We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Anglo Asian Mining Plc | LSE:AAZ | London | Ordinary Share | GB00B0C18177 | ORD 1P |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
-0.40 | -0.62% | 64.60 | 62.00 | 67.00 | 64.50 | 64.50 | 64.50 | 30,501 | 16:35:04 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Miscellaneous Metal Ores,nec | 84.72M | 3.66M | 0.0320 | 20.16 | 73.69M |
Date | Subject | Author | Discuss |
---|---|---|---|
13/9/2017 17:40 | Nice rise today,good volume,keep it coming. | casabella2 | |
13/9/2017 17:04 | this may answer the 300 to 400 t per day query, taken from proactive The average daily gold production in the form of gold doré for the period from 1 to 10 September 2017 was 212 ounces, which is 116% higher than the average daily production for the previous eight months. This average daily production is expected to increase further as Ugur moves into full production. The company is processing the Ugur ore only by agitation leaching. The Ugur oxide-rich ores do not contain copper and therefore the tailings of the agitation leaching plant are not treated by flotation. As a result, the flotation plant is free to process some 300 to 400 tonnes per day of mainly high sulphide stockpiled ore using its own mills. | graylyn1 | |
13/9/2017 16:44 | Great news,Stephen Westhead has made a difference! | davidspringbank | |
13/9/2017 16:18 | Thanks mcfly. I may see you there, yet to decide. Well, as several posters have said. This is going to be an amazing finish to the year and next year is going to be the strongest performance by the company to date. Debt completely gone. $100m revenue. Possibly 30-40m profit. Share price is gonna go stratospheric as people realise that currently the company is valued at £35m Such a small free float too. What is it? 500k shares traded today and 10% up? Just 500k? Lets wait to see what happens on a 1-2m day like we occasionally get. We had a huge volume day last time we were at proactive, but there were more shares available then. lol matt. You now have no chance of your extra 1m shares below 30p | jbravo2 | |
13/9/2017 15:34 | Thanks jbravo2,I'm hoping to go to the proactive presentation next Thursday so can ask if we don't have clarification by then. | mcfly79 | |
13/9/2017 15:06 | Presentation to the Conference of Metallurgists 2017 – Vancouver, Canada September 2017 Flotation and Leaching at Anglo Asian Mining’s Gedabek Gold and Copper Mine in Azerbaijan | graylyn1 | |
13/9/2017 14:19 | oh yes thanks mcfly. That bit doesn't make sense to me. The flotation plant has previously treated all of the agitation tailings or indeed all the ore which went into the AL plant. That has varied between 160-180kt/qtr roughly. When it was commissioned we were told capacity was 90t/hr I wonder why it's so low now. What else is it doing? Is it just wrongly reported? Or is it a milling capacity issue? | jbravo2 | |
13/9/2017 14:07 | Thanks,I picked the 300-400 tonnes per day figures up from today's announcement:'The Company is processing the Ugur ore only by agitation leaching. The Ugur oxide-rich ores do not contain copper and therefore the tailings of the agitation leaching plant are not treated by flotation. The flotation plant is now independently processing 300 to 400 tonnes per day of mainly high sulphide stockpiled ore using its own mills. This is another configuration of the Company's processing facilities and again demonstrates the flexibility of the processing routes available to Anglo Asian.' | mcfly79 | |
13/9/2017 13:50 | 100K is what Stephen has stated they are aiming for. They look to be well on the way & during a time where metal prices are significantly higher than they had expected. Very exciting period for all involved | mattjos | |
13/9/2017 13:27 | @casa And its 212 dore production. Its quite clear in the RNS. | jbravo2 | |
13/9/2017 13:26 | Dore production is running at 212/day as you said. Again as you said that's 77k/yr The flotation plant processes at c.2000/t day not 3-400. Where did you get that idea from? Of course the unknown is the amount of gold in that stockpiled material. Flotation before has run at 400oz/month but that was flotation after leaching. It is reasonable to assume we shall recover half the gold from that sulphide ore (see the recent paper) In short if you do the maths (and I've used c1.5g/t Au for stockpile and Cu 2200t/yr produced) I reckon another 11kGEO from copper and 9k from gold from flotation/year. That takes you to 97k. Throw in silver. Water plant. 100k ball park | jbravo2 | |
13/9/2017 12:58 | The interims and a production update should make things a lot clearer.By the way i read it as 212 from ugar. | casabella2 | |
13/9/2017 12:49 | Hi jbravo2, Didn't see your post. Do you think we're currently running at 100k GEO? | mcfly79 | |
13/9/2017 12:46 | What do people think our total current production is (gold equivalent ounces)? We've been told that gold doré production in running at 212oz/day (77k/year) and is expected to increase further. The Ugur ore is only being processed by agitation leaching, leaving the floatation plant to process 300-400 tonnes per day of stockpiled ore. How much copper and precious metal concentrate will that produce? | mcfly79 | |
13/9/2017 12:44 | Just re read it. Total production by the sounds of it. Stand corrected. | wrighty46 | |
13/9/2017 12:39 | I read it as 212 total not just Ugar. | jaspoland | |
13/9/2017 12:37 | Its neither. Its 212/day dore. That's AL and heap leach but not flotation. If we produce at same rate next year using two separate production streams we'll be 100k GEO | jbravo2 | |
13/9/2017 12:35 | I read it as 212 just ugar. If that's true then this is going to fly. Shouldn't take long to get everything confirmed any day now. | wrighty46 | |
13/9/2017 12:34 | so much going on at present andrewsr ... I am sure we will get news on exploration shortly as they will have been able to make good progress during the summer months & will still be doing so. Future newsflow needs watching very, very closely .. they do tend to pack a lot into each RNS .. I think Reza begrudges paying the RNS fees so, makes the most of each one :-) | mattjos | |
13/9/2017 12:30 | Matt, it's 212 oz/day total (not just Ugur), isn't it? with Ugur still ramping up production. I was hoping for an up-date on Gedabek, Gadir, Bittibulag etc exploration - isn't that due soon? | andrewsr | |
13/9/2017 12:15 | The electrification of Gedabek last year will mean no down time that diesel generators suffered because of freezing diesel,pipes and other down times associated to maintenance etc. The diesel generators have been left on site as a back up power source so belt n braces so to speak. | bleepy | |
13/9/2017 12:12 | Looks to have broken 30. Needs to stay there | gutterhead | |
13/9/2017 12:11 | Hi can you tell me when AAZ stop production due to weather pls?Thanks | cashstrapped | |
13/9/2017 12:07 | Agitation performance not as prone to low temperature as the Heap Leaches are but, the liquids can become more sluggish to flow in extremis. Nada anyone can do if the weather is unusually severe at some point in the winter but, it is only transitory. Weather in the 70's right now and not normally until into December that the temperature goes prolonged sub zero. Plenty of time to crank out 200+ oz from Ugur | mattjos | |
13/9/2017 11:56 | Anyone care to hazard a guess how the output from Ugur will be impacted by winter weather ? | puntogt |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions