We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Ascent Resources Plc | LSE:AST | London | Ordinary Share | GB00BJVH7905 | ORD 0.5P |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.03 | 1.29% | 2.35 | 2.30 | 2.40 | 2.35 | 2.25 | 2.25 | 76,857 | 08:00:17 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Crude Petroleum & Natural Gs | 581k | -41.89M | -0.1004 | -0.23 | 9.8M |
Date | Subject | Author | Discuss |
---|---|---|---|
12/6/2019 19:14 | The thing is we are not fracking how many times do they have to be told even arso confirmed that it's not high impact hydraulic fracturing. We are just stimulating... | jayrh | |
12/6/2019 18:44 | OFFICIAL "Ljubljana, June 12, 2019 - The Ministry of the Environment and Spatial Planning (MOP) rejected the appeal of Geoenergo doo Lendava and confirmed the decision of the Environmental Agency of the Republic of Slovenia (ARSO), by which it decided that the intended operation should be production of minerals in the area of Č The MESP has correctly confirmed the position of the ARSO (first instance body) that the matter in question is an intervention that could have a significant impact on the environment, which makes it necessary to carry out an environmental impact assessment and, before possible intervention, obtain an OVS. In addition to the submitted expert opinions, the location of the intervention, the distance of the intended interventions from the individual watercourses, and taking into account that the groundwater, groundwater and agricultural land in the area do not have good regeneration capacity, taking into account the principle of prudence, agreed with the position of the ARSO, that it is an operation which requires an environmental impact assessment and the acquisition of an OVS. The MESP has confirmed the findings of the ARSO that the drainage radius will increase and will be carried out at other depths, such as the previous hydraulic breakage, and the hydraulically broken method will be altered, and that this is a procedure that results in changes in the operation devices and for work or interventions that alter the physical reality of the site." | chinese investor | |
12/6/2019 17:22 | We are looking at 0.2p tomorrow. | chinese investor | |
12/6/2019 16:46 | "The Ministry of the Environment and Spatial Planning rejected the appeal of Geoenergo from Lendava and confirmed the decision of the Environmental Agency of the Republic of Slovenia (Arso), which decided that an environmental impact assessment should be carried out for the planned pumping of gas by hydraulic fracturing in Petišovo polje and to obtain environmental protection consensus. The Ministry has correctly confirmed Arso's position that this is an interference that could have a significant impact on the environment, which makes it necessary to carry out an environmental impact assessment and obtain an environmental consent before possible interventions, the Ministry explained. When deciding, the expert opinions submitted, the location of the intervention, the distance of the intended intervention from the individual watercourses, and the fact that groundwater, groundwater and agricultural land in the area do not have good regeneration capacity, were taken into account. Taking into account the precautionary principle, the ministry agreed with Arso's view that it was an operation which requires an environmental impact assessment and the acquisition of an environmental consent. The ministry confirmed the findings of Arso that the drainage radius will increase and that it will be carried out at other depths, such as the previous hydraulic breakage, and the process of hydraulically broken will be somewhat modified. It is therefore an operation that results in changes in the operation of the device, and for work or interventions that alter the physical reality of the site. At the beginning of March, Arso decided that for the extraction of gas by hydraulic fracturing on Petišovsko polje, which is opposed by environmentalists, an environmental impact assessment should be carried out and an environmental consent should be obtained. "Undoubtedly it is an operation that will change the physical reality of the environment and it is not just a prolongation of operation without any physical changes," they said at Arso. In cooperation with Geoenerg in Petišovci, British Ascent Resources wants to acquire more gas, and the process of assessing environmental impacts and acquiring an environmental consensus could delay the realization of their plans. The partners have already obtained an environmental permit for a refinery for the cleaning of raw gas, but the actual installation of the facility could depend on the decision to pump gas. The production of hydrocarbons began in Petišovsko polje in 1943, with the greatest expansion in the 1980s, and then, with the decision to close the oil refinery, this activity began to diminish in Pomurje. In both procedures related to Ascent's pumping of gas at Petišovsko polje, then Minister Jure Leben ordered last year's internal control over the work of Ars. Supervision showed that there were pressures and threats in the proceedings, and that the principles of autonomy and independence of the body and the work of officials were violated. The case was taken by then director Arso Joško Knez ." | chinese investor | |
10/6/2019 12:28 | Well the 2 mill buyer is still building, I do expect an announcement this week, Production for May I am not really fussed about but seismic data is due this month and hopefully results in a higher payload underground in the shallows to exploit. | linesal2 | |
10/6/2019 07:04 | JohnCasey- Tick Tock... | linesal2 | |
07/6/2019 08:25 | The 2 mill buys keep coming- There is some knowledge out there! I bought more last week and may again today. | linesal2 | |
06/6/2019 18:14 | JohnCasey- Your source must have kept it to there-self as only six buys today- With that info I would have sold my house car and boat! Over the years I have found the only reliable Sauce is HP! | linesal2 | |
06/6/2019 07:07 | Sorry New head of ARSO. | linesal2 | |
06/6/2019 06:33 | Correction not minister but new head of ARSO who sign off the permits! | blueblood | |
05/6/2019 21:31 | New minister starts Job Tomorrow.06/06/2019 | linesal2 |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions