ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

AMC Amur Minerals Corporation

0.09
0.00 (0.00%)
19 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Amur Minerals Corporation LSE:AMC London Ordinary Share VGG042401007 ORD NPV
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.09 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Mineral Royalty Traders 0 -3.01M -0.0022 -0.41 1.25M

Amur Minerals Corporation Amur Completes 2018 Drill Programme (2614G)

05/11/2018 7:00am

UK Regulatory


Amur Minerals (LSE:AMC)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Amur Minerals Charts.

TIDMAMC

RNS Number : 2614G

Amur Minerals Corporation

05 November 2018

5 November 2018

AMUR MINERALS CORPORATION

(AIM: AMC)

Amur Completes 2018 Drill Programme

Amur Minerals Corporation ("Amur" or the "Company"), a nickel-copper sulphide mineral exploration and resource development company focused on the Far East of Russia, is pleased to provide its final 2018 field programme update at its wholly owned Kun-Manie nickel copper sulphide project ("Kun-Manie" or "the Project").

Designed as a two-stage programme with priority and secondary objectives established, the drill programme has now been successfully completed with all objectives attained. Key objectives included drilling per Russian agency requirements allowing for the compilation of a TEO (Russian Feasibility Study) for use in its application for necessary mining permits, drilling to convert approximately 25.0 million tonnes of existing Inferred resources to that of Indicated, identification of new resources drilled at an Indicated drill spacing for determination of a life of mine Mining Ore Reserves ("MOR") for future study updates and the acquisition of additional representative metallurgical bulk sample for final flow sheet and plant design determination. All results will provide valuable input into the development of a project financing structure.

Highlights:

-- During the season, the Company has completed 32,526.5 metres ("m") of drilling within 169 drill holes located throughout the mining licence area, bringing the total drilled metres to 117,343.7 m within 656 diamond core drill holes.

-- Entering this drill season, the nickel discovery rate metre drilling at the four deposits of Maly Kurumkon / Flangovy ("MKF"), Vodorazdelny ("VOD"), Ikenskoe / Sobolevsky ("IKEN") and Kubuk ("KUB") ranged from 27,630 pounds ("lbs") to 37,140 lbs.

-- Drilling to convert Inferred resource to Indicated was completed during September and October, allowing its future use in the determination of a MOR. Drilling has been completed at IKEN (within the Ikenskoe Inferred High Grade Zone ("IIHG")), along the ISK deposit ("ISK") located between the IKEN and KUB deposits, and at the western end of KUB. Containing a combined total of 32.5 million tonnes, averaging 0.78% nickel and 0.22% copper, the majority of this Inferred resource has now been drilled on a 100 m by 100 m grid used by RPM Global ("RPM") to assign Indicated resource that can be utilised in the determination of a MOR.

-- Newly discovered mineralisation located adjacent to IIHG, ISK and western area of KUB has been drill identified based on the RPM Indicated spacing of 100 m by 100 m. The March 2018 IIHG resource of 14.6 million Inferred ore tonnes, averaging 0.87% nickel and 0.25% copper, has been expanded laterally by as much as 81%. Drilling adjacent and between ISK and western KUB has also expanded the resource along strike and laterally from 17.9 million tonnes, at 0.74% nickel and 0.21% copper, by a projected 90%. In combination, the Company anticipates the newly discovered mineralisation will increase the March 2018 Mineral Resource Estimate ("MRE") in the order of 25 million, most of which is anticipated to be categorised as Indicated ore suitable for inclusion in development of additional MOR.

-- Final analytical results generated by Alex Stewart Laboratories ("ASL") are now available for all but the last five drill holes. Once available and the data base is fully compiled and verified, the Company can initiate the update to the March 2018 MRE. External check assaying by SGS Minerals is underway. Final analytical results are anticipated to be available Q1 2019.

-- Highly prospective drill targets remain to be tested in the future during operations. Mineralisation has not yet been fully delineated at all of the deposits. Presently the largest target is located down dip of the ISK area and covers an area of approximately 0.5 km(2) .

