ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

AAZ Anglo Asian Mining Plc

64.50
-0.10 (-0.15%)
Last Updated: 08:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Anglo Asian Mining Plc LSE:AAZ London Ordinary Share GB00B0C18177 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  -0.10 -0.15% 64.50 62.00 67.00 64.50 64.50 64.50 970 08:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Miscellaneous Metal Ores,nec 84.72M 3.66M 0.0320 20.16 73.69M

Anglo Asian Mining PLC Revised JORC Mineral Resources & Reserves (8548D)

02/11/2020 7:00am

UK Regulatory


Anglo Asian Mining (LSE:AAZ)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Anglo Asian Mining Charts.

TIDMAAZ

RNS Number : 8548D

Anglo Asian Mining PLC

02 November 2020

Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

02 November 2020

Anglo Asian Mining plc

Gedabek Open Pit and Gadir Underground Mine - Revised JORC Mineral Resources and Reserves

Ugur Open Pit - Remaining Mineable Material

New Mine Life of Eight Years

Anglo Asian Mining plc ("Anglo Asian" or the "Company"), the AIM listed gold, copper and silver producer, is pleased to announce updated Mineral Resources and Ore Reserves, estimated in accordance with the JORC (2012) code, for the Gedabek open pit and Gadir underground mine located at the Company's Gedabek licence area ("Gedabek") in Western Azerbaijan. The Mineral Resources and Ore Reserves estimates have been prepared by the independent company Mining Plus UK Limited ("Mining Plus") and are based on robust geological models, which benefit from information gathered during the mining of the deposits, recent geological work and exploration drilling. The Company also announces an update for its Ugur open pit Mine.

Summary

   --    Revised Mineral Resources for Gedabek open pit 

o Total Mineral Resources of 735,000 ounces of gold and 69,100 tonnes of copper

o Mineral Resources now include material contained in stockpiles

o Zinc Mineral Resources now also estimated to enable the technical implications of higher zinc grades at depth to be understood

   --    Revised Mineral Resources for Gadir Underground Mine 

o Total Mineral Resources of 267,000 ounces of gold and 2,183 tonnes of copper

   --    Ore Reserves for the Gedabek Open Pit and Gadir Underground Mine 

o Gedabek open pit of 284,000 ounces of gold and 26,000 tonnes of copper

o Gadir underground mine of 49,000 ounces of gold and 191 tonnes of copper

   --    Mine life for the Gedabek open pit of eight years 

o Mine life based on the current mining practices of the Gedabek open pit

o Optimisation of the mine plan being carried out to enable more efficient mining and maximise use of our processing capability

-- A residual mineral study of Ugur shows that, as expected, the mine is nearing depletion but exploration in the vicinity of, and below, the mine continues

o Copper mineralisation has been identified

Anglo Asian CEO, Reza Vaziri, said " I am delighted to announce these latest JORC estimates for the Gedabek open pit and Gadir underground mines. These show the economically mineable Ore Reserves remaining in the open pit mine amount to 284,000 ounces of gold and 26,000 tonnes of copper. The economically mineable Ore Reserves for the Gadir underground mine amount to 49,000 ounces of gold and 191 tonnes of copper.

"The mine life of the new model is a further eight years assuming the current mining rate from the open pit, however the Company is carrying out a study to see if part of this ore can also be mined more efficiently by underground mining. Our ongoing exploration programme targeting five new deposits is also expected to produce additional ore sources to further complement the production from the Gedabek open pit and the Gadir underground mines."

Anglo Asian Group Director of Geology & Mining, Stephen Westhead, said "These latest resources and reserves statements and the extensive geological and mining work supporting them provide the production platform to develop a long-term operational strategy. Gedabek ore production will be supplemented by mining of the Gadir underground reserve, stockpile inventory and potential new deposits. The ongoing underground development will provide the technical data to optimise the open pit and underground production profile to maximise cashflow. Exploration results from the rest of the Gedabek contract area are delivering "mineable" grades and there is a focus on drilling the areas of known mineralisation to assess continuity for resource estimation to further prolong mine life, within an extended Production Sharing Agreement."

