ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

ENOG Energean Plc

988.50
-6.50 (-0.65%)
Last Updated: 11:18:30
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Energean Plc LSE:ENOG London Ordinary Share GB00BG12Y042 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  -6.50 -0.65% 988.50 989.00 990.00 993.00 985.00 990.50 69,577 11:18:30
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Crude Petroleum & Natural Gs 1.42B 184.94M 0.4576 21.61 4B

Energean PLC Independent CPR on Karish, Karish North and Tanin (7346E)

10/11/2020 7:00am

UK Regulatory


Energean (LSE:ENOG)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Energean Charts.

TIDMENOG

RNS Number : 7346E

Energean PLC

10 November 2020

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION

Energean plc

("Energean" or the "Company")

Independent CPR on the Karish, Karish North and Tanin fields, offshore Israel

Third party CPR certifies 3.5 Tcf (98.2 Bcm) of gas plus 99.6 million barrels of liquids gross 2P reserves in the Karish, Karish North and Tanin fields

London, 10 November 2020 - Energean plc (LSE: ENOG, TASE: ) )) is pleased to announce the completion of an independent Competent Persons Report ("CPR") by DeGolyer and MacNaughton ("D&M").

Highlights

-- Gross 2P reserves (Energean 70%) of 98.2 Bcm (3.5 Tcf) of gas and 99.6 million barrels ("MMbbls") of liquids certified in the Karish, Karish North and Tanin fields; representing approximately 729 million barrels of oil equivalent ("MMboe") [1]

o Gas 2P volumes are broadly aligned with the previous 2P + 2C estimates of 99 Bcm (3.5 Tcf)

o Approximately 241 MMboe [2] of gross 2C resources associated with Karish North have been upgraded into the 2P category following approval of the Field Development Plan ("FDP") by the Israeli government. Energean expects to take Final Investment Decision ("FID") on the Karish North development in 4Q 2020

o Liquids gross 2P volumes represent a 17.5 MMbbls (21.4%) uplift to previously estimated 2P reserve + 2C resource volumes

-- Liquids production from the fields is now expected to average 28 kbpd (gross) over a plateau period of approximately five years

o The additional liquids production is expected to have no discernible impact on scope 1 and scope 2 carbon intensity of the fields, which is expected to remain at approximately 6 kgCO2/boe

-- Gross best estimate risked prospective resources across the Karish and Tanin leases and Block 12 certified as 62.0 Bcm of gas plus 33.4 MMbbls of liquids.

o These prospective resource volumes will be targeted by Energean's next exploration campaign, which is expected to commence in early 2022

o All prospects are in close proximity to the Energean Power FPSO, representing potential low-cost tie-back options for future developments

o The Geological Probability of Success ("PoS") of these prospective resources ranges from approximately 15% to 79%, with the primary targets having a PoS range of 70% to 79%. Exploration of prospects that have a lower PoS, including targets in the D Sand, can be achieved without a dedicated exploration well

Mathios Rigas, CEO of Energean said:

"We are delighted that our independent reserves auditor has confirmed 2P gas volumes of 98 Bcm within our Karish, Karish North and Tanin fields, offshore Israel, representing another year of continuous reserves growth in our portfolio. This gas, the majority of which has already been contracted, will be sold under fixed-price gas sales agreements that will protect our revenue stream from commodity price fluctuations, which underpins our strategic goal of paying a sustainable dividend.

The approximately 100 MMbbls of 2P liquids reserves and production plateau averaging 28 kbpd over five years, represents a substantial increase on previous estimates, which further supplements our shareholder returns profile with high-margin production that has no incremental impact on our scope 1 and scope 2 CO(2) emissions intensity.

We look forward to progressing the 62 Bcm and 33 MMbbls of risked prospective resources across our Karish and Tanin leases and in Block 12, with the intention to recommence our successful exploration programme in early-2022 and, through doing so, will continue to contribute to the diversity and security of natural gas supply into Israel and the wider Eastern Mediterranean."

Reserves Volumes

D&M has certified gross 2P reserves of:

-- 98.2 Bcm (3.5 Tcf) of gas (previously 59.1 Bcm (2.1 Tcf) of 2P reserves plus 39.5 Bcm (1.4 Tcf) of 2C resources); and

-- 99.6 MMbbls of liquids (previously 41.5 MMbbls of 2P reserves plus 40.5 MMbbls of 2C resources)

Gross liquids reserves represent an uplift of 17.5 MMbbls (21.4 %) versus the previous 2P + 2C estimates of 82.0 MMbbls and result from the higher liquids content of the gas encountered in the Karish Main development wells and Karish North discovery wells. The liquids assayed are light and of high quality with samples from Karish Main measured at 48 API degrees. A potential oil rim has also been identified in the KM-03 development and is included in the 3P reserves category; upside to liquids volumes associated with the oil rim is estimated to be 25.7 MMbbls.