-- June 2018 preliminary open pit designs indicated the potential to derive MOR from the IKEN, ISK and KUB area was in the order of 58 million ore tonnes, requiring 744 million tonnes of waste to be mined and providing a 12.8 to 1.0 waste to ore stripping ratio. The average mine diluted grades were projected to be 0.61% nickel and 0.17% copper. Based on the March 2018 MRE, the newly discovered mineralisation and the conversion of existing Inferred resources, it is anticipated that there will be a material change to the preliminary ultimate pit designs. Previously, it was indicated that three separate pits could be mined. With the linking of the deposits at ISK and KUB and the reduction of the waste zone between IIHG and ISK having been drill proven, new ultimate pit optimisation results may result in the unification of the three currently identified pits into a single large ultimate pit having an overall reduced stripping ratio.

-- During September and October 2018, the remainder of the representative bulk sample was collected from IKEN, KUB and the area lying between. During the season, a total of 36 holes (6,604.4 m) containing approximately 7.5 tonnes of mineralisation was acquired, bringing the cumulative project wide bulk metallurgical sample to approximately 15 tonnes. This sample will be used to establish final flow sheet designs, metallurgical recoveries, ore variabilities, plant design, and determination of a furnace / flash smelter design with the potential to generate a Low Grade Matte ("LGM").

-- As reported in earlier RNS announcements, Russian regulatory drilling requirements have been completed at all deposits, 62 holes have been completed at a drill spacing of 50 m by 50 m containing a total of 6,742.2 m. This information will be utilised to certify the reserve, compile a TEO and obtain mining permissions. Drilling within these areas will likely allow for the upgrade of the contained resources to that of Measured by JORC (Dec. 2012) standards.

Robin Young, CEO of Amur Minerals, commented:

"Having successfully completed the 2018 engineering related drill programme at our Kun-Manie nickel copper sulphide project, the Company can fully shift its focus to the detailed engineering phase of the project. This year's drill results have been highly beneficial to the Company.

"With the focus on all drilling being done to define Indicated resources, we believe as much as 30 million tonnes of existing Inferred ore may have been converted to Indicated and the potential to increase the mineral resource inventory by up to an additional 25 million tonnes should materially impact the estimated mineral resource of the project. Especially in light of the fact that Indicated resource can be used in the definition of a larger MOR.

"Based on an RPM preliminary ultimate pit design which did use Inferred resources, allowing us to establish our 2018 drill objectives, we anticipate that the three pits located at IKEN, ISK and KUB may merge into one large pit, covering a strike length of more than four kilometres. This being possible, it could provide substantially greater potential to selectively mine higher grade production earlier in the mine life, resulting in an increase in the tonnes of metal produced by the processing plant."

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

Enquiries:

 
       Company                Nomad and Broker          Public Relations 
  Amur Minerals Corp.    S.P. Angel Corporate Finance      Blytheweigh 
                                     LLP 
   Robin Young CEO               Ewan Leggat               Megan Ray 
                                Soltan Tagiev              Tim Blythe 
                                                        +44 (0) 20 7138 
    +7(4212)755615           +44(0)20 3470 0470               3203 
 

Notes to Editors

Competent Person's Statement

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Mr. Robin Young. Mr. Young is a Geological Engineer (cum laude), a Professional Geologist licensed by the Utah Division of Occupational and Professional Licensing, and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges and a qualified person as defined by the AIM Rules for Companies. An employee of Amur for 12 years, previously Mr. Young was employed as an independent consultant with Fluor Engineers, Fluor Australia and Western Services Engineering, Inc. during which time his responsibilities included the independent compilation of resources and reserves in accordance with JORC standards. In addition, he was the lead engineer and participant of numerous studies and projects requiring the compilation of independent Bankable Studies utilised to finance small to large scale projects located worldwide. Mr. Young is responsible for the content of this announcement which includes results reported by Alex Stewart Laboratories, SGS Minerals and RPM Global.

For further information, see the Company website at www.amurminerals.com.

Click on, or paste the following link into your web browser, to view the associated PDF document and audio file.

http://amurminerals.com/content/wp-content/uploads/20180511-RNS-Oct-Drill-Update.pdf

https://amurminerals.com/content/wp-content/uploads/20180511-RNS-Oct-Drilling.mp3

Completion of the 2018 Drill Programme

This is the fifth and final drill update for the 2018 drill programme designed to advance engineering works related to the Kun-Manie nickel copper sulphide project. Priority and secondary objectives were fully completed during the season, both of which will enable the Company to undertake follow up engineering works for detailed design work related to the proposed Kun-Mine nickel copper sulphide operation and to further evaluate the long term technical and economic potential of the project.