Mine Life, Development and Exploration Upside

The current mine life of the Gedabek open pit, based on the mining schedule used for its Ore Reserves estimation, is now eight years. The mining schedule assumes a continuation of the current mining practices used in the Gedabek open pit. However, such a mining schedule, results in spare capacity of the current processing facilities which can be used to treat additional sources of ore. Ore production from the Gedabek Open pit will also be supplemented by stockpile material and ore mined from the Gadir underground mine to increase utilisation of the processing facilities.

The Company is also undertaking an assessment for the underground mining of part of the existing Gedabek Open Pit Mineral Resources and Ore Reserves. This is to determine whether underground mining of this ore will be more economic and better match the requirements of the processing facilities. Underground tunnelling is currently being developed from the south below the Gedabek open pit. This will soon link with the tunnel being developed from Gadir at the northern end of Gedabek. The continuous tunnelling will allow for the additional assessment of ore extraction from underground as well as the exploration of the deeper extensions of mineralisation. Only the upper level of mineralisation is currently contained within the new open pit Ore Reserves, and a study is now being carried out to look at the benefits of open pit versus underground mining and scheduling. The positive impact of underground extraction is likely to be the avoidance of significant waste rock removal required by the open pit extraction plan, thus improving the mining economics and potential for additional Mineral Resources and Ore Reserves.

Further exploration is planned of the extensive deeper mineralisation already identified below the current Gedabek Mineral Resources. The objective is to increase the size of the Mineral Resources with the aim to develop future additional underground Ore Reserves.

Furthermore, if any of the Company's exploration targets are developed into mines, ore from these sources can also be used to ensure processing plants are fully utilised, with the option of further expansion of the facilities.

Gedabek Open Pit JORC (2012) Mineral Resources and Ore Reserves - Summary

-- Gold and copper Mineral Resources (at a cut-off grade of 0.2 grammes per tonne of gold) as follows:

o Measured and Indicated: 551,000 ounces of gold, 33,400 tonnes of copper and 2,202,000 ounces of silver

o Total (including Inferred): 735,000 ounces of gold, 41,200 tonnes of copper and 2,457,000 ounces of silver

   --    Gold and copper Proven plus Probable Ore Reserves as follows: 

o 284,000 ounces of gold, 26,000 tonnes of copper and 1,754,000 ounces of silver

-- Additional Mineral Resource (gold grade below 0.2 grammes per tonne and copper grade above 0.3 per cent.) contains 27,900 tonnes of copper and 261,000 ounces of silver

Gedabek Open Pit - JORC (2012) Mineral Resources and Ore Reserves Statements at 30 June 2020

Anglo Asian, together with the mining and geological consulting group Mining Plus, prepared the Mineral Resources and Ore Reserves estimation of the Gedabek deposit. The detailed Mineral Resources and Ore Reserves estimation parameters per Table 1 of the JORC code can be accessed at http://www.rns-pdf.londonstockexchange.com/rns/8548D_1-2020-11-1.pdf . A glossary of terminology related to the Mineral Resources and Ore Reserves estimate and other information is set out in the appendix below. Full technical Mineral Resources and Ore Reserves reports by Mining Plus is available on the Group's web-site at:

https://wp-angloasianmining-2020.s3.eu-west-2.amazonaws.com/media/2020/10/30134936/AAZ-Gedabek_Mineral-Resource_Estimate_2020_JORC.pdf and;

https://wp-angloasianmining-2020.s3.eu-west-2.amazonaws.com/media/2020/10/30134939/AAZ-Gedabek_Reserves_Report_r3.pdf

The Mineral Resources and Ore Reserves are prepared in accordance with JORC Code (2012), which is the current edition of the JORC Code. After a transition period, the 2012 edition came into mandatory operation from 1 December 2013. The Mineral Resources and Ore Reserves stated below are in-situ.

