ADVFN Logo

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

EQT Eqtec Plc

2.25
-0.10 (-4.26%)
Last Updated: 14:18:58
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Eqtec Plc LSE:EQT London Ordinary Share IE000955MAJ1 ORD EUR0.01 (CDI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  -0.10 -4.26% 2.25 2.20 2.30 2.35 2.25 2.35 1,104,425 14:18:58
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Electric Services 7.97M -10.53M -0.0712 -0.32 3.33M
Eqtec Plc is listed in the Electric Services sector of the London Stock Exchange with ticker EQT. The last closing price for Eqtec was 2.35p. Over the last year, Eqtec shares have traded in a share price range of 0.225p to 4.65p.

Eqtec currently has 147,832,044 shares in issue. The market capitalisation of Eqtec is £3.33 million. Eqtec has a price to earnings ratio (PE ratio) of -0.32.

Eqtec Share Discussion Threads

Showing 10251 to 10275 of 11375 messages
Chat Pages: Latest  419  418  417  416  415  414  413  412  411  410  409  408  Older
DateSubjectAuthorDiscuss
20/3/2023
15:15
On linkedin Agrigas has posted new photos and a job advert yesterday so the team will be expanding into live running.

The company Agrigas Energy S.A. is looking for an Electrician or Mechanical Engineer for employment in a power plant.

It will be appreciated:

experience in an industrial environment
experience in a similar position
good knowledge of English language
possibility to work in a circular shift system

From LSE, Martinu & Aandi:

stevea171
20/3/2023
15:03
With continuous commecial running now demonstrable for the first time at the Italia DMC the whole EQT prospect has flipped from very high risk (and behind it in sequence some 15-20 projects) the many SPVs like Deeside and Stockport should be unlocked and long term enthusiasts for waste to energy technology vindicated. I see the previous 3.00p/share high returning relatively quickly with nowhere else in the market remotely as attractive.

The French DMC will double all that potential in the EU, now validated in the Balkans/Italy,Its magnitude, and the support from EU Hydrogen policy, will add a new exponentially growing alternate energy stream to those already inseminated in California, northern UK, and Ireland At least 800 seriously polluting incineration plants need replacing in Europe alone to remove dioxins and many more to deal with waste plastic.

The whole desperately needed concept of waste to hydrogen has looked undoable for years. Look how PHE has chalked up serial failures for the last 20 years. and still hasn't got a drawing let alone a working prototype. I seriously thought that noone would ever get this to work properly.

IT HAS , WITH 'HOT' COMMISIONING OF THE ITALIA DMC, SUDDENLY BEEN DE-RISKED.

INCREDIBLE.

This month we have seen a mountain beginning to move, that hardly anyone has noticed.

scrutable
19/3/2023
20:39
Completed Agrigas plant, Greece. It seems a lot has been achieved with cold commissioning in the last week or so as per comments in post 3899.

With the info made available last week I also expect this plant to move to hot commissioning soon. What is difficult to estimate is speed of suppliers to respond to any failures of components as the plant will not carry a full set of spares for every component that could be defective or break down.

EQT very likely will not give any forecast for COD because of:
What happened with Italia MDC
It is not their project but that of Agrigas

stevea171
18/3/2023
20:42
From Aandi, LSE. Agrigas Greek project cold comissioning.

I'm predicting 1 to 2 months before it's online. Then all teams can be re-deployed to Croatia/France/Northfork

Cold commissioning has started, so all items are mechanically complete and being tested and brought online. There isn't a biochar, additional feeding in system, dryer or thermal oxidiser being added as was done to Italy MDC.

The Engine, a Siemens SGE 48SL is new and sitting in its own container. It will have been supplied tested and working and does not need reconditioned like the one at Italy which was what, 10 years old?

Table of stages of commissioning; Stage 7 is commissioning. Then safety checks then plant start up. And don't forget, mechanical completion and construction are two massive sub systems already completed by this stage.

From the photos, there aren't an army of workers with tool bags still installing parts. The plant looks finished.

Could we be ready to come online in around a month???

Black tape spotted on pipes in the background = pressure tests done
Laptops out.. Are they connecting to the PLC? This would mean the systems are at least partly powered up

Also, this plant is a new build and only 0.5MW and less complex than Italy. And the weather and christmas won't get in the way, also Eqtec will have learned some things from Italy. Lastly, additional funding has clearly been found to complete the project so financial constraints have now been removed. As Eqtec don't own any of this project, the finances are not our problem. All we do is get paid for services provided and end up with another proof that the technology works.

stevea171
17/3/2023
16:31
The are saying transfer of Italian site by the end of March on twitter
kwizza
17/3/2023
10:30
I have written a while ago to Agrigas enquiring about the minutes of the EGM last month and in particular Item 1 on the Agenda. No reply.