The first phase of drilling was focused on priority objectives which have been successfully completed including:

-- Drilling of the four deposits from which mine production is anticipated to allow the Company to undertake Russian Federation certification of the reserve ("GKZ"), its inclusion in a TEO and its ultimate use in obtaining mining permissions from the Russian Federation. The additional drill information will also allow the Company to upgrade the existing resource category of Indicated upward to that of Measured due to the increased drill density. (Completed in July 2018)

-- Establish the continuity and extent of the mineralisation located within the Ikenskoe / Sobolevsky High Grade Zone ("IIHG") of the IKEN deposit for subsequent inclusion in forward looking MOR statements. The zone contains elevated nickel grades exceeding those of other resource areas and was drilled at a spacing of 100 m by 100 m, likely allowing for its conversion from Inferred to Indicated. This area can now be considered in the future determination of a MOR and its subsequent insertion into the early years of production, allowing for the production of greater tonnages of nickel and copper enhancing the economic potential of Kun-Manie. (Completed in August 2018)

-- Obtain additional bulk metallurgical sample by drilling holes along and within the IKEN, KUB and ISK deposits. Previously, limited sample and metallurgical information were available within this area prior to this season's drill programme. The acquisition of this additional sample will allow the Company to conduct metallurgical test work to determine metal recoveries with regard to rock type, grade variation, variation by deposit and identification of additional operational parametres allowing for the development of an appropriate flowsheet capable of treating the anticipated range of metallurgical responses that will be encountered over the life of the mine. (Completed in October 2018)

Drilling of the secondary objectives was initiated in August 2018 and was successfully completed over the remainder of the drill season and included the following objectives:

-- Determination of the limits of the mineralisation along a 1,800 m long drill target, including the ISK deposit and approximately 400 m of the western area of KUB. Drillingestablished the extent of the mineralisation along the target area where the potential to discover new mineralisation was present along strike and in the up and down dip directions from 2017 existing ore holes.

-- Drilling throughout the entire strike length of the 1,800 m target and within areas of newly discovered mineral was to be completed at a drill spacing of 100 m by 100 m. This spacing has been used by RPM to assign Indicated resources for future inclusion in the determination of additional MOR.

All objectives were successfully completed during the 2018 drill programme which was halted prior to winter conditions setting in precluding safe operations with regard to transportation of supplies, materials and staff to and from the drill hole locations.

Global 2018 Drill Summary

A total of 169 diamond core holes (32,526.5 m) were completed during the 2018 season. All drilling was conducted using the Company owned Boart Longyear LF 70 and LF 90 diamond core drill rigs. Since 2004, the Company has drilled 656 holes containing a total of 117,343.7 m.

Entering the 2018 drill season, the nickel discovery rate per drilled metre ranged from 27,630 pounds (KUB) to 37,140 pounds (MKF) having projected in situ ranging from $207,227 per drilled metre to $278,548 per drilled metre at $7.50 per pound nickel. Typical Company all in costs to drill a metre of core have historically ranged from $20 to $50 per metre. Entering 2018, the discover ratio (nickel value discovered / cost to drill a metre) has ranged from approximately 5,125 to 10,250.

2017 Nickel Discovery Rate Per Drilled Metre*

 
 Deposit      Drill Total     Discovered   Discovered   Discovered 
                  (m)           Ni Lbs      Ni Tonnes      $ / m 
                                  / m          / m 
             (2017 / 2018)                                $7.50 / 
                                                           Ni Lb 
   MKF      28,010 / 30,897     37,140        16.9       $278,548 
           ----------------  -----------  -----------  ----------- 
   VOD       2,975 / 3,350      29,634        13.4       $222,252 
           ----------------  -----------  -----------  ----------- 
   IKEN     22,968 / 38,215     37,041        16.8       $277,804 
           ----------------  -----------  -----------  ----------- 
   KUB      20,659 / 27,285     27,630        12.5       $207,227 
           ----------------  -----------  -----------  ----------- 
  Total     74,631 / 99,748     34,177        15.5       $256,326 
           ----------------  -----------  -----------  ----------- 
 

*The remaining 17,596 m have been drilled as twins, metallurgical holes, and within other targets.

The distribution of drilling for the full 2018 season is summarised below.