Gedabek Open Pit - Mineral Resources

 
                       MINERAL RESOURCES (cut-off grade of 0.2 g/t gold) 
                                  In-situ grades                      Contained Metal 
              --------  ----------------------------------  ----------------------------------- 
               Tonnage    Gold    Copper   Silver    Zinc     Gold    Copper   Silver     Zinc 
 Mineral                  grade    grade    grade    grade 
  Resources      (Mt)     (g/t)     (%)     (g/t)     (%)     (koz)    (kt)     (koz)     (kt) 
              --------  -------  -------  -------  -------  -------  -------  --------  ------- 
 Measured       15.8      0.66     0.12     2.58     0.24     335      19.0     1,311     37.9 
              --------  -------  -------  -------  -------  -------  -------  --------  ------- 
 Indicated      12.0      0.56     0.12     2.31     0.16     216      14.4      891      19.2 
              --------  -------  -------  -------  -------  -------  -------  --------  ------- 
 Measured 
  and 
  Indicated      27.8      0.62     0.12     2.46     0.21     551      33.4     2,202     57.1 
------------  --------  -------  -------  -------  -------  -------  -------  --------  ------- 
 Inferred       13.0      0.44     0.06     0.61     0.15     184      7.8       255      19.5 
              --------  -------  -------  -------  -------  -------  -------  --------  ------- 
 TOTAL          40.8      0.56     0.10     1.87     0.19     735      41.2     2,457     76.6 
------------  --------  -------  -------  -------  -------  -------  -------  --------  ------- 
 

Some of the totals above may not add due to rounding

 
                             ADDITIONAL MINERAL RESOURCES (Additional to Gold Mineral Resource) 
                                         (gold cut-off < 0.2 g/t and copper > 0.3 % 
                    Gold               Copper             Silver              Zinc                 Contained Metal 
             ------------------  -----------------  -----------------  -----------------  --------------------------------- 
              Tonnage     Gold    Tonnage   Copper   Tonnage   Silver   Tonnage    Zinc    Gold    Copper   Silver    Zinc 
                          grade              grade              grade              grade 
                (Mt)      (g/t)     (Mt)      (%)      (Mt)     (g/t)     (Mt)      (%)    (koz)    (kt)     (koz)    (kt) 
             ---------  -------  --------  -------  --------  -------  --------  -------  ------  -------  -------  ------- 
 Measured        -         -       2.15      0.43     0.08      16.4     1.86      0.53      -      9.2       42      9.9 
             ---------  -------  --------  -------  --------  -------  --------  -------  ------  -------  -------  ------- 
 Indicated       -         -       2.13      0.34     0.28      13.9     2.03      0.51      -      7.2      125      10.4 
             ---------  -------  --------  -------  --------  -------  --------  -------  ------  -------  -------  ------- 
 Measured 
  and 
  Indicated       -         -       4.28      0.39     0.36      14.5     3.89      0.52      -      16.5     167      20.2 
-----------  ---------  -------  --------  -------  --------  -------  --------  -------  ------  -------  -------  ------- 
 Inferred        -         -       2.85      0.40     0.15      19.4     7.04      0.54      -      11.4      94      38.0 
             ---------  -------  --------  -------  --------  -------  --------  -------  ------  -------  -------  ------- 
 TOTAL           -         -       7.10      0.39     0.51      15.9     10.9      0.50      -      27.9     261      58.2 
-----------  ---------  -------  --------  -------  --------  -------  --------  -------  ------  -------  -------  ------- 
 

Some of the totals above may not add due to rounding

Mineral Resource classifications are based on the gold estimation confidence. Copper, silver, and zinc are reported within these classifications.

