ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

NHY Norsk Hydro

583.00
0.00 (0.00%)
Last Updated: 01:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Norsk Hydro LSE:NHY London Ordinary Share NO0005052605 ORDS NOK1.098
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 583.00 539.50 626.50 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Norsk Hydro: Hydro to resume production on Husnes line

14/12/2017 6:01am

GlobeNewswire Inc.


Norsk Hydro (LSE:NHY)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Norsk Hydro Charts.

Hydro has made an investment decision to upgrade and start up the second production line at Hydro Husnes, Norway. With both lines in operation, production of primary aluminium at Husnes will double.

In the restart of the line, which was shut down in 2009, Hydro will introduce new technology elements that will give better results. The line is expected to begin operations in the first half of 2020 and will create 90 new positions.  

"We have great faith in continued aluminium production in Norway. We are making use of new technology elements in this re-start, and building up a robust and future-oriented plant at Husnes. For Husnes, this means increased profitability, lower energy consumption and additional jobs," says Hilde Merete Aasheim, Head of Primary Aluminium in Hydro.

Hydro Husnes today produces about 95,000 tonnes of primary aluminium per year. With the re-start, the plant will produce approx. 190,000 tonnes of aluminium annually.

"In the aim of minimizing operating costs we have, since 2009, sourced equipment and components from the closed line for operations and maintenance of the producing line. This means that we need to upgrade the closed line before re-starting, and we make use of new technology when we do so that will contribute to increased productivity and lower energy use," Aasheim says.

The expected total investment for the upgrade and re-start is NOK 1.3 billion (in 2017 terms). Final build decision is expected in Q3 2018.

Hydro Husnes employs 245 people, and became fully owned by Hydro in November 2014.Investor contactEven Simonsen+47 97953364Even.Simonsen@hydro.com

Media contactHalvor Molland+47 92979797Halvor.Molland@hydro.com

1 Year Norsk Hydro Chart

1 Year Norsk Hydro Chart

1 Month Norsk Hydro Chart

1 Month Norsk Hydro Chart

Your Recent History

Delayed Upgrade Clock