Distribution of 2018 Drill Programme

 
   2018 Totals       September / October           Area 
                            Total 
 Holes     (m)       Holes        (m) 
        ---------  ---------  ----------- 
  169    32,526.5      26       6,287.1            All 
        ---------  ---------  -----------  ------------------- 
                                              Metallurgical 
  36     6,604.4       9        1,873.1           Sample 
        ---------  ---------  -----------  ------------------- 
  19     2,887.0       0          0.0            MKF GKZ 
        ---------  ---------  -----------  ------------------- 
  14      777.2        0          0.0            IKEN GKZ 
        ---------  ---------  -----------  ------------------- 
  23     2,703.0       0          0.0           Kubuk GKZ 
        ---------  ---------  -----------  ------------------- 
   6      375.0        0          0.0            VOD GKZ 
        ---------  ---------  -----------  ------------------- 
  31     9,063.5       2         387.7             IIHG 
        ---------  ---------  -----------  ------------------- 
  15     3,922.6       2         503.0        Kubuk Step Out 
        ---------  ---------  -----------  ------------------- 
  21     5,406.8       13       3,523.3       ISK Step Out* 
        ---------  ---------  -----------  ------------------- 
   4      787.0        0          0.0       Gorny - Geological 
        ---------  ---------  -----------  ------------------- 
 

*Considered to be a part of the IKEN deposit.

Intent of September and October Drilling

In mid-August, the Company undertook the drilling of widely spaced holes located along strike eastward from the IIHG along the identified ISK and western limits of KUB. In late August, newly obtained drill results confirmed that the ISK deposit extended an additional 100 m to the west and that the previously thought barren 400 m long segment (previously referred to as the East Fault Zone) between the ISK and KUB deposits is mineralised. The combination of these two results established that the IKS and KUB deposits were indeed a single large deposit.

Given the August discovery of new mineralisation and its location relative to preliminarily indicated open pit potential (RPM defined in June 2018) at both ISK and KUB, the Company adjusted its September and October drill programme with the objective to convert as much of the existing (March 2018 MRE) Inferred resource to Indicated as possible. Simultaneously drilling of any newly discovered mineralisation along the 1,800 m ISK / KUB area was also to be completed at the spacing of 100 m by 100 m. By conversion of the Inferred to Indicated resource, future MOR upgrades can be compiled including the resource within this large area.

ISK and Western KUB Results

During September and October, 4,026.3 m of core in 15 holes were completed in the target area. Additional metallurgical drill sample collection holes and two holes at IIHG were completed.

Upon completion of the 2018 programme, the drill grid (all 2018 and previously existing holes) within the area had been completed on a 100 m by 100 m spacing used to define Indicated resources. This included both the March 2018 MRE Inferred resource and the new discovered mineralisation. Globally, ISK and west KUB results indicate that:

-- The Inferred component of the March 2018 MRE has likely been converted to Indicated. This is represented by 10.9 million Inferred ore tonnes averaging 0.77% nickel and 0.22% copper. Drilling is anticipated to have increased the local March 2018 MRE Indicated inventory to a total of 17.9 million tonnes averaging 0.74% nickel and 0.21% copper.

March 2018 MRE at ISK and Western KUB

 
 Deposit     Resource    Tonnes    Ni     Cu     2017 
             Category      (m)     (%)    (%)    Drill 
                                                 Holes 
   ISK      Indicated     7.0     0.69   0.2      12 
           -----------  -------  -----  -----  ------- 
        Inferred          10.7    0.77   0.22     11 
 ---------------------  -------  -----  -----  ------- 
   KUB       Inferred     0.2     0.74   0.21     2 
           -----------  -------  -----  -----  ------- 
      Cumulative          17.9    0.74   0.21     25 
                        -------  -----  -----  ------- 
 

-- The newly discovered mineralisation located to the west of ISK and between ISK and KUB was drilled at the Indicated resource category assignment. Step out holes in the up dip and down dip directions were also completed along the 1,800 m target and the limits of the mineralisation were indicated to have been expanded by nearly 90%. The newly discovered mineral is projected to be approximately 26.8 m in vertical thickness, averaging 0.75% nickel and 0.27% copper.

Consolidated Impact

The March 2018 MRE in the ISK and western KUB area was defined by 25 drill holes completed prior to 2018. The MRE included the presence of a total of 17.9 million tonne resource (averaging 23.9 m vertical thickness). The March 2018 MRE was utilised to derive preliminary open pit designs (including Inferred resource) for use in drill planning in the area. These designs were excluded from consideration in the Prefeasibility Study ("PFS") work as nearly 60% of the MRE in this area was classified as an Inferred resource.