 
              Stockpiles included in Measured Resources and Ore Reserves 
 Measured Mineral                      Stockpile grades           Contained metal 
  Resources 
                        --------  -------------------------  ------------------------- 
                         Tonnage    Gold    Copper   Silver    Gold    Copper   Silver 
                                    grade    grade    grade 
                           (Mt)     (g/t)     (%)     (g/t)    (koz)    (kt)     (koz) 
                        --------  -------  -------  -------  -------  -------  ------- 
 Agitation leach          0.02      1.87     0.24    17.79      1        0        10 
                        --------  -------  -------  -------  -------  -------  ------- 
 Flotation                0.14      0.90     0.53    11.71      4       0.7       53 
                        --------  -------  -------  -------  -------  -------  ------- 
 Heap leach (crushed)     0.06      0.81     0.11     7.71      2       0.1       16 
                        --------  -------  -------  -------  -------  -------  ------- 
 Heap leach (ROM)         0.61      0.73     0.21    10.23      14      4.3      201 
                        --------  -------  -------  -------  -------  -------  ------- 
 Stockpile Mineral 
  Resources               0.83      0.79     0.26    10.44      21      2.2      279 
----------------------  --------  -------  -------  -------  -------  -------  ------- 
 

Gedabek Open Pit - Ore Reserves

 
                                        In-situ grades            Contained metal 
                         Tonnage    Gold    Copper   Silver    Gold    Copper   Silver 
                                    grade    grade    grade 
                           (Mt)     (g/t)     (%)     (g/t)    (koz)    (kt)     (koz) 
                                  -------  -------  -------  -------  -------  ------- 
 Proven                   8.07      0.72     0.19     3.48     187      15.3     902 
                        --------  -------  -------  -------  -------  -------  ------- 
 Probable                 3.65      0.64     0.23     4.87      75      8.5      572 
                        --------  -------  -------  -------  -------  -------  ------- 
 In situ-ore reserves     11.72     0.70     0.20     3.91     263       24     1,474 
----------------------  --------  -------  -------  -------  -------  -------  ------- 
                                       Stockpile grades 
                        --------  -------------------------  -------  -------  ------- 
 Agitation leach          0.02      1.87     0.24    17.79      1        0        10 
                        --------  -------  -------  -------  -------  -------  ------- 
 Flotation                0.14      0.90     0.53    11.71      4       0.7       53 
                        --------  -------  -------  -------  -------  -------  ------- 
 Heap leach (crushed)     0.06      0.81     0.11     7.71      2       0.1       16 
                        --------  -------  -------  -------  -------  -------  ------- 
 Heap leach (ROM)         0.61      0.73     0.21    10.23      14      4.3      201 
                        --------  -------  -------  -------  -------  -------  ------- 
 Stockpile ore 
  reserves                0.83      0.79     0.26    10.44      21      2.2      279 
----------------------  --------  -------  -------  -------  -------  -------  ------- 
 TOTAL ORE RESERVE        12.55     0.70     0.21     4.34     284      26.0    1,754 
----------------------  --------  -------  -------  -------  -------  -------  ------- 
 

Proved and Probable Ore Reserves estimate is based on that portion of the Measured and Indicated Mineral Resources of the deposit within the scheduled mine designs that may be economically extracted, considering all "Modifying Factors" in accordance with the JORC (2012) Code.

Gadir Underground Mine JORC (2012) Mineral Resources and Ore Reserves - Summary

-- Gold and copper Mineral Resources (at a cut-off grade of 0.5 grammes per tonne of gold) as follows:

o Measured and Indicated: 211,000 ounces of gold, 2,024 tonnes of copper and 326,000 ounces of silver

o Total (including Inferred): 267,000 ounces of gold, 2,183 tonnes of copper and 328,000 ounces of silver

   --    Gold and copper Proven plus Probable Ore Reserves as follows: 

o 49,000 ounces of gold, 191 tonnes of copper and 51,000 ounces of silver

Gadir Underground Mine - JORC (2012) Mineral Resources and Ore Reserves Statements at 30 June 2020

