ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

KDNC Cadence Minerals Plc

3.55
0.00 (0.00%)
24 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Cadence Minerals Plc LSE:KDNC London Ordinary Share GB00BJP0B151 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 3.55 3.40 3.70 3.55 3.50 3.55 847,906 15:01:06
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Phono Recrds,audio Tape,disk 0 -5.5M -0.0304 -1.17 6.42M

Cadence Minerals PLC Update - Bacanora Lithium (2097B)

05/06/2019 9:06am

UK Regulatory


Cadence Minerals (LSE:KDNC)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Cadence Minerals Charts.

TIDMKDNC

RNS Number : 2097B

Cadence Minerals PLC

05 June 2019

Cadence Minerals Plc

("Cadence Minerals", "Cadence" or "the Company")

Bacanora Lithium (BCN) Feasibility Study Estimates EUR428 million NPV and 27.4% IRR for Zinnwald Lithium Project.

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note the announcement today by Bacanora Lithium (AIM:BCN) ("Bacanora") regarding the results of the NI 43-101 Feasibility Study ('FS') for the Zinnwald Lithium Project in Germany ('Zinnwald' or 'the Project') which confirm the positive economics and favourable operating costs for the production of 5,112 tonnes per annum ('tpa') (7,285 tpa LCE) of battery grade Lithium Fluoride ('LiF'), a high value, downstream product used in the manufacture of lithium battery electrolytes for the European electric vehicle industry. With a long life of project of 30 years, the FS estimates a pre-tax project Net Present Value ('NPV') of EUR428 million (8% discount rate); an Internal Rate of Return ('IRR') of 27.4%; favourable Life of Mine ('LOM') operating costs and a 46% EBITDA operating profit margin.

Bacanora is a lithium exploration and development company. Cadence holds approximately 1.7% of Bacanora's equity and 30% of Mexalit and Megalit joint venture companies. Mexalit is the owner of the El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 mineral concessions, which forms part of the 20-year mine plan of the Sonora Lithium Project in Northern Mexico.

Announcement Highlights:

Confirmed strong economic potential

   --      Estimated Project pre-tax IRR of 27.4%; NPV of EUR428 million (8% discount rate) 

-- Estimated Project post-tax IRR of 21.5%, NPV of EUR270 million with a project payback of 6.1 years

-- Average LOM annual earnings before interest, taxes, depreciation and amortisation ('EBITDA') estimated

at EUR58.5 million per annum

-- Long life project with the 30 year FS mine plan equating to less than 50% of the current identified

mineral   resources 

-- Base case 30 years revenue and EBITDA estimated at EUR3.86 billion and EUR1.75 billion respectively

Zinnwald: a significant lithium deposit, strategically positioned in Germany's industrial heartland

-- Total Mineral Reserve (Proven and Probable) estimate of 31.20 million tonnes ('Mt') of ore at a grade of 3,004 ppm containing 94 thousand tonnes ('kt') of contained lithium ('Li')

-- Demonstrated Mineral Resource (Measured and Indicated) estimate of 35.51 Mt of ore at a lithium grade of 3,519 ppm, containing 125 kt of Li

-- Deutsche Lithium also owns the exploration licences for the lithium deposits of the claims "Falkenhain" and "Altenberg DL" which have the potential to significantly increase Zinnwald's resource base and Project life

   --      Conventional flow sheet uses established sulphate route processing technology 
   --      Integrated plant designed to process approximately 570,000 tpa of ore (LOM average) 

-- Capital cost estimate of EUR159 million includes mining, processing plant, infrastructure, tailings

management, general administration costs as well as the requisite contingencies

-- FS includes sale of 32,000 tpa of by-product potassium sulphate ('SOP', 'K2SO4') to the European fertiliser industry

Next Steps: advance Zinnwald towards production to satisfy expected continued growth in demand for lithium driven by growing sectors such as electric vehicles and energy storage

-- Subject to Board approvals and other key milestone events, project detailed design is expected to commence in H1 2020

The full release can be found at: https://www.londonstockexchange.com/exchange/news/market-news/market-news-detail/BCN/14098768.html

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

- Ends -

 
For further information: Cadence Minerals plc         +44 (0) 207 440 0647 
  Andrew Suckling 
  Kiran Morzaria 
 
  WH Ireland Limited (NOMAD 
   & Broker)                   +44 (0) 207 220 1666 
  James Joyce 
  James Sinclair-Ford 
 
  Novum Securities Limited 
   (Joint Broker)              +44 (0) 207 399 9400 
  Jon Belliss 
 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identi ed by their use of terms and phrases such as "believe" "could" "should" "envisage" "estimate" "intend" "may" "plan" "will" or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements re ect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

END

UPDGIGDLXGGBGCU

(END) Dow Jones Newswires

June 05, 2019 04:06 ET (08:06 GMT)

1 Year Cadence Minerals Chart

1 Year Cadence Minerals Chart

1 Month Cadence Minerals Chart

1 Month Cadence Minerals Chart

Your Recent History

Delayed Upgrade Clock