The 2018 drill results at ISK and western KUB materially impact the project potential:

-- The existing Inferred resource in the area has likely been converted to Indicated allowing for its inclusion in future MOR definition work. The current Inferred resource is 10.9 million ore tonnes averaging 0.77% nickel and 0.22% copper and has not been considered in the PFS. Its conversion to Indicated allowing for its use in the derivation of MOR will be evaluated in the future.

   --     The existing MRE has likely been substantially increased as a result of the discovery of new mineralisation along this ISK, western KUB area.  Drilled at the Indicated resource spacing, the newly discovered mineralisation will also be evaluated in future MOR derivations.  The 2018 drill programme has expanded the limits of the mineralisation by 90% and is now identified to cover an area of approximately 470,000 m(2) .  The newly discovered ores could increase the MRE in this area by as much as 15 to 20 million tonnes averaging approximately 0.75% nickel and 0.27% copper. 

-- June 2018 preliminary open pit designs indicated the potential to derive MOR from the IKEN, ISK and KUB area was in the order of 58 million ore tonnes requiring 744 million tonnes of waste to be mined providing a 12.8 to 1.0 waste to ore stripping ratio. The average mine diluted grades were projected to be 0.61% nickel and 0.17% copper. Based on the March 2018 MRE, the newly discovered mineralisation and the conversion of existing Inferred resources, it is anticipated that there will be a material change to the preliminary ultimate pit designs. Previously, it was indicated that three separate pits could be mined. With the linking of the deposits at ISK and KUB and the reduction of the waste zone between IIHG and ISK having been drill proven, new ultimate pit optimisation results may well result in the unification of the three currently identified pits into a single large ultimate pit having a reduced stripping ratio.

Other 2018 Drill Accomplishments

These include:

-- At the IIHG area of the IKEN deposit, the Company projects that drilling has expanded resource and total contained metal in the range of 75% to 100% (from that of 127,000 nickel tonnes) whilst simultaneously being upgraded to an Indicated resource fully suited for inclusion in MOR determination. On a production basis, the IIHG area could contain as much as four years of higher grade production available to production earlier in the mine life significantly contributing to project economics. Drill grades indicate a nickel content of 0.91% and a copper grade of 0.25%.

-- Drilling along a 2,900 m long strike including the IIHG, the ISK Orebody and the western half of KUB mineralisation indicates the presence of a single near continuous ore body identified by 29 holes drilled at 100 m intervals. The drill line of holes along the structure indicates the core of the mineralisation averages 35.6 m in thickness and contains 0.83% nickel and 0.25% copper. The area represents an open pit target along the entire length and underground potential may exist on the deep ores.

-- Detailed infill drilling has been completed on an approximately spacing of 50 m by 50 m within each of the MKF, VOD, IKEN and KUB deposits. Required by Russian regulatory agencies, the work is used to certify Russian reserve statements, subsequent use in the compilation of a TEO and applications for mining permissions. The reduced drill hole spacing may also increase the Measured resource inventory.

   --     Metallurgical sample collection by drilling has been completed providing the Company with a representative bulk sample distributed throughout all deposits.  The sample will enable the Company to undertake key design work related to flow sheet design, metallurgical recovery determination, assessment of the variability of the ores and related responses, plant design, and evaluation of the potential design of a LGM generation facility. 

Analytical Results - Cautionary Comment

Analytical results presented in this RNS announcement are derived from two sources, internally and independently generated results. The internal Company generated results are defined using one of two Niton XL2 500 X-Ray Fluorescence units ("RFA"). The RFA units provide initial results allowing for a rapid turnaround to assist in decision making to finalise drill hole site selections and are considered to be indicative and preliminary. Use of these results is not without risk if the RFA units have not been rigorously tested and calibrated. Annually, at the beginning of every field season and on a daily basis, these units undergo a calibration protocol that uses standards provided with the units and results from existing samples that have been analysed by external facilities (ASL). A total of five holes have utilised the RFA results.

The final and definitive source of analytical results is produced by Alex Stewart Laboratories located in Moscow, Russia. This fully independent, licenced and certified laboratory is the source of the information used in resource estimation. The ASL results provide a greater accuracy than that of the RFA units especially for values in excess of 1.0% nickel. RPM has reviewed the Company's sample preparation, sample collection and check assaying related to sample submitted to ASL and has confirmed that Amur's protocols all stages of its work regarding analytical determination meet industry standards.