Approximately 241 MMboe [3] of Karish North gross 2C resources have been upgraded to the 2P reserves category following approval of the FDP by the Israeli government. Energean expects to take FID on the Karish North development in 4Q 2020 and first production is expected in 2023. Capital expenditure on the tie-back to the Energean Power FPSO is expected to be approximately $100 million and completion of the existing well as a producer in the C-sands, approximately $50 million. This capital expenditure is expected to be incurred in 2021-23.

Revised Gross (Energean 70%) 2P Reserves

 
                 Liquids   Sales Gas   Sales Gas   Total Oil Equivalent 
                  MMbbls      Bcf         Bcm            MMboe [4] 
 Karish           61.0       1,409       39.9             317.0 
                --------  ----------  ----------  --------------------- 
 Karish North     34.1       1,137       32.2             240.7 
                --------  ----------  ----------  --------------------- 
 Tanin             4.5        921        26.1             171.7 
                --------  ----------  ----------  --------------------- 
 Total            99.6       3,467       98.2             729.4 
                --------  ----------  ----------  --------------------- 
 

Production Rates

Gas

D&M forecasts plateau production from the Karish, Karish North and Tanin fields at a rate of approximately 7.2 Bcm/yr on plateau (gross). Energean's gas sales profile currently achieves 7.0 Bcm/yr (gross) on plateau and the company is pursuing a number of opportunities to fill the remaining space in its 8 Bcm/yr FPSO and export pipeline.

Production rates above 6.5 Bcm/yr require the installation of a second riser on the FPSO, which is expected to cost approximately $50 million. The riser is expected to become operational by end-2023.

Liquids

Following performance assessment, D&M estimates that liquids production from Karish Main and Karish North (exclusive of the potential oil rim) could deliver 28.4 kbpd at peak, and a production plateau averaging approximately 27.8 kbpd over five years.

The initial design capacity of the FPSO accommodates liquids production capacity of approximately 21 kbpd but enables easy addition of a second liquids processing train and associated gas compressor which will increase liquids production capacity to 40 kbpd. Capital expenditure associated with these facilities is estimated to be approximately $40 million, gross.

The FPSO has storage capacity of up to 800,000 bbls. Storage capacity is not expected to be a restricting factor to production; the increased production rate will be handled through increased frequency offtake with parcel sizes expected to remain in the region between 350 and 450 kbbls.

The additional liquids production is not expected to materially impact upon the scope 1 and scope 2 CO(2) intensity of the Karish development, which is expected to remain at approximately 6 kgCO2/boe. Scope 1 and scope 2 CO(2) emissions from the project are almost entirely associated with fuel gas usage by the gas turbine generators and are proportional to the rate of gas production.

Prospective Resources

D&M has also certified gross best estimate risked prospective resources of 62.0 Bcm (2.2 Tcf) of gas and 33.4 MMbbls of liquids in the Karish and Tanin leases and Block 12. A breakdown of these prospective resources by prospect is provided in the table below. The PoS of these prospective resources ranges from approximately 15 to 79%, with the primary targets having a PoS range of 70% to 79%. Exploration of prospects with a lower PoS, including targets in the D Sand, can be achieved without a dedicated exploration well.

The Israel Ministry of Energy has approved an extension of licences 12, 21, 23, 31 until 31 October 2021, by which time Energean is required to take a drill-or-drop decision on each of the licences. Block 22 has been relinquished. Energean is progressing well planning and design operations for potential drilling of the prospects on Block 12.

A commercial discovery in Block 12 would be prioritised ahead of the Tanin development. Capital expenditure associated with the tie-back of Block 12 to the Energean Power FPSO is expected to be significantly lower than the capital expenditure associated with the development of the Tanin structures.