Anglo Asian, together with the mining and geological consulting group Mining Plus, prepared the Mineral Resources and Ore Reserves estimation of the Gadir deposit. The detailed Mineral Resources and Ore Reserve estimation parameters per Table 1 of the JORC code can be accessed at http://www.rns-pdf.londonstockexchange.com/rns/8548D_2-2020-11-1.pdf . A glossary of terminology related to the Mineral Resources and Ore Reserves estimate and other information is set out in the appendix below. Full technical Mineral Resources and Ore Reserves reports by Mining Plus is available on the Group's web-site at:

https://wp-angloasianmining-2020.s3.eu-west-2.amazonaws.com/media/2020/10/30134949/AAZ-Gadir_Mineral-Resource_Estimate_2020_JORC.pdf and;

https://wp-angloasianmining-2020.s3.eu-west-2.amazonaws.com/media/2020/10/30134926/AAZ-Gadir_Reserves_Report_v5.pdf

The Mineral Resources and Ore Reserves are prepared in accordance with JORC Code (2012), which is the current edition of the JORC Code. After a transition period, the 2012 edition came into mandatory operation from 1 December 2013. The Mineral Resources and Ore Reserves stated below are in-situ.

Gadir Underground Mine - Mineral Resources

 
                        MINERAL RESOURCES (cut-off grade of 0.5 g/t gold) 
                                  In-situ grades                       Contained Metal 
              --------  ----------------------------------  ------------------------------------- 
               Tonnage    Gold    Copper   Silver    Zinc     Gold    Copper    Silver     Zinc 
 Mineral                  grade    grade    grade    grade 
  Resources      (kt)     (g/t)     (%)     (g/t)     (%)     (koz)     (t)      (koz)      (t) 
              --------  -------  -------  -------  -------  -------  --------  -------  --------- 
 Measured       2,035     2.47     0.09     4.69     0.61     162      1,831     307      12,407 
              --------  -------  -------  -------  -------  -------  --------  -------  --------- 
 Indicated       966      1.59     0.02     0.63     0.33      49       193       20      3,188 
              --------  -------  -------  -------  -------  -------  --------  -------  --------- 
 Measured 
  and 
  Indicated      3,001     2.19     0.07     3.40     0.52     211      2,024     326      15,595 
------------  --------  -------  -------  -------  -------  -------  --------  -------  --------- 
 Inferred       1,594     1.10     0.01     0.03     0.10      56       159       2       1,594 
              --------  -------  -------  -------  -------  -------  --------  -------  --------- 
 TOTAL          4,595     1.81     0.05     2.22     0.37     267      2,183     328      17,189 
------------  --------  -------  -------  -------  -------  -------  --------  -------  --------- 
 

Some of the totals above may not add due to rounding

Gadir Underground Mine - Ore Reserves

 
                                     In-situ grades            Contained metal 
                      Tonnage    Gold    Copper   Silver    Gold    Copper   Silver 
                                 grade    grade    grade 
                        (Mt)     (g/t)     (%)     (g/t)    (koz)     (t)     (koz) 
                               -------  -------  -------  -------  -------  ------- 
 Proven                0.47      2.32     0.04     3.38      35      173       51 
                     --------  -------  -------  -------  -------  -------  ------- 
 Probable              0.19      2.20     0.01     0.74      14       18       5 
                     --------  -------  -------  -------  -------  -------  ------- 
 TOTAL ORE RESERVE     0.66      2.28     0.03     2.60      49      191       56 
-------------------  --------  -------  -------  -------  -------  -------  ------- 
 

Proved and Probable Ore Reserves estimate is based on that portion of the Measured and Indicated Mineral Resources of the deposit within the scheduled mine designs that may be economically extracted, considering all "Modifying Factors" in accordance with the JORC (2012) Code.

Ugur Open Pit

A statement complying with JORC has not been prepared as the mine is nearing depletion. Mining Plus have carried out a residual material study to estimate the remaining mineable mineralisation. The amount of remaining mineable material is given in the table below. Exploration continues in the vicinity of the Ugur mine and copper has been identified both under and adjacent to the Ugur open pit.