Maly Kurumkon / Flangovy Russian Infill Area

Final ASL 2018 Drill Results

 
  Hole      From      To     Length    Ni ASL   Cu ASL    Vertical 
             (m)      (m)      (m)       (%)      (%)     Thickness 
                                                             (m) 
  C507      27.1     37.6     10.5      0.76     0.21       10.1 
          -------  -------  --------  -------  -------  ----------- 
            48.1     55.4      7.3      0.58     0.18       7.1 
          -------  -------  --------  -------  -------  ----------- 
  C508      59.6     65.6      6.0      0.59     0.22       5.8 
          -------  -------  --------  -------  -------  ----------- 
            74.6     82.0      7.4      0.67     0.16       7.2 
          -------  -------  --------  -------  -------  ----------- 
  C509      86.0     92.0      6.0      0.98     0.28       5.8 
          -------  -------  --------  -------  -------  ----------- 
            96.5    110.0     13.5      0.67     0.21       13.0 
          -------  -------  --------  -------  -------  ----------- 
           113.0    120.8      7.8      0.63     0.15       7.5 
          -------  -------  --------  -------  -------  ----------- 
  C510     124.6    129.0      4.4      0.60     0.09       4.3 
          -------  -------  --------  -------  -------  ----------- 
           136.5    141.4      4.9      0.55     0.17       4.7 
          -------  -------  --------  -------  -------  ----------- 
  C511     143.6    150.4      6.8      0.79     0.16       6.6 
          -------  -------  --------  -------  -------  ----------- 
           160.5    166.0      5.5      0.72     0.10       5.3 
          -------  -------  --------  -------  -------  ----------- 
  C512     208.3    215.8      7.5      1.02     0.23       7.3 
          -------  -------  --------  -------  -------  ----------- 
           227.8    232.3      4.5      0.77     0.20       4.4 
          -------  -------  --------  -------  -------  ----------- 
  C513      82.0    146.0     64.0      0.89     0.22       61.8 
          -------  -------  --------  -------  -------  ----------- 
  C514      63.5     94.0     30.5      0.93     0.25       29.5 
          -------  -------  --------  -------  -------  ----------- 
            97.0    117.6     20.6      0.86     0.20       19.9 
          -------  -------  --------  -------  -------  ----------- 
  C515     130.3    146.5     16.2      0.55     0.16       15.7 
          -------  -------  --------  -------  -------  ----------- 
           149.5    173.5     24.0      0.61     0.18       23.2 
          -------  -------  --------  -------  -------  ----------- 
           182.5    191.3      8.8      0.63     0.14       8.5 
          -------  -------  --------  -------  -------  ----------- 
  C516     208.3    212.8      4.5      0.65     0.18       4.4 
          -------  -------  --------  -------  -------  ----------- 
           221.6    226.9      5.3      0.89     0.24       5.1 
          -------  -------  --------  -------  -------  ----------- 
  C517      3.0      39.0     36.0      0.82     0.25       34.8 
          -------  -------  --------  -------  -------  ----------- 
            43.5     59.3     15.8      0.52     0.26       15.3 
          -------  -------  --------  -------  -------  ----------- 
            62.5     74.7     12.2      0.83     0.23       11.8 
          -------  -------  --------  -------  -------  ----------- 
  C518     153.0    157.5      4.5      0.57     0.18       4.4 
          -------  -------  --------  -------  -------  ----------- 
           166.5    172.5      6.0      0.76     0.22       5.8 
          -------  -------  --------  -------  -------  ----------- 
  C519     131.1    137.0      5.9      0.93     0.25       5.7 
          -------  -------  --------  -------  -------  ----------- 
           146.7    155.5      8.8      0.78     0.32       8.5 
          -------  -------  --------  -------  -------  ----------- 
  C520      99.6    107.0      7.4      0.80     0.22       7.2 
          -------  -------  --------  -------  -------  ----------- 
           113.0    122.0      9.0      0.78     0.20       8.7 
          -------  -------  --------  -------  -------  ----------- 
  C521      5.2      30.5     25.3      0.93     0.26       24.4 
          -------  -------  --------  -------  -------  ----------- 
            41.4     66.4     25.0      0.93     0.22       24.2 
          -------  -------  --------  -------  -------  ----------- 
  C522     183.0    193.5     10.5      0.68     0.17       10.1 
          -------  -------  --------  -------  -------  ----------- 
           198.0    206.3      8.3      0.87     0.18       8.0 
          -------  -------  --------  -------  -------  ----------- 
  C523     104.2    122.0     17.8      0.74     0.26       17.2 
          -------  -------  --------  -------  -------  ----------- 
           131.0    146.9     15.9      0.49     0.16       15.4 
          -------  -------  --------  -------  -------  ----------- 
           151.3    160.0      8.7      0.66     0.23       8.4 
          -------  -------  --------  -------  -------  ----------- 
           170.0    181.5     11.5      0.87     0.23       11.1 
          -------  -------  --------  -------  -------  ----------- 
  C524      57.3     64.2      6.9      1.34     0.26       6.7 
          -------  -------  --------  -------  -------  ----------- 
            68.4    129.5     61.1      0.91     0.23       59.0 
          -------  -------  --------  -------  -------  ----------- 
  C525      20.5     41.5     21.0      0.93     0.29       20.3 
          -------  -------  --------  -------  -------  ----------- 
            80.5     92.9     12.4      0.60     0.19       12.0 
          -------  -------  --------  -------  -------  ----------- 
       Average m / Hole- 30.3 
     Average m / Interval - 13.7        0.80     0.22 
                                      -------  -------  ----------- 
 

