ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

MYN Mayan Energy Limited

0.14
0.00 (0.00%)
25 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Mayan Energy Limited LSE:MYN London Ordinary Share VGG5S26K1152 ORD NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.14 0.13 0.15 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Mayan Energy Limited Update on Heavy Oil Sands Project, Utah (1557U)

10/07/2018 10:00am

UK Regulatory


Mayan Energy (LSE:MYN)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Mayan Energy Charts.

TIDMMYN

RNS Number : 1557U

Mayan Energy Limited

10 July 2018

Mayan Energy Ltd / Index: AIM / Epic: MYN/ ISIN: VGG6622A1057 / Sector: Oil and Gas

10 July 2018

Mayan Energy Ltd ('Mayan' or 'the Company')

Update on Heavy Oil Sands Project, Utah

Mayan Energy Ltd (AIM: MYN), the AIM listed oil and gas company, is pleased to note the following update from TSX listed Petroteq Energy Inc ('Petroteq') (TSXVE: PQE OTC: PQEFF) regarding the Asphalt Ridge heavy oil sands project, Utah. Mayan has a 17.3% interest in Deloro Energy LLC ('Deloro') which is invested in the Asphalt Ridge heavy oil sands project ('the project').

Full Text of Petroteq's Release

Petroteq Energy Inc. ("Petroteq" or the "Company") (TSXV: PQE; OTC: PQEFF; Frankfurt: A2DYWC), a company focused on the development and implementation of proprietary technologies for the energy industry, is pleased to update investors on the progress at its Oil Extraction.

Second quarter activities secured the completion of construction at the Asphalt Ridge facility, which is designed to produce 1,000 barrels per day (bod). The Company's recent news for the first half of 2018 has been very exciting:

   --     New capital approximately US$3.86 million to date in 2018 
   --     The placement of key technical advisors to Petroteq's advisory board 
   --     Initial production 

News in July is what our current and future investors will be most interested in, we are on track to initiate "full on" operations at the end of July and ramp up our production to what we expect will be 1,000 bod.

On June 14th, Petroteq commenced its process train commissioning and start up with the successful completion of "first commissioning oil production" at our operations of the Phase 2 - expansion at the Asphalt Ridge heavy oil extraction facility located near Vernal, Utah, designed to produce 1,000 bod.

These operational developments have driven multiple initiatives at the Company that are anticipated to help the Company grow from its current position:

1. New research and development projects are underway which should further increase the efficiency and applicability of Petroteq's patented extraction technology.

2. Petroteq has staffed up its internal team and advisory board to handle multiple business development initiatives related to domestic and international opportunities.

"The Asphalt Ridge project has surpassed expectations. The facility process trains are coming fully online safely, the production ramp-up plan is on schedule, and the commissioning and start-up activities are set to produce a high-quality heavy oil. We are especially appreciative of the dedication and careful planning and execution that our team and partners have demonstrated in achieving this remarkable result," said David Sealock, Chief Executive Officer. "Our investors and stakeholders can be proud of advances being made initiating the ramp-up of our production."

"The successful completion of construction and commissioning at the Asphalt Ridge project is the direct result of a well-developed and executed strategy to complete construction and accelerate commissioning using synergies between our technical team and Asphalt Ridge operations staff", said Alex Blyumkin, Founder and Executive Chairman, "the progressive hand off from construction to operations, is expected to see a staged ramp-up of production over time. The project was built during a period of low oil prices and has come online just as oil prices have strengthened."

Following the June 14, 2018 "first commissioning oil production" of Asphalt Ridge's first train, Petroteq anticipates operating the plant at a "ramp up capacity" by the end of July, which would prove the design capacity of 1,000 bod. At this time, the Company will be completing a two-week reliability test of the plant running in excess of 80% capacity.

About Petroteq Energy Inc.

Petroteq is a fully integrated oil and gas company focused on the development and implementation of a new proprietary technology for oil extraction. The Company has an environmentally safe and sustainable technology for the extraction of heavy oils from oil sands, oil shale deposits and shallow oil deposits. Petroteq is engaged in the development and implementation of its patented environmentally friendly heavy oil processing and extraction technologies. Our proprietary process produces zero greenhouse gas, zero waste and requires no high temperatures. Petroteq is currently focused on developing its oil sands resources and expanding production capacity at its Asphalt Ridge heavy oil extraction facility located near Vernal, Utah. The Company also owns a minority stake in an exploration and production play located in southwest Texas held by Accord GR Energy Inc. In addition, the Company, through its wholly-owned subsidiary PetroBLOQ, LLC, is seeking to develop the first blockchain based platform created exclusively for the supply chain needs of the oil & gas sector. For more information, visit www.Petroteq.energy and PetroBLOQ.com.

**ENDS**

For further information visit www.Mayan energy.com or contact the following:

 
 Eddie Gonzalez    Mayan Energy Ltd              + 1 469 394 2008 
 Charlie Wood      Mayan Energy Ltd              +44 7971 444 326 
 Roland Cornish    Beaumont Cornish Ltd          +44 20 7628 3396 
 James Biddle      Beaumont Cornish Ltd          +44 20 7628 3396 
 Nick Bealer       Cornhill Capital Limited      +44 20 7710 9612 
 Frank Buhagiar    St Brides Partners Limited    +44 20 7236 1177 
 Gaby Jenner       St Brides Partners Limited    +44 20 7236 1177 
 

Notes:

Mayan Energy Limited is an AIM listed (London Stock Exchange) North American based energy Company. The Company is actively pursuing a primary recovery oil strategy focused on re-stimulating wells within mature producing basins with immediate cash flow leveraging commercially available technologies and projects that are shallow, low risk with low levels of capex and infrastructure already in place. It also remains interested in creating shareholder value by strategic investments in similar projects with high cash generative potential and by forming beneficial development partnerships that enable the use of pioneering and leading extraction technologies. The Company is currently primarily focussed on building out production at its Stockdale and Forest Hill oil fields in Texas.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

END

MSCEAPXEFSLPEEF

(END) Dow Jones Newswires

July 10, 2018 05:00 ET (09:00 GMT)

1 Year Mayan Energy Chart

1 Year Mayan Energy Chart

1 Month Mayan Energy Chart

1 Month Mayan Energy Chart

Your Recent History

Delayed Upgrade Clock