 
      MINEABLE MATERIAL (gold cut-off grade of > = 0.3 g/t 
                Tonnage     In-situ grades      Contained metal 
                   Mt 
               ---------  ------------------  ------------------ 
                            Gold     Silver     Gold     Silver 
                            Grade     Grade     (koz)     (koz) 
                            (g/t)     (g/t) 
               ---------  --------  --------  --------  -------- 
 Mineable 
  Material        0.28       0.8       3.59      7.15      32.3 
               ---------  --------  --------  --------  -------- 
      MINEABLE MATERIAL (gold cut-off grade of > = 0.2 g/t 
 Mineable 
  Material        0.38       0.65      3.33      7.94      40.7 
               ---------  --------  --------  --------  -------- 
 

Competent Person Statement

The information in the announcement that relates to Mineral Resources is based on information compiled by Mr Julian Aldridge, who is a full-time employee of Mining Plus UK Ltd, and is a Fellow of The Geological Society of London, a Chartered Geologist, and a Member of The Institute of Materials, Minerals and Mining.

Julian Aldridge has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Julian Aldridge consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

Julian Aldridge has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking, to qualify as a "competent person" as defined by the AIM rules. Julian Aldridge has reviewed the Mineral Resources included in this announcement.

The information in the announcement that relates to Ore Reserves for the Gedabek Open Pit is based on information compiled by Mr John Battista, who is a full-time employee of Mining Plus UK Ltd, and is a Member and Chartered Professional (Mining) of the Australasian Institute of Mining and Metallurgy (MAusIMM CP(Min)).

John Battista has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. John Battista consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

John Battista has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking, to qualify as a "competent person" as defined by the AIM rules. John Battista has reviewed the Ore Reserves included in this announcement.

The information in the announcement that relates to Ore Reserves for the Gadir Underground Mine is based on information compiled by Mr Aidar Kairbekov, who is a full-time employee of Mining Plus UK Ltd, and is a Professional Member of the Southern African Institute of Mining and Metallurgy (SAIMM).

Aidar Kairbekov has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Aidar Kairbekov consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

Aidar Kairbekov has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking, to qualify as a "competent person" as defined by the AIM rules. Aidar Kairbekov has reviewed the Ore Reserves included in this announcement.

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

**S**

For further information please visit www.angloasianmining.com or contact:

 
 Reza Vaziri        Anglo Asian Mining plc          Tel: +994 12 596 3350 
 Bill Morgan        Anglo Asian Mining plc          Tel: +994 502 910 400 
                   ------------------------------  ---------------------- 
 Stephen Westhead   Anglo Asian Mining plc          Tel: +994 502 916 894 
                   ------------------------------  ---------------------- 
 Ewan Leggat        SP Angel Corporate Finance      Tel: +44 (0) 20 3470 
                     LLP                             0470 
                     Nominated Adviser and Broker 
                   ------------------------------  ---------------------- 
 Soltan Tagiev      SP Angel Corporate Finance      Tel + 44 (0) 20 3470 
                     LLP                             0470 
                   ------------------------------  ---------------------- 
 Megan Ray          Blytheweigh Financial           Tel: +44 (0) 20 7138 
                                                     3224 
                   ------------------------------  ---------------------- 
 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 square kilometre portfolio, assembled from analysis of historic Soviet geological data and held under a Production Sharing Agreement modelled on the Azeri oil industry.

The Company's main operating location is the Gedabek contract area ("Gedabek") which is a 300 square kilometre area in the Lesser Caucasus mountains in western Azerbaijan. The Company developed Azerbaijan's first operating gold/copper/silver mine at Gedabek which commenced gold production in May 2009. Mining at Gedabek was initially from its main open pit which is an open cast mine with a series of interconnected pits. The Company also operates the high grade Gadir underground mine which is co-located at the Gedabek site. The Company has a second underground mine, Gosha, which is 50 kilometres from Gedabek. Ore mined at Gosha is processed at Anglo Asian's Gedabek plant.

