      Tonnes 
                                  %                 % 
----------------  ------------  --------  -------  --------  ------- 
    Probable          3,500         0.29   10,200      0.12   4,300 
    Total             3,500         0.29   10,200      0.12   4,300 
                                --------           -------- 
 
   --      Thor Mining PLC holds 100% equity interest in this reserve. 
   --      The Company is not aware of any changes which could affect this reserve statement. 

The review of operating and capital cost estimates to definitive feasibility (DFS) standard continues, along with some upgraded metallurgical balance reporting. The objective of this work is an upgraded DFS for the benefit of prospective partners and project financiers.

Bonya

During the quarter (28 March 2018) the Company also announced the conditional acquisition of an interest in a licence area containing 13 known outcropping tungsten deposits and one copper deposit close to Molyhil. This acquisition is now conditional only upon ministerial consent, following which an initial drilling program is scheduled.

http://www.thormining.com/-/thor/lib/images/maps/15-001-1A%20Bonya%20Exploration%20Targets.jpg

This drilling program, the first to test the tungsten deposits in more than 40 years, is planned to test several of these deposits with a number of shallow (less than 100metres) reverse circulation holes over each deposit drilled. While detailed costing is still in progress, the program cost is expected to be in the region of A$300,000.

PILOT MOUNTAIN TUNGSTEN PROJECT - NEVADA USA (100% Thor)

Thor's Pilot Mountain Project, acquired in 2014, is located approximately 200 kilometres south of the city of Reno and 20 kilometres east of the town of Mina, located on US Highway 95.

The Pilot Mountain Project is comprised of four tungsten deposits: Desert Scheelite, Gunmetal, Garnet and Good Hope. All of these deposits are in close proximity (three kilometres) to each other and have been subjected to small-scale mining activities at various times during the 20th century.

In December 2014, Thor outlined a proposed exploration and development plan with the objective of upgrading the knowledge and status of the mineralisation of these deposits where historical drilling outlined potentially economic mineralisation.

A full background on the project is available on the Thor Mining website;

www.thormining.com/projects.

The directors believe Pilot Mountain resource is substantial on a global scale, and has potential for significant growth, in particular from the discovery in the August 2017 drilling program of an additional parallel zone of scheelite mineralisation at the Desert Scheelite deposit.

http://www.thormining.com/-/thor/lib/images/miscellaneous/Desert%20Scheelite%20XSection.jpg

In addition, the directors believe that the Desert Scheelite resource, which outcrops at surface at the western end for more than 400 metres, has potential to develop into a long term open pit mining operation which would make it one of the higher grade open pit tungsten operations in the western world.

Table B: Pilot Mountain Resource Summary (Announced 22 May 2017)

 
                               Resource        WO(3)                Ag                 Cu 
   Classification               MT       Grade   Contained   Grade  Contained   Grade  Contained 
                                           %       metal      g/t     metal       %      metal 
                                                    (t)                (t)                (t) 
 -------------------  -----------------  -----  ----------  ------  ---------  ------  --------- 
       Garnet         Indicated            -         - 
                       Inferred    1.83  0.36      6,590 
-------------------  -----------  -----  -----  ----------  ------  ---------  ------  --------- 
                      Sub Total    1.83  0.36      6,590 
-------------------  -----------  -----  -----  ----------  ------  ---------  ------  --------- 
  Desert Scheelite    Indicated    8.41  0.27     22,700     21.3      179      0.14    11,800 
                       Inferred    1.49  0.23      3,430     9.07      13       0.17     2,500 
-------------------  -----------  -----  -----  ----------  ------  ---------  ------  --------- 
                      Sub Total    9.90  0.26     26,130     19.39     192      0.14    14,300 
-------------------  -----------  -----  -----  ----------  ------  ---------  ------  --------- 
      Summary         Indicated    8.41  0.27     22,690 
                       Inferred    3.32  0.30     10,020 
-------------------  -----------  -----  -----  ----------  ------  ---------  ------  --------- 
   Pilot Mountain 
        Total               11.73        0.28     32,720 
--------------------  -----------------  -----  ----------  ------  ---------  ------  --------- 
 
 

Note:

   --    100% owned by Thor Mining Plc 
   --    The Company is not aware of any changes which could affect this resource estimate 

An internal scoping study has been commissioned which is expected to provide a high level economic assessment, along with initial parameters associated with project site layout options for environmental and other permitting.