Revised Gross (Energean 70%) Best Estimate Risked Prospective Resources

 
 Block          Prospect           Liquids    Gas    Gas     Total Oil 
                                    MMbbls    Bcf     Bcm    Equivalent 
                                                             MMboe [5] 
                Karish Main 
 Karish          Central            17.3      158    4.5       46.0 
               -----------------  --------  ------  -----  ------------ 
 Karish         Lacnesis             1.2      30     0.8        6.6 
               -----------------  --------  ------  -----  ------------ 
                Karish Main 
 Karish          A                   1.9      53     1.5       11.5 
               -----------------  --------  ------  -----  ------------ 
 Karish         Tortonian-1          1.9      48     1.3       10.5 
               -----------------  --------  ------  -----  ------------ 
 Block 12       Hera                 1.5      249    7.0       46.6 
               -----------------  --------  ------  -----  ------------ 
 Block 12       Hera - D Sand        0.3      51     1.5        9.6 
               -----------------  --------  ------  -----  ------------ 
 Block 12       Zeus                 1.9      315    8.9       59.0 
               -----------------  --------  ------  -----  ------------ 
 Block 12       Zeus - D Sand        0.4      71     2.0       13.3 
               -----------------  --------  ------  -----  ------------ 
 Block 12       Athena               1.5      253    7.2       47.5 
               -----------------  --------  ------  -----  ------------ 
 Block 12       Athena - D Sand      0.5      77     2.2       14.4 
               -----------------  --------  ------  -----  ------------ 
 Block 12       Apollo               0.5      91     2.6       17.1 
               -----------------  --------  ------  -----  ------------ 
 Block 12       Apollo - D Sand      0.1      15     0.4        2.8 
               -----------------  --------  ------  -----  ------------ 
 Block 12       Hestia               0.1      22     0.6        4.1 
               -----------------  --------  ------  -----  ------------ 
 Block 12       Hestia - D Sand      0.1      12     0.3        2.3 
               -----------------  --------  ------  -----  ------------ 
 Tanin/Block 
  12            Tanin F              0.9      160    4.5       30.0 
               -----------------  --------  ------  -----  ------------ 
 Tanin/Block    Tanin F - D 
  12             Sand                0.5      83     2.3       15.5 
               -----------------  --------  ------  -----  ------------ 
 Tanin/Block 
  12            Tanin G              0.5      79     2.2       14.7 
               -----------------  --------  ------  -----  ------------ 
 Tanin/Block    Tanin G - D 
  12             Sand                0.3      45     1.3        8.5 
               -----------------  --------  ------  -----  ------------ 
 Tanin          Tanin D              0.1      17     0.5        3.1 
               -----------------  --------  ------  -----  ------------ 
                Tanin D - D 
 Tanin           Sand                0.1      15     0.4        2.8 
               -----------------  --------  ------  -----  ------------ 
 Tanin          Tanin E              1.5      251    7.1       47.1 
               -----------------  --------  ------  -----  ------------ 
                Tanin E - D 
 Tanin           Sand                0.6      95     2.7       17.9 
               -----------------  --------  ------  -----  ------------ 
 Total                              33.4     2,189   62.0      431.1 
                                  --------  ------  -----  ------------ 
 

Enquiries

 
 Investors and Analysts 
 Kate Sloan, Head of IR &    Tel: +44 (0)7917 608 645 
  ECM 
 
  Media 
 
   Sotiris Chiotakis                                                      Tel: +30 210 8174 242 

Inside Information

Some of the information contained within this announcement is considered by Energean to constitute inside information, as defined under the EU Market Abuse Regulation, EU No.596/2014 ("MAR"). By the publication of this Announcement via a Regulatory Information Service, this inside information is now considered to be in the public domain. The person responsible for arranging for the release of this announcement on behalf of Energean is Russell Poynter, Company Secretary.

About Energean plc

Energean is a London Premium Listed FTSE 250 and Tel Aviv 35 Listed gas-focused E&P company with operations offshore Israel, Greece and the Adriatic. In August 2017 the Company received Israeli Governmental approval for the FDP for its flagship Karish-Tanin gas development project, where it intends to use the only FPSO in the Eastern Mediterranean to produce first gas in 2021. Energean has already signed firm contracts for 7.0 Bcm/yr of gas sales into the Israeli domestic market. Future gas sales agreements will focus on both the growing Israeli domestic market and key export markets.

Energean has nine exploration licences offshore Israel, and a 25-year exploitation licence for the Katakolo offshore block in Western Greece and additional exploration potential in its other licences in Western Greece and Montenegro.

On 4 July 2019, Energean announced the conditional acquisition of Edison E&P for $750 million plus $100 million of contingent consideration. On 23 December 2019, Energean announced the exclusion of the Algerian assets from the transaction. On 29 June 2020, Energean announced the exclusion of the Norwegian subsidiary from the transaction and a revised enterprise value (as at the locked-box date of the transaction, 1 January 2019) of $284 million. The acquisition of Edison E&P, exclusive of the Algerian assets and Norwegian subsidiary, is expected to complete later in 2020.

www.energean.com

[1] Gas reserves converted from Bcf to MMboe using a conversion factor of 5.505

[2] Refer to note 1

[3] Refer to note 1

[4] Refer to note 1

[5] Refer to note 1

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

MSCUKRBRRKUARAA

(END) Dow Jones Newswires

November 10, 2020 02:00 ET (07:00 GMT)

1 Year Energean Chart

1 Year Energean Chart

1 Month Energean Chart

1 Month Energean Chart

Your Recent History

Delayed Upgrade Clock