ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

LKOH Pjsc Lukoil

56.2184
0.00 (0.00%)
25 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Pjsc Lukoil LSE:LKOH London Ordinary Share RU0009024277 ORD RUB0.025
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 56.2184 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

PJSC LukOil FACILITIES INSTALLATION LAUNCH AT FILANOVSKY FIELD

31/07/2018 8:59am

RNS Non-Regulatory


TIDMLKOD

PJSC LukOil

31 July 2018

LUKOIL STARTS INSTALLATION OF

WELLHEAD PLATFORM SUBSTRUCTURE AT THE VLADIMIR FILANOVSKY FIELD IN THE CASPIAN SEA

LUKOIL completed transportation and started installation of the substructure for the wellhead platform (mini offshore ice-resistant fixed platform) at the Vladimir Filanovsky field in the Caspian Sea.

The wellhead platform is designed to produce and gather crude oil, as well as to supply it to the central processing platform of the first stage of the field. The wellhead platform is being built as part of the third stage of the field, which is implemented to develop the Western part of the reservoir and maintain stable production plateau.

The substructure for the wellhead platform was built at the Galaktika shipyard in Astrakhan and transported to the installation site via the Volga-Caspian Shipping Canal.

LUKOIL-Nizhnevolzhskneft, a wholly owned subsidiary of LUKOIL, is currently building the topside for the wellhead platform at its construction and assembly yard.

Start of crude oil production at the wellhead platform is scheduled for 2019. Nearly all operations of the facility will be automated, resulting in the minimal involvement of service personnel.

For reference:

The Vladimir Filanovsky field was commissioned in 2016. Its initial recoverable reserves amount to 129 million tons of crude oil and 30 billion cubic meters of gas.

To date, cumulative crude oil production at the Caspian fields of LUKOIL has exceeded 17 million tons. All offshore facilities have been built at the Russian shipyards.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

END

NRAUAVBRWWABORR

(END) Dow Jones Newswires

July 31, 2018 03:59 ET (07:59 GMT)

1 Year Pjsc Lukoil Chart

1 Year Pjsc Lukoil Chart

1 Month Pjsc Lukoil Chart

1 Month Pjsc Lukoil Chart

Your Recent History

Delayed Upgrade Clock