The Company produced 81,399 gold equivalent ounces ("GEOs") for the year ended 31 December 2019. Gedabek is a polymetallic ore deposit that has gold together with significant concentrations of copper in the main open pit mine, and an oxide gold-rich zone at Ugur. The Company therefore employs a series of flexible processing routes to optimise metal recoveries and efficiencies. The Company produces gold doré through agitation and heap leaching operations, copper concentrate from its Sulphidisation, Acidification, Recycling, and Thickening (SART) plant and also a copper and precious metal concentrate from its flotation plant.

The Company has a production target for the year to 31 December 2020 of 65,000 ounces to 67,000 ounces of gold and 2,200 tonnes to 2,400 tonnes of copper which is currently being revised. This total production target expressed as gold equivalent ounces ("GEOs") at budgeted prices is between 75,000 GEOs and 80,000 GEOS.

Anglo Asian is also actively seeking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for properties in other jurisdictions in order to fulfil its expansion ambitions and become a mid-tier gold and copper metal production company. It has recently announced that it will enter into a joint venture with Conroy Gold and Natural resources PLC to explore and develop various gold properties in The Republic of Ireland and Northern Ireland.

GLOSSARY OF TERMS AND ABBREVIATIONS

The following definitions are extracted from the JORC Code, 2012 Edition

 
 Cut-off grade          The lowest grade, or quality, of mineralised 
                         material that qualifies as economically 
                         mineable and available in a given deposit. 
                         May be defined on the basis of economic 
                         evaluation, or on physical or chemical 
                         attributes that define an acceptable 
                         product specification. 
 Indicated Mineral      An 'Indicated Mineral Resource' is 
  Resource               that part of a Mineral Resource for 
                         which quantity, grade (or quality), 
                         densities, shape and physical characteristics 
                         are estimated with sufficient confidence 
                         to allow the application of Modifying 
                         Factors in sufficient detail to support 
                         mine planning and evaluation of the 
                         economic viability of the deposit. 
                         Geological evidence is derived from 
                         adequately detailed and reliable exploration, 
                         sampling and testing gathered through 
                         appropriate techniques from locations 
                         such as outcrops, trenches, pits, workings 
                         and drill holes, and is sufficient 
                         to assume geological and grade (or 
                         quality) continuity between points 
                         of observation where data and samples 
                         are gathered. An Indicated Mineral 
                         Resource has a lower level of confidence 
                         than that applying to a Measured Mineral 
                         Resource and may only be converted 
                         to a Probable Ore Reserve. 
                       ------------------------------------------------- 
 Inferred Mineral       An 'Inferred Mineral Resource' is that 
  Resource               part of a Mineral Resource for which 
                         quantity and grade (or quality) are 
                         estimated on the basis of limited geological 
                         evidence and sampling. Geological evidence 
                         is sufficient to imply but not verify 
                         geological and grade (or quality) continuity. 
                         It is based on exploration, sampling 
                         and testing information gathered through 
                         appropriate techniques from locations 
                         such as outcrops, trenches, pits, workings 
                         and drill holes. An Inferred Mineral 
                         Resource has a lower level of confidence 
                         than that applying to an Indicated 
                         Mineral Resource and must not be converted 
                         to an Ore Reserve. It is reasonably 
                         expected that the majority of Inferred 
                         Mineral Resources could be upgraded 
                         to Indicated Mineral Resources with 
                         continued exploration. 
                       ------------------------------------------------- 
 JORC                   JORC stands for Australasian Joint 
                         Ore Reserves Committee (JORC). The 
                         Code for Reporting of Exploration Results, 
                         Mineral Resources and Ore Reserves 
                         (the JORC Code) is widely accepted 
                         as the definitive standard for the 
                         reporting of a company's resources 
                         and reserves. The latest JORC Code 
                         is the 2012 Edition. 
                       ------------------------------------------------- 
 Measured Mineral       A 'Measured Mineral Resource' is that 
  Resource               part of a Mineral Resource for which 