Additionally, while previous metallurgical testwork has demonstrated the production of saleable concentrates, further testwork is required to advance this to feasibility study standard, and this next stage of metallurgical testwork has recently been initiated.

KAPUNDA COPPER PROJECT - SA (Thor earning 45%)

On 1(st) August 2017 Thor announced an investment in a newly incorporated private Australian company, Environmental Copper Recovery SA Pty Ltd. ("ECR"), initially via convertible loan notes of up to A$1.8 million, which will be used to fund field test work and feasibility activities at Kapunda over the next 3 years. In turn ECR has entered into an agreement to earn, in two stages, up to 75% of the rights over metals which may be recovered via in-situ recovery ("ISR") contained in the Kapunda deposit from Australian listed company, Terramin Australia Limited ("Terramin" ASX: "TZN").

During the quarter (12 February 2018) Thor announced an Inferred Resource Estimate containing 119,000 tonnes of contained copper considered amenable to Insitu Recovery techniques. The grade of the resource, at 0.25%Cu, is considered typical for copper Insitu Recovery operations.

Table C: Kapunda Copper Resource Estimate (Announced 12 February 2018)

 
                           Resource              Copper 
                    ---------------------- 
                    Classification    MT    Grade   Contained 
                                             %       Cu (t) 
------------------  ---------------  -----  -----  ---------- 
 Copper Oxide        Inferred         30.3  0.24    73,000 
 Secondary copper 
  sulphide           Inferred         17.1  0.27    46,000 
------------------  ---------------  -----  -----  ---------- 
  Sub Total                           47.4  0.25    119,000 
 ----------------------------------  -----  -----  ---------- 
 

Notes:

-- ECR are earning a 75% interest in this resource, and Thor have investment rights for up to 60% of ECR.

   --        The Company is not aware of any changes which could affect this resource estimate. 

Other near-term activities at Kapunda include continued community liaison in respect of project activities, testwork on historical drill core to determine the optimum leaching agent (lixiviant) most suited to the Kapunda deposit and establishing appropriate parameters for future field trials.

SPRING HILL GOLD PROJECT - NT (ROYALTY ENTITLEMENT)

In February 2017 Thor completed the A$3.5 million sale of its Spring Hill Gold project(1). The sale transaction carries an ongoing residual royalty of:

-- A$6 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for up to A$1,500 per ounce; and

-- A$14 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for amounts over A$1,500 per ounce.

During the first half of the financial year, Thor received royalties from Spring Hill production totalling A$8,124. No royalties were received during the quarter.

(1)Refer ASX and AIM announcement of 29 February 2016

OTHER OPPORTUNITIES

USA Lithium

On 14 June 2017, the Company announced the acquisition of a 25% interest in US Lithium Pty Ltd ("USL"), along with an option to acquire the remaining 75% of USL, subject to satisfactory completion of project due diligence. Whilst Thor elected not to exercise the option, its continues to hold an interest in this company, subsequently renamed USA Lithium.

On 29th March 2018, the Company advised that USA Lithium had accepted a conditional offer for 100% of its issued capital from ASX listed Hawkstone Mining Limited (ASX: HWK). We have been advised that a general meeting of shareholders of Hawkstone is expected to be held in late May 2018 to approve this agreement.

If the acquisition proceeds, Thor will be issued 15,625,000 shares in Hawkstone. At the date of writing, Hawkstone shares traded at A$0.041, valuing the Thor interest at approximately A$600,000

Western Shaw

On 8th December 2017, the Company announced it had entered in to an option agreement to acquire a licence, in application, in the Pilbara region of Western Australia, considered prospective for lithium and conglomerate hosted gold deposits.

Following an initial site visit conducted during January, and assay of samples collected, the Company elected not to proceed with this project.

CORPORATE & FINANCE

During the quarter, the Company announced a strategic placing of GBP0.3 million at 3.0pence to Metal Tiger PLC, with Metal Tiger securing, for a 90 day period, first right of refusal to participate in any new joint venture, acquisition, or similar transaction undertaken by Thor. We look forward to working with Metal Tiger and reviewing our projects with them..

