ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

ANGS Angus Energy Plc

0.425
0.00 (0.00%)
24 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Angus Energy Plc LSE:ANGS London Ordinary Share GB00BYWKC989 ORD GBP0.002
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.425 0.40 0.45 0.425 0.425 0.425 3,302,102 07:46:26
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Crude Petroleum & Natural Gs 3.14M -111.95M -0.0309 -0.14 15.21M

Angus Energy PLC OGA approvals received regarding Saltfleetby (2410V)

02/12/2019 7:00am

UK Regulatory


Angus Energy (LSE:ANGS)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Angus Energy Charts.

TIDMANGS

RNS Number : 2410V

Angus Energy PLC

02 December 2019

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF THE MARKET ABUSE REGULATION (EU No. 596/2014) ("MAR"). THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

2 December 2019 7 a.m.

Angus Energy Plc

("Angus Energy" or the "Company")

OGA approves transfer of Saltfleetby Licence and Operatorship

Angus Energy plc (AIM: ANGS) is pleased to announce that, further to its announcement of 19 June 2019, the Oil and Gas Authority has given its consent to the assignment of a 51% share in Saltfleetby Energy Limited's interest in the Saltfleetby Field (the "Field") blocks of PEDL005 to Angus Energy Weald Basin No 3 ("AWB"), a wholly owned subsidiary of the Company. That Authority has also given consent to the appointment of AWB as Exploration and Production Operator of the Field.

This is a great day for Angus and it enables the Company to disclose much of the hard work it has engaged in to reconnect this Field. Some of the achievements to date are:

-- National Grid plc ("NTS") have already begun detailed design work for the reconnection facilities at the Theddlethorpe Entry Point and aiming to keep to our timetable.

-- Angus has already identified most of the long lead items needed to compress and treat the gas to NTS pressure and specification and will make determination on pricing options in the coming weeks.

-- Angus have mapped the pathway of the additional stretch of pipeline needed to extend the existing connection to Theddlethorpe on to the Entry Point. All of this additional pipeline will run underneath NTS owned land.

-- We have engaged planning consultants to prepare Applications for Planning approval from North Lincolnshire County Council ("NLCC") for putting additional equipment on site and laying pipeline extensions.

-- We have engaged the services of Oilfield International to produce a Competent Persons Report ("CPR") on the Field. This we hope to have available during the early part of Q1 2020.

-- We have prepared an Abandonment Plan for two of the eight wells which, subject to regulatory approvals, we hope to execute within a month to six weeks. This reduces the overall liability on the Field.

-- We have opened discussions with an oil major for a multi-year annual off-take arrangement. The Field's first full year's gross production we continue to expect to be between 17 million and 19 million therms based on last known and reported production rates of c. 50,750 therms per day in 2017 as adjusted for a steady twenty year decline curve.

There are still quite a few hoops to get through, most particularly OGA approval of our Field Development Plan (which will also remove the Abandonment Notice on the Field put in place as a holding measure following the change in ownership), EA, HSE and NLCC approval of changes to the site, assent of partners on this split Licence to the Licence transfer itself, and the everyday technical challenges themselves but, for the moment, the Company is forging ahead.

George Lucan, Managing Director, writes:

"This comes as fantastic news for the Company and opens up a pathway towards real production and cashflow without the exploration risk attendant on many other projects. This is gas right next door to one of the dozen or so entry points on the NTS system. This is gas producing on a steady and predictable decline curve for 20 years. This is gas to be pulled immediately from two wells which show the same or greater well head pressure than when they were shut in in 2017. Now we have to complete reconnection and start squeezing this gas into people's homes and dividends into shareholders pockets."

Technical Sign off

Andrew Hollis, the Technical Director of the Company, who has over 40 years of relevant experience in the oil and gas industry, has approved the information contained in this announcement. Mr Hollis is a Fellow of the Geological Society and member of the Society of Petroleum Engineers.

END.

Enquiries:

 
 Angus Energy Plc               www.angusenergy.co.uk 
 George Lucan                   Tel: +44 (0) 208 
                                 899 6380 
 
 
 Beaumont Cornish (Nomad)       www.beaumontcornish.com 
 James Biddle/ Roland Cornish   Tel: +44 (0) 207 
                                 628 3396 
 
 WH Ireland Limited (Broker) 
 Katy Mitchell/ Harry Ansell    Tel: +44 (0) 113 
                                 394 6600 
 
 Flagstaff PR/IR                angus@flagstaffcomms.com 
 Tim Thompson                   Tel: +44 (0) 207 
                                 129 1474 
 Fergus Mellon 
 

Notes

About Angus Energy plc. Angus Energy plc. is a UK AIM quoted independent onshore oil and gas production and development company focused on leveraging its expertise to advance its portfolio of UK assets as well as acquire, manage and monetise select projects. Angus Energy majority owns and operates conventional oil production fields at Brockham (PL 235) and Lidsey (PL 241) and has a 25% interest in the Balcombe Licence (PEDL244) and a 12.5% interest in the PEDL143 Licence (A24 Prospect).

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

END

MSCTBBTTMBMMTML

(END) Dow Jones Newswires

December 02, 2019 02:00 ET (07:00 GMT)

1 Year Angus Energy Chart

1 Year Angus Energy Chart

1 Month Angus Energy Chart

1 Month Angus Energy Chart

Your Recent History

Delayed Upgrade Clock