ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

ORCP Oracle Power Plc

0.0275
-0.0025 (-8.33%)
19 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Oracle Power Plc LSE:ORCP London Ordinary Share GB00B23JN426 ORD 0.001P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  -0.0025 -8.33% 0.0275 0.025 0.03 0.03 0.0265 0.03 7,590,812 15:06:51
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Coal Mining Services 0 -1.29M -0.0003 -1.00 1.12M

Oracle Power PLC Jundee East: Substantial New Greenstone Belt (4092R)

08/03/2021 7:00am

UK Regulatory


Oracle Power (LSE:ORCP)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Oracle Power Charts.

TIDMORCP

RNS Number : 4092R

Oracle Power PLC

08 March 2021

8 March 2021

Oracle Power PLC

("Oracle", the "Company")

Jundee East Gold Project - Western Australia

Gravity Survey Reveals Substantial New Greenstone Belt and Intrusion Target

Oracle Power PLC (AIM:ORCP), the AIM listed natural resources and power project developer, is pleased to announce that the recent gravity survey conducted across the Jundee East Gold Project, located in the Eastern Goldfields region of Western Australia ('Jundee East' or the 'Project'), has confirmed the presence of a newly identified substantial greenstone belt located directly adjacent and east of the Jundee Gold Mine. In addition, a high priority felsic intrusive related target has also been identified.

HIGHLIGHTS:

-- A newly identified substantial greenstone belt has been delineated within the Jundee East as part of the latest gravity survey and processing undertaken by Oracle

   --    Greenstone is the key host rock for gold mineralisation in the Jundee area 
   --    The blind greenstone belt is modelled to occur within 100m of the surface 

o The greenstone belt is located 9km due east of the Jundee Gold Mine which has produced over 7Moz Au.

   --    Interpreted felsic intrusive body covers an extent of 1.2 x 1.5km 

-- Structural setting of intrusive body represents a compelling target due to its proximity to a major regional fault

-- Intrusions can add structural complexity and enhance structural development favourable for hosting gold mineralisation bodies.

Naheed Memon, CEO of Oracle, commented :

"We have further increased our confidence in the Jundee East target with the compelling results from the gravity survey Oracle has undertaken. Independent processing and interpretation work on the survey, conducted by Value Adding Resources in Australia, has confirmed the presence of a new substantial greenstone belt in a favourable structural setting located in close proximity to the Jundee Gold Mine. The high priority intrusion related target has been modelled across an extent of 12km and commences within 100m of surface.

Follow up activities are now being planned. The programme will include planning and permitting of aircore drilling across the primary target areas. The aircore drilling programme aims to directly target mineralisation and get a further understanding of the bedrock lithologies."

To view the RNS with images, please use the following link:

http://www.rns-pdf.londonstockexchange.com/rns/4092R_1-2021-3-7.pdf

Jundee East Project:

Figure 1 : Gravity Inversion Model- Jundee East

Figure 2 : Jundee East Project location Map showing proximity to the Jundee Gold Mine

The Jundee East Project is comprised of one exploration licence under application (E53/2140) and located about 7km due east of the Jundee Gold Mine. The area of the Project is 29 blocks (89.3km(2) ). The Project is located within the Yandal Gold Province, a Tier 1 gold belt, host to numerous multi-million-ounce gold systems.

The Jundee East Project represents a previously unrecognised greenstone belt covering an area of 80km(2) , proximal to the Jundee Gold Mine, host to previous production and resource of >7Moz gold.

Gravity data is one of the main tools used in exploring under sediment cover, which is one of the primary challenges facing minerals exploration. The data can be used to create 3D models of the subsurface, providing a better understanding of the structure and geological setting. A gravity map of the Jundee region is shown below.

Figure 3 : Gravity Data Imagery and 1VD Magnetic Imagery

A comparison between the gravity response of the Jundee Gold Mine and the Project provides a similar level of density response. The gravity mapping suggests that major portion of the Project is potentially located in an unrecognised Greenstone Belt which is approximately 20km long and 5km wide with a noticeable 'bend' (with some portion in Granites). This is contrary to the magnetic interpretation (potentially different due to sediment cover).

Detailed 3D modelling of gravity-based response shows a strong degree of correlation of gravity response between that of the Jundee Gold Mine and Project which further supports the initial 2D interpretation in Figure 3.

The degree of the structural complexity of the greenstone unit within the Project including multiple structures which extend from mineralised zones of the Jundee Mining Camp into the tenure significantly upgrades the prospectivity for hosting structurally controlled gold mineralisation within the greenstone body.

About Oracle Power PLC:

Oracle Power PLC is an international natural resource and power project developer listed on London's AIM market. The Company is focussed on delivering reliable and affordable power in emerging developing markets, unlocking the value of underutilised and undeveloped natural resources to provide energy security and support economic growth and development. Its initial project is the Thar Block VI Project in the Thar desert in the south-east of the Sindh province of Pakistan. The Thar Project is a 66.1 sq km licence containing 1.4 billion tonnes of coal, where the Company, together with its partners China National Coal Development Company Ltd. (CNCDC) and the private office of His Highness Sheikh Ahmed Bin Dalmook Juma Al Maktoum, is advancing a combined lignite coal mine, a 1,320MW mine mouth power plant and a proposed coal gasification to urea project.

The Company also holds two highly prospective gold assets in two globally significant gold regions of Western Australia. The Northern Zone Project is located 25km east of the major gold mining centre of Kalgoorlie, the home of the 'Super Pit' mine, the second largest gold mine in Australia, and the Jundee East Gold Project is located 9km east of Northern Star's Jundee Gold Mine, one of Australia's largest gold mines.

*ENDS*

For further information on Oracle Power Plc, visit the Company's website http://www.oraclepower.co.uk or contact:

 
 Oracle Power PLC                               +44 (0) 203 580 
  Naheed Memon                                   4314 
 Strand Hanson Limited (Nominated Adviser)      +44 (0) 20 7409 
  Rory Murphy, James Harris, Jack Botros         3494 
 Brandon Hill Capital Limited (Joint Broker)    +44 (0) 203 463 
  Oliver Stansfield                              5000 
 Shard Capital (Joint Broker) 
  Damon Heath 
  Isabella Pierre 
  St Brides Partners Limited (Financial         +44 (0) 20 7186 
  PR)                                            9952 
  Susie Geliher                                  +44 (0) 20 7236 
  Catherine Leftley                              1177 
 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

UPDJRMMTMTJMTIB

(END) Dow Jones Newswires

March 08, 2021 02:00 ET (07:00 GMT)

1 Year Oracle Power Chart

1 Year Oracle Power Chart

1 Month Oracle Power Chart

1 Month Oracle Power Chart

Your Recent History

Delayed Upgrade Clock