                         quantity, grade (or quality), densities, 
                         shape, and physical characteristics 
                         are estimated with confidence sufficient 
                         to allow the application of Modifying 
                         Factors to support detailed mine planning 
                         and final evaluation of the economic 
                         viability of the deposit. Geological 
                         evidence is derived from detailed and 
                         reliable exploration, sampling and 
                         testing gathered through appropriate 
                         techniques from locations such as outcrops, 
                         trenches, pits, workings and drill 
                         holes, and is sufficient to confirm 
                         geological and grade (or quality) continuity 
                         between points of observation where 
                         data and samples are gathered. A Measured 
                         Mineral Resource has a higher level 
                         of confidence than that applying to 
                         either an Indicated Mineral Resource 
                         or an Inferred Mineral Resource. It 
                         may be converted to a Proved Ore Reserve 
                         or under certain circumstances to a 
                         Probable Ore Reserve 
                       ------------------------------------------------- 
 Mineral Reserves       An 'Ore Reserve' is the economically 
  or Ore Reserves        mineable part of a Measured and/or 
                         Indicated Mineral Resource. It includes 
                         diluting materials and allowances for 
                         losses, which may occur when the material 
                         is mined or extracted and is defined 
                         by studies at Pre-Feasibility or Feasibility 
                         level as appropriate that include application 
                         of Modifying Factors. Such studies 
                         demonstrate that, at the time of reporting, 
                         extraction could reasonably be justified. 
                       ------------------------------------------------- 
 Mineral Resource       A 'Mineral Resource' is a concentration 
                         or occurrence of solid material of 
                         economic interest in or on the Earth's 
                         crust in such form, grade (or quality), 
                         and quantity that there are reasonable 
                         prospects for eventual economic extraction. 
                         The location, quantity, grade (or quality), 
                         continuity and other geological characteristics 
                         of a Mineral Resource are known, estimated 
                         or interpreted from specific geological 
                         evidence and knowledge, including sampling. 
                         Mineral Resources are sub-divided, 
                         in order of increasing geological confidence, 
                         into Inferred, Indicated and Measured 
                         categories. 
                       ------------------------------------------------- 
 Modifying Factors      'Modifying Factors' are considerations 
                         used to convert Mineral Resources to 
                         Ore Reserves. These include, but are 
                         not restricted to, mining, processing, 
                         metallurgical, infrastructure, economic, 
                         marketing, legal, environmental, social 
                         and governmental factors. 
                       ------------------------------------------------- 
 Probable Ore Reserve   A 'Probable Ore Reserve' is the economically 
                         mineable part of an Indicated, and 
                         in some circumstances, a Measured Mineral 
                         Resource. The confidence in the Modifying 
                         Factors applying to a Probable Ore 
                         Reserve is lower than that applying 
                         to a Proved Ore Reserve. 
                       ------------------------------------------------- 
 Proved Ore Reserve     A 'Proved Ore Reserve' is the economically 
                         mineable part of a Measured Mineral 
                         Resource. A Proved Ore Reserve implies 
                         a high degree of confidence in the 
                         Modifying Factors. 
                       ------------------------------------------------- 
 
 
 Abbreviation   Definition of term 
-------------  -------------------- 
 Ag             Chemical symbol for 
                 silver 
               -------------------- 
 Au             Chemical symbol for 
                 gold 
               -------------------- 
 g/t            Gramme per tonne 
               -------------------- 
 M              Meters 
               -------------------- 
 Oz             Ounces 
               -------------------- 
 t              Tonnes 
               -------------------- 
 
, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

DRLBBBTTMTTMTTM

(END) Dow Jones Newswires

November 02, 2020 02:00 ET (07:00 GMT)

1 Year Anglo Asian Mining Chart

1 Year Anglo Asian Mining Chart

1 Month Anglo Asian Mining Chart

1 Month Anglo Asian Mining Chart

Your Recent History

Delayed Upgrade Clock