Competent Person's Report

The information in this report that relates to exploration results, and exploration targets, is based on information compiled by Richard Bradey, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

+Rule 5.5

Enquiries:

 
  Mick Billing         +61 (8) 7324 1935   Thor Mining PLC    Executive Chairman 
  Ray Ridge            +61 (8) 7324 1935   Thor Mining PLC    CFO/Company 
                                                               Secretary 
  Colin Aaronson/      +44 (0) 207 383     Grant Thornton     Nominated Adviser 
   Richard Tonthat      5100                UK LLP 
  Nick Emerson         +44 (0) 1483 413    SI Capital Ltd     Broker 
                        500 
  Tim Blythe/          +44 (0) 207 138     Blytheweigh        Financial PR 
   Camilla Horsfall     3222 
 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email, and on the Company's twitter page @ThorMining.

+Rule 5.5

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

 
 Name of entity 
-------------------------------------------------- 
 THOR MINING PLC 
 ABN             Quarter ended ("current quarter") 
------------    ---------------------------------- 
 121 117 673     31 March 2018 
                ---------------------------------- 
 
 
 Consolidated statement of cash                Current quarter   Year to date 
  flows                                             $A'000        (9 months) 
                                                                     $A'000 
 1.     Cash flows from operating 
         activities 
 1.1    Receipts (Spring Hill Royalty)                       -              8 
 1.2    Payments for 
        (a) exploration & evaluation                     (228)        (1,207) 
        (b) development                                      -              - 
        (c) production                                       -              - 
        (d) staff costs                                   (52)          (138) 
        (e) administration and corporate 
         costs                                           (368)        (1,032) 
 1.3    Dividends received (see note                         -              - 
         3) 
 1.4    Interest received                                    6              7 
        Interest and other costs of 
 1.5     finance paid                                      (2)            (2) 
 1.6    Income taxes paid                                    -              - 
 1.7    Research and development refunds                     -              - 
        Other (settlement of future 
 1.8     royalty)                                            -          (162) 
                                              ----------------  ------------- 
        Net cash from / (used in) 
 1.9     operating activities                            (644)        (2,526) 
-----  -------------------------------------  ----------------  ------------- 
 
 2.       Cash flows from investing 
           activities 
 2.1      Payments to acquire: 
          (a) property, plant and equipment                (5)           (17) 
          (b) tenements (see item 10)                        -              - 
          (c) investments                                    -          (378) 
          (d) other non-current assets                       -              - 
 2.2      Proceeds from the disposal 
           of: 
          (a) property, plant and equipment                  -              - 
                (b) tenements (see item 10)                  -              - 
                 commission paid on proceeds                 -              - 
          (c) investments                                    -              - 
          (d) other non-current assets                       -              - 
 2.3      Cash flows from loans to                           -              - 
           other entities 
 2.4      Dividends received (see note                       -              - 
           3) 
 2.5      Other (security bonds)                             -              - 
                                              ----------------  ------------- 
          Net cash from / (used in) 
 2.6       investing activities                            (5)          (395) 
-------  -----------------------------------  ----------------  ------------- 
 
 3.       Cash flows from financing 
           activities 
 3.1      Proceeds from issues of shares                 1,412          5,407 
 3.2      Proceeds from issue of convertible 
           notes 
 3.3      Proceeds from exercise of 
           share options 
          Transaction costs related 
           to issues of shares, convertible 
 3.4       notes or options                                (5)           (91) 
 3.5      Proceeds from borrowings                           -              - 
          Repayment of borrowings (finance 
 3.6       lease)                                          (4)           (11) 
 3.7      Transaction costs related 
           to loans and borrowings 
 3.8      Dividends paid 
          Other (Director Advances 
 3.9       repaid)                                           -           (50) 
                                              ----------------  ------------- 
          Net cash from / (used in) 
 3.10      financing activities                          1,403          5,255 
-------  -----------------------------------  ----------------  ------------- 
 
 4.       Net increase / (decrease) 
           in cash and cash equivalents 
           for the period 
          Cash and cash equivalents 
 4.1       at beginning of period                        2,278            685 
          Net cash from / (used in) 
           operating activities (item 
 4.2       1.9 above)                                    (644)        (2,526) 
          Net cash from / (used in) 
           investing activities (item 
    4.3    2.6 above)                                      (5)          (395) 
          Net cash from / (used in) 
           financing activities (item 
 4.4       3.10 above)                                   1,403          5,255 
          Effect of movement in exchange 
 4.5       rates on cash held                               42             55 
                                              ----------------  ------------- 
          Cash and cash equivalents 
 4.6       at end of period                              3,074          3,074 
-------  -----------------------------------  ----------------  ------------- 
 