Vodorazdelny Russian Infill Area

Final ASL 2018 Drill Results

 
  Hole      From     To      Length    Ni ASL   Cu ASL    Vertical 
             (m)     (m)       (m)       (%)      (%)     Thickness 
                                                             (m) 
  C620                            No Mineral 
          --------------------------------------------------------- 
  C621                            No Mineral 
          --------------------------------------------------------- 
  C622      0.0     25.3      25.3      1.06     0.25       25.3 
          -------  ------  ---------  -------  -------  ----------- 
  C623      2.5     46.8      44.3      1.02     0.31       44.3 
          -------  ------  ---------  -------  -------  ----------- 
  C624      19.0    32.5      13.5      0.81     0.21       13.5 
          -------  ------  ---------  -------  -------  ----------- 
            35.5    43.3      7.8       0.87     0.30       7.8 
          -------  ------  ---------  -------  -------  ----------- 
  C625                            No Mineral 
          --------------------------------------------------------- 
       Average m / Hole- 30.3 
     Average m / Interval - 22.7        0.99     0.28 
                                      -------  -------  ----------- 
 

Ikenskoe / Sobolevsky Russian Infill Area

Final ASL 2018 Drill Results

 
  Hole      From     To     Length    Ni ASL   Cu ASL    Vertical 
             (m)     (m)      (m)       (%)      (%)     Thickness 
                                                            (m) 
  C386      2.9      9.8      6.9      0.87     0.30       6.9 
          -------  ------  --------  -------  -------  ----------- 
  C388      4.5     10.5      6.0      0.49     0.13       6.0 
          -------  ------  --------  -------  -------  ----------- 
            15.0    23.8      8.8      0.63     0.25       8.8 
          -------  ------  --------  -------  -------  ----------- 
            27.0    30.0      3.0      0.38     0.10       3.0 
          -------  ------  --------  -------  -------  ----------- 
  C391      53.5    61.0      7.5      0.73     0.28       7.5 
          -------  ------  --------  -------  -------  ----------- 
            65.5    76.8     11.3      0.52     0.18       11.3 
          -------  ------  --------  -------  -------  ----------- 
  C392      67.7    77.7     10.0      0.77     0.22       10.0 
          -------  ------  --------  -------  -------  ----------- 
            83.7    93.8     10.1      0.83     0.23       10.1 
          -------  ------  --------  -------  -------  ----------- 
  C394      29.5    37.0      7.5      0.84     0.26       7.5 
          -------  ------  --------  -------  -------  ----------- 
  C395      5.5     14.5      9.0      0.66     0.16       9.0 
          -------  ------  --------  -------  -------  ----------- 
            19.0    30.5     11.5      0.71     0.21       11.5 
          -------  ------  --------  -------  -------  ----------- 
  C396      34.9    39.2      4.3      0.55     0.10       4.3 
          -------  ------  --------  -------  -------  ----------- 
            68.5    79.3     10.8      0.86     0.30       10.8 
          -------  ------  --------  -------  -------  ----------- 
  C397      49.0    52.0      3.0      0.45     0.17       3.0 
          -------  ------  --------  -------  -------  ----------- 
            56.5    61.0      4.5      0.58     0.09       4.5 
          -------  ------  --------  -------  -------  ----------- 
  C398      5.8     20.2     14.4      0.51     0.16       14.4 
          -------  ------  --------  -------  -------  ----------- 
  C399      23.5    33.3      9.8      1.08     0.23       9.8 
          -------  ------  --------  -------  -------  ----------- 
            45.6    54.6      9.0      0.81     0.24       9.0 
          -------  ------  --------  -------  -------  ----------- 
       Average m / Hole- 14.7 
     Average m / Interval - 8.2        0.71     0.21 
                                     -------  -------  ----------- 
 

