ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

MSMN Mosman Oil And Gas Limited

0.0165
0.00 (0.00%)
25 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Mosman Oil And Gas Limited LSE:MSMN London Ordinary Share AU0000XINET1 ORD NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.0165 0.016 0.017 0.017 0.0165 0.0165 54,870,000 11:11:41
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Crude Petroleum & Natural Gs 2.25M -2.13M -0.0005 -0.40 801.84k

Mosman Oil and Gas Limited Operations update (4015P)

17/02/2021 8:03am

UK Regulatory


Mosman Oil And Gas (LSE:MSMN)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Mosman Oil And Gas Charts.

TIDMMSMN

RNS Number : 4015P

Mosman Oil and Gas Limited

17 February 2021

17 February 2021

Mosman Oil and Gas Limited

("Mosman" or the "Company")

Operations update

Mosman Oil and Gas Limited (AIM: MSMN) the oil exploration, development and production company, announces an update on operations in the US.

Stanley

The Operator has recently recompleted Stanley-1 in a zone that has been productive in Stanley-2, and initial flow rates (3 day average) are 47 bopd gross. The Company will provide a further update in due course once production rates have stabilised at Stanley-1.

Stanley-2, 3 and 4 continue to produce oil, with a total project production (including Stanley 1) of circa 260 bopd (3 day average) gross. Mosman has 16-18% working interest in these wells. Water production is managed by on-site water injection that has not been affected by recent unusual cold weather conditions.

Falcon

Minor equipment upgrades have been installed at the Falcon-1 well. The well has been temporarily shut-in since 15 February due to the weather conditions, to avoid water vapour freezing in the gas lines. Oil production and produced water is stored in tanks and has to be trucked off site. The Operator expects to have the well back on production once freezing conditions end, which are forecast to improve and warm up on Saturday. Mosman has 50% working interest in this well. Further updates will be provided in due course.

Other Production

The majority of current production comes from the Stanley and Falcon projects. Mosman has not been advised of any effect of the weather on other facilities such as Greater Stanley and Arkoma.

Drilling opportunities

Mosman confirms its intention to participate in the drilling of multiple wells in the 2021 year.

The candidates for drilling include wells at the Stanley project (where four wells have already been drilled with a 100% drilling success rate) and other wells in East Texas, including wells at Greater Stanley, Cinnabar and Galaxie. Of these projects, Mosman only has control of the timing of operations where it is the Operator, at the Cinnabar lease.

The Cinnabar lease acquisition is considered a potential cornerstone of the Challenger Project to re-develop the proven oil producing area. Mosman has 97% working interest (reducing to 85% upon drilling of the first well) in the Cinnabar lease and is the Operator. The initial review of existing data has led Mosman to commit to a full field redevelopment study that will be based on technical work which includes the following:

   --      Acquiring additional seismic data 
   --      Reprocessing the seismic data 
   --      Revised geological model 
   --      Acquiring additional leases 
   --      Identifying optimal drilling locations 
   --      Designing wells 
   --      Drilling planning 

The successful drilling of Falcon-1 means there are several prospects to be drilled in the Falcon and Galaxie lease area (Champion Project). The Falcon-1 well production data will be used to estimate the size of that gas field, and to update the geological model, before a decision is made where to drill the next well in the Champion Project. Mosman has 50% interest in the Falcon lease and 60% working interest in the Galaxie lease.

There are several potential wells in the Greater Stanley area that require further work before being ready to drill. The work includes leasing, gaining well spacing approval and technical work to determine optimal target locations. The zone that is producing at Stanley-1 and 2 is thought to extend in to the Duff lease, and is a candidate for recompletion of the Duff-2 well. Mosman has 20% working interest in the Duff lease.

John W Barr, Chairman, said: "Mosman appreciates the work and effort that is involved in getting a project completed and maintaining solid production. Presently, the Covid pandemic, heavy rain and this severe cold weather are examples of reasons why things sometimes take longer than anticipated.

"For the moment, the safety of people, and the operations is imperative. Hopefully, normality will return shortly, along with communications that have been difficult due to rolling power blackouts."

Qualified Person's Statement

The information contained in this announcement has been reviewed and approved by Andy Carroll, Technical Director for Mosman, who has over 35 years of relevant experience in the oil industry. Mr. Carroll is a member of the Society of Petroleum Engineers.

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

Enquiries:

 
 Mosman Oil & Gas Limited            NOMAD and Joint Broker 
  John W Barr, Executive Chairman     SP Angel Corporate Finance LLP 
  Andy Carroll, Technical Director    Stuart Gledhill / Richard Hail 
  jwbarr@mosmanoilandgas.com          / Adam Cowl 
  acarroll@mosmanoilandgas.com        +44 (0) 20 3470 0470 
 Alma PR                             Joint Broker 
  Justine James                       Monecor (London) Ltd trading as 
  +44 (0) 20 3405 0205                ETX Capital 
  +44 (0) 7525 324431                 Thomas Smith 
  mosman@almapr.co.uk                 +44 (0) 20 7392 1432 
 

Updates on the Company's activities are regularly posted on its website: www.mosmanoilandgas.com

Technical Glossary

 
 BBLs or bbls      Barrels 
 BOPD or bopd      barrels of oil per day 
                  =============================================== 
 BOEPD or boepd    barrels of oil equivalent per day calculated 
                    on the approximate 1:6 basis of the calorific 
                    value of the hydrocarbons, (not based 
                    on the price) 
                  =============================================== 
 MMCFPD or mmcfd   Million cubic feet per day 
  MMBTU 
                    Million British Thermal Units 
                  =============================================== 
 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

UPDSFESAWEFSESE

(END) Dow Jones Newswires

February 17, 2021 03:03 ET (08:03 GMT)

1 Year Mosman Oil And Gas Chart

1 Year Mosman Oil And Gas Chart

1 Month Mosman Oil And Gas Chart

1 Month Mosman Oil And Gas Chart

Your Recent History

Delayed Upgrade Clock