 
 
 5.    Reconciliation of cash and           Current quarter   Previous quarter 
        cash equivalents                         $A'000            $A'000 
        at the end of the quarter 
        (as shown in the consolidated 
        statement of cash flows) to 
        the related items in the accounts 
 5.1   Bank balances                                  1,574              1,778 
 5.2   Call deposits 
 5.3   Bank overdrafts 
 5.4   Other (term deposit)                           1,500                500 
                                           ----------------  ----------------- 
       Cash and cash equivalents 
        at end of quarter (should 
 5.5    equal item 4.6 above)                         3,074              2,278 
----  -----------------------------------  ----------------  ----------------- 
 
 
 6.      Payments to directors of the entity and          Current quarter 
          their associates                                     $A'000 
         Aggregate amount of payments to these parties 
 6.1      included in item 1.2                                        168 
                                                         ---------------- 
 6.2     Aggregate amount of cash flow from loans                       - 
          to these parties included in item 2.3 
                                                         ---------------- 
 6.3     Include below any explanation necessary to understand 
          the transactions included in items 6.1 and 6.2 
------  ----------------------------------------------------------------- 
 The amount at Item 6.1 above represents payments to Directors 
  for Directors fees and other consulting services provided (Messrs 
  Billing and Thomas only). 
 
 
 7.    Payments to related entities of the entity      Current quarter 
        and their associates                                $A'000 
 7.1   Aggregate amount of payments to these parties                 - 
        included in item 1.2 
                                                      ---------------- 
 7.2   Aggregate amount of cash flow from loans                      - 
        to these parties included in item 2.3 
                                                      ---------------- 
 7.3   Include below any explanation necessary to understand 
        the transactions included in items 7.1 and 7.2 
----  ---------------------------------------------------------------- 
 
 
 
 8.    Financing facilities available                  Total facility         Amount drawn 
        Add notes as necessary for                   amount at quarter       at quarter end 
        an understanding of the position                    end                  $A'000 
                                                           $A'000 
 8.1   Loan facilities 
                                                   ---------------------  ------------------- 
 8.2   Credit standby arrangements 
                                                   ---------------------  ------------------- 
 8.3   Other (please specify) 
                                                   ---------------------  ------------------- 
 8.4   Include below a description of each facility above, including 
        the lender, interest rate and whether it is secured or 
        unsecured. If any additional facilities have been entered 
        into or are proposed to be entered into after quarter 
        end, include details of those facilities as well. 
----  --------------------------------------------------------------------------------------- 
 
 9.    Estimated cash outflows for next                               $A'000 
        quarter 
----  ---------------------------------------------  ---------------------------------------- 
 9.1   Exploration and evaluation                                                       (505) 
 9.2   Development                                                                          - 
 9.3   Production                                                                           - 
 9.4   Staff costs                                                                       (40) 
 9.5   Administration and corporate costs                                               (190) 
 9.6   Other                                                                                - 
                                                     ---------------------------------------- 
 9.7   Total estimated cash outflows                                                    (735) 
----  ---------------------------------------------  ---------------------------------------- 
 
 
 
 10.    Changes in tenements   Tenement      Nature of interest   Interest        Interest 
         (items 2.1(b)          reference                          at beginning    at end 
         and 2.2(b) above)      & location                         of quarter      of quarter 
 10.1   Interests in           N/A 
         mining tenements 
         and petroleum 
         tenements lapsed, 
         relinquished 
         or reduced 
-----  ---------------------  ------------  -------------------  --------------  ------------ 
 10.2   Interests in           N/A 
         mining tenements 
         and petroleum 
         tenements acquired 
         or increased 
-----  ---------------------  ------------  -------------------  --------------  ------------ 
 

Compliance statement

1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

   2          This statement gives a true and fair view of the matters disclosed. 

Sign here: ........ .................................................... Date: .......30 April 2018............

(Company secretary)

   Print name:           ..Ray Ridge......................................... 

Notes

1. The quarterly report provides a basis for informing the market how the entity's activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.

2. If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCSDSSISFASEDL

(END) Dow Jones Newswires

April 30, 2018 02:02 ET (06:02 GMT)

1 Year Thor Energy Chart

1 Year Thor Energy Chart

1 Month Thor Energy Chart

1 Month Thor Energy Chart

Your Recent History

Delayed Upgrade Clock