So keeping the countdown under wraps!

stevea171
17/3/2023
10:16
I'm sure they will; they're busy commissioning plants or meeting prospective investors and partners at the moment. Gives people an incredible opportunity to invest at these levels; reminds me of 2020; same time of year; this time with actual projects being delivered not jam tomorrow.
aja2
17/3/2023
10:04
Thanks Steve (and aandi). Perhaps the company could issue an update to bring all this together and to a slightly wider public?
m4rtinu
17/3/2023
09:59
AgriGas Larissa EGM Agenda, 23rd Feb 2023,

1. Project progress update and its completion (project installation-commissioning schedule)
2. Election of a new Board of Directors
3. Approval of organizational chart
4. Approval of payroll - staff recruitment
5. Update on the company's operating plan after the launch
6. Financial situation of the company

hxxps://www-agrigas-gr.translate.goog/2023/02/04/%cf%80%cf%81%cf%8c%cf%83%ce%ba%ce%bb%ce%b7%cf%83%ce%b7-%ce%b3%cf%83/?_x_tr_sl=el&_x_tr_tl=en&_x_tr_hl=en-US&_x_tr_pto=wapp

stevea171
17/3/2023
09:43
From Aandi, LSE: Satelite view of a huge stockpile of material stored across 2 sites for processing at Agrigas Larissa plant. It seems they may have got this material in from last year's harvest so they are all ready to go as soon as commissioning completes.


135886eac04a790d:0x832c50b74e5c792b!8m2!3d39.6188954!4d22.498942!16s%2Fg%2F11clydr957?hl=en

stevea171
16/3/2023
21:43
Next up in build in Greece. Synergy Livadia. This is the first of 3 plants in the EQT/Synergy pipeline for Greece.

Livadia Boeotia, Greece 1MW
Farming cooperatives
Straw, wood waste, olive waste 7,500 tonnes/year
Electrical power (1.0MWe)
Status: 80% funding agreed. F/C soon, due online 2024

stevea171
16/3/2023
21:32
Larissa, Greece under commissioning.

Gerd Kromarck.
Thanks to the teams supporting the commissioning!
Many thanks to ECO HELLAS for another great collaboration!
We are very delighted completing our first EPC gasification project together with EQTEC and we are excited for the next project completion of our Greek JV, SYNERGY AEGEAN.

Eleni Bairami.
Great team work by the Team: @ECO Hellas @EQTEC @ewerGy and @Agrigas in carrying out cold commissioning at the Larissa Project this week. A resilient and committed team doing whatever is required against all odds. Looking forward to having the first gasification plant operating in Greece in 2023!

stevea171
16/3/2023
20:36
EQT Agrigas Larissa plant, Greece. 5 new photos.

Cold commissioning happening at the 0.5MW Larissa project in Greece. After a few years of development this new build plant is complete and electrical fit out in progress as can be seen in photo. It is due online soon, likely this summer.
Projects delayed last year are now advancing well. This is one of 4 EQT plants likely to be commissioned this year. The others being Italia MDC, North Fork and Croatia MDC.

This is the first of a large pipeline of projects in Greece.

Jeffrey Vander Linden shared on Linked-in:



"With a 3,800 metric tonnes capacity per year, this gasification plant will take a mix of waste by-products from regional farmers during three harvest seasons of corn, wheat and cotton. Currently these materials are either incinerated or taken to landfill but once this project is commissioned, the waste will be formed into pellets, processed through EQTEC’s gasifier and converted into electricity which will be sold to the country’s grid system by the owner-operator, Agrigas Energy."

stevea171
16/3/2023
17:36
More buys than sells but still down in a positive market . The euphoria seems to be rapidly evaporating
juju44
16/3/2023
12:46
North Fork. 5 new photos:

Jeffrey Vander Linden (linkedin): Spot the difference (with previous photos). Growing momentum at North Fork Community Power in California’s Sierra mountains. On site again with EQTEC plc CTO and syngas wizard YOEL S. ALEMÁN MÉNDEZ. Small army of assembly subcontractors on site, bringing to life a first-of-kind modular facility for forestry waste to power and biochar. Remote, circular and scalable.

stevea171
16/3/2023
12:45
Check out some new photos from NF using the LinkedIn link above. Look for JVDL or Cosmi activity. Also, links on LSE from aandi.
m4rtinu
15/3/2023
14:55
Of another buyer for deeside
petersmith6
15/3/2023
08:55
Will need a cash injection soon
volsung
15/3/2023
08:54
I think expectations of a rapid recovery north are a bit misplaced
juju44
14/3/2023
18:39
Uncrossed @0.31p.

The third highest volume since last October.

skinny
14/3/2023
18:21
Showing as a buy
petersmith6
14/3/2023
17:38
But was it a sale ?
juju44
14/3/2023
17:31
MF - good call. At least, big trade.
m4rtinu
14/3/2023
17:13
Let's at least give credit for the operational Italia MDC. What share price did people expect? Eqtec still has a few bridges to cross. Cash still probably in short supply. And if Croatia is to be next, then that's at least 6 months to a year before on line. North Fork is anybody's guess. But today is a good step in the right direction.

AIM SPs are prone to sliding back after a couple of days' rise. If preliminary 22 FY figures are next, then that won't make great reading.

m4rtinu
14/3/2023
16:18
A big end of day sale coming up
mortgage freeman
Chat Pages: Latest  419  418  417  416  415  414  413  412  411  410  409  408  Older

Your Recent History

Delayed Upgrade Clock