We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Pantheon Resources Plc | LSE:PANR | London | Ordinary Share | GB00B125SX82 | ORD 1P |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
-0.15 | -0.46% | 32.60 | 32.65 | 32.95 | 32.75 | 32.20 | 32.75 | 411,865 | 10:11:51 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Natural Gas Liquids | 804k | -1.45M | -0.0016 | -201.88 | 293.03M |
TIDMPANR
RNS Number : 2522T
Pantheon Resources PLC
11 October 2017
11 October 2017
Pantheon Resources plc
Operational Update
Pantheon Resources plc ("Pantheon" or "the Company"), the AIM-quoted oil and gas exploration company with a working interest in several conventional projects in Tyler and Polk Counties, onshore East Texas, provides the following update:
VOBM#3, Polk County - successful flow testing operations
The Company is pleased to announce that the operator has utilized the testing equipment booked for the VOBM#2H well to retest the VOBM#3 well ahead of connection to the gas processing facility. At the end of the test period, the VOBM#3 well flowed at a stabilized rate of c.1,900 mcfpd and 130 bopd at a flowing tubing pressure of 4,000 psi on a 10/64ths choke. This equates to 446 boepd which is in the middle of the 270-740 boepd range reported last November.
VOBM#2H, Polk County - flow testing operations
The workover rig has arrived on location and the packer and tubing have been set prior to testing operations being undertaken this week. Given the previously disclosed issues with the suboptimal VOBM#2H well bore configuration, an extended test may be conducted in order to optimise production. Results will be provided on conclusion of testing.
VOBM#4, Tyler County - wellbore sidetrack
The Company is pleased to confirm that the rig remains on schedule for arrival on location on or about 24 October 2017 for the planned sidetrack procedure. Once underway, operations are expected to take around 30 to 40 days on a trouble free basis with testing to occur thereafter. Results will be reported at the conclusion of testing.
Gas processing facilities, Polk County
All necessary components for the Kinder Morgan gas processing facility are now on location and assembly is progressing well. First gas sales remain on track to commence in early November 2017, with receipt of first production revenues to follow in December 2017. Images showing construction of the facility can be found in the image gallery on the Company's website at www.pantheonresources.com.
Jay Cheatham, CEO, said:
"I am very pleased with the flow rates from the VOBM#3 well in Polk County, particularly because they remained steady across the production test, unlike during testing in November last year when they were highly variable. This is a positive sign.
"Most wells in the Double A Wells Field were produced on a much larger choke size than 10/64ths, and I would expect to see higher production rates from the VOBM#3 well once the gas processing facility is operational. Construction of the Kinder Morgan gas processing facility is on schedule for anticipated first production in early November. The commencement of first production and the receipt of production revenues shortly thereafter will be a major milestone for Pantheon.
"We know that the bends and curves in the VOBM#2H well bore, arising from horizontal drilling issues, are sub optimal for completions and production. However, the well logs are exceptional and the well location, between VOBM#1 and VOBM#3, both of which will be producers, give us confidence that the well location has great potential. Our challenge now is to optimise flow rates given these factors. We will likely complete an extended test and I look forward to providing an update once testing has completed."
Further information:
+44 20 7484 Pantheon Resources plc 5361 Jay Cheatham, CEO Justin Hondris, Director, Finance and Corporate Development Stifel Nicolaus Europe Limited (Nominated +44 20 7710 Adviser and broker) 7600 Callum Stewart Ashton Clanfield Nicholas Rhodes +44 20 3727 FTI Consulting (Communications adviser) 1000 Ed Westropp James Styles
For further information on Pantheon Resources plc, see the website at: www.pantheonresources.com
In accordance with the AIM Rules - Note for Mining and Oil & Gas Companies - June 2009, the information contained in this announcement has been reviewed and signed off by Jay Cheatham, a qualified Chemical & Petroleum Engineer, who has over 40 years' relevant experience within the sector.
The information contained within this RNS is considered to be inside information prior to its release.
Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website
Glossary
boepd barrels of oil equivalent per day bopd barrels of oil per day mcfpd thousand cubic feet of gas per day psi pounds per square inch
This information is provided by RNS
The company news service from the London Stock Exchange
END
DRLBCBDGRSBBGRG
(END) Dow Jones Newswires
October 11, 2017 02:00 ET (06:00 GMT)
1 Year Pantheon Resources Chart |
1 Month Pantheon Resources Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions