ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

GRL Goldstone Resources Limited

2.15
0.00 (0.00%)
Last Updated: 01:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Goldstone Resources Limited LSE:GRL London Ordinary Share JE00BRJ8YF63 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 2.15 - 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Gold Ores 0 -1.52M -0.0033 -6.52 9.87M
Goldstone Resources Limited is listed in the Gold Ores sector of the London Stock Exchange with ticker GRL. The last closing price for Goldstone Resources was 2.15p. Over the last year, Goldstone Resources shares have traded in a share price range of 2.125p to 4.95p.

Goldstone Resources currently has 459,033,996 shares in issue. The market capitalisation of Goldstone Resources is £9.87 million. Goldstone Resources has a price to earnings ratio (PE ratio) of -6.52.

Goldstone Resources Share Discussion Threads

Showing 26501 to 26521 of 31550 messages
Chat Pages: Latest  1070  1069  1068  1067  1066  1065  1064  1063  1062  1061  1060  1059  Older
DateSubjectAuthorDiscuss
10/2/2020
16:05
2.19 paid for 75k
neilyb675
10/2/2020
15:52
MM wants shares.

Offering 2.175p to sell quantity.

neilyb675
10/2/2020
15:05
Importantly, there is a sell of 140k at 2.02p.

Despite this still cannot buy 10k shares online.

MMs in total control here.

WHAT DO THEY KNOW ?!

neilyb675
10/2/2020
15:04
2.10p PAID
neilyb675
10/2/2020
15:01
Worth re-posting and this was based on a lot lower POG:

DEP Highlights

-- The shallow, free dig mining of the oxide/weathered ore zones only at the Proposed Mine
-- Based on establishing a cyanide heap leach processing facility and recommends using a contract mining method

-- Total initial capital costs (including pre-stripping and contingency) estimated to be US$6.5 million

-- Summary economics
- An after-tax Net Present Value of US$19.5 million (at a 10% discount rate)
- An after-tax IRR of 143% at a gold price of US$1,300 per ounce (oz)
- An after-tax payback of the initial capital cost within 1 year
-- The DEP estimates that the mineable resource from the Proposed Mine is approximately 82,000 oz of contained gold in oxide ore with a projected 82% recovery from 2.17 million tonnes of oxide ore at an average grade of 1.2 g/t gold (the "Mineable Resource")

- Mineable resource is part of the AKHM JORC Resource of 602,000 oz
- Recovery based on proven by column leach testing at University of Mines and Technology Tarkwa ("UMaT")

- The Company is proposing to also place tailings from the former Akrokeri Underground Mine ("Akrokeri Tailings"), which the Company estimates to include approximately 91,000 tonnes at an average grade of 2.27 g/t gold, equating to approximately 6,500 oz of contained gold with a recovery of 73%. Recovery rate based on bottle roll test-work completed by ALS Laboratories Kumasi

-- The DEP estimates that the total plant feed from the Proposed Mine and the Akrokeri Tailings will be approximately 2.26 million tonnes with an average grade of 1.2 g/t gold giving total ounces to the plant of approximately 88,500 oz

- The DEP estimates that the heap leach facility will recover, in total, approximately 72,000 oz, giving an overall Life of Mine ("LOM") recovery of approximately 81%

-- Proposed LOM projected to be five years, with an average all-in cost, that includes capital plus cash costs, of US$852/oz

- LOM capital cost, including sustaining capital costs, estimated to be US$8.4 million

highly geared
10/2/2020
15:01
Your order can not be completed automatically
Your order cannot be completed automatically at this time, but can still be submitted as a negotiated order. Reasons for this could include market volatility, the size of your order, or because there is not enough electronic stock available to match your order.
Because your order cannot be completed automatically we cannot guarantee the share price at the time of your trade.
Your order will be sent directly to our Dealers who will negotiate the best price available for your order in the market at that time. All orders will be completed in fair and due turn as soon as is practically possible.
Once you have placed a negotiated order you do not have the facility to cancel this instruction online.
BUY: 10000 GRL - GOLDSTONE RESOURCE ORD GBP0.01

neilyb675
10/2/2020
14:55
50p to break even. Holding for 10 yrs.


Disgrace

spacedust
10/2/2020
14:52
is there a mega RNS about to land in the morning ?!
neilyb675
10/2/2020
14:51
only 5k available online
neilyb675
10/2/2020
14:49
2.2p to enter
neilyb675
10/2/2020
14:38
malcontent

try buying mate, I can't even get a quote for 10k shares now...

neilyb675
10/2/2020
14:36
held my seed stake for a while now
can we break above 2p?
then it's time to add

enjoying the ride at GGP
If this can do anything similar, I would be more than pleased

malcontent
10/2/2020
14:36
2.02 quoted to sell....MMs very short
neilyb675
10/2/2020
14:35
cannot even buy 10k shares
neilyb675
10/2/2020
14:34
1.90 - 2.10 (GBX) at 14:30:32
on Market (LSE)

neilyb675
10/2/2020
12:58
15k NT now
neilyb675
10/2/2020
12:46
20K now NT, MMs are seriously short of shares here.
neilyb675
10/2/2020
12:26
50k available
neilyb675
10/2/2020
11:30
The delay is with the government granting the mining lease , not with Emma Priestley competence but it appears some on here don’t have the brain cells to grasp that but instead post defamatory posts ...
highly geared
10/2/2020
10:26
that's only 400 quid worth
neilyb675
10/2/2020
10:23
something is going on here...

cannot buy 20k shares

neilyb675
Chat Pages: Latest  1070  1069  1068  1067  1066  1065  1064  1063  1062  1061  1060  1059  Older

Your Recent History

Delayed Upgrade Clock