Kubuk Russian Infill Area

Final ASL 2018 Drill Results

 
  Hole      From      To     Length    Ni ASL   Cu ASL    Vertical 
             (m)      (m)      (m)       (%)      (%)     Thickness 
                                                             (m) 
  C530     124.0    133.0      9.0      0.53     0.16       9.0 
          -------  -------  --------  -------  -------  ----------- 
           137.5    150.4     12.9      0.86     0.23       12.9 
          -------  -------  --------  -------  -------  ----------- 
  C531     149.8    159.0      9.2      0.51     0.16       9.2 
          -------  -------  --------  -------  -------  ----------- 
  C532     161.4    184.4      23       0.44     0.13       23.0 
          -------  -------  --------  -------  -------  ----------- 
  C533     130.0    144.5     14.5      0.49     0.17       14.5 
          -------  -------  --------  -------  -------  ----------- 
           152.0    155.0      3.0      1.36     0.10       3.0 
          -------  -------  --------  -------  -------  ----------- 
  C534     121.5    124.5      3.0      0.37     0.11       3.0 
          -------  -------  --------  -------  -------  ----------- 
           130.0    137.4      7.4      0.42     0.13       7.4 
          -------  -------  --------  -------  -------  ----------- 
  C535      91.0     95.5      4.5      0.61     0.21       4.5 
          -------  -------  --------  -------  -------  ----------- 
           103.9    107.2      3.3      0.47     0.16       3.3 
          -------  -------  --------  -------  -------  ----------- 
           121.0    125.7      4.7      0.36     0.11       4.7 
          -------  -------  --------  -------  -------  ----------- 
           134.9    149.8     14.9      0.76     0.12       14.9 
          -------  -------  --------  -------  -------  ----------- 
  C536     127.8    130.8      3.0      0.58     0.14       3.0 
          -------  -------  --------  -------  -------  ----------- 
           133.8    144.7     10.9      0.55     0.15       10.9 
          -------  -------  --------  -------  -------  ----------- 
  C537      61.1     91.9     30.8      0.63     0.18       30.8 
          -------  -------  --------  -------  -------  ----------- 
  C538     123.1    136.1     13.0      0.87     0.25       13.0 
          -------  -------  --------  -------  -------  ----------- 
  C539      90.8     93.8      3.0      0.88     0.26       3.0 
          -------  -------  --------  -------  -------  ----------- 
           100.3    108.5      8.2      0.67     0.19       8.2 
          -------  -------  --------  -------  -------  ----------- 
  C540     115.8    125.0      9.2      0.76     0.21       9.2 
          -------  -------  --------  -------  -------  ----------- 
  C541      98.0    106.6      8.6      0.76     0.16       8.6 
          -------  -------  --------  -------  -------  ----------- 
  C542      56.8     75.8     19.0      0.57     0.15       19.0 
          -------  -------  --------  -------  -------  ----------- 
  C543      73.5     82.5      9.0      0.90     0.23       9.0 
          -------  -------  --------  -------  -------  ----------- 
            85.5     92.1      6.6      0.59     0.18       6.6 
          -------  -------  --------  -------  -------  ----------- 
  C544      49.7     66.0     16.3      1.05     0.27       16.3 
          -------  -------  --------  -------  -------  ----------- 
            70.5     81.1     10.6      0.79     0.22       10.6 
          -------  -------  --------  -------  -------  ----------- 
  C545                            No Mineral 
          --------------------------------------------------------- 
  C546      8.2      34.3     26.1      0.59     0.17       26.1 
          -------  -------  --------  -------  -------  ----------- 
  C547                            No Mineral 
          --------------------------------------------------------- 
  C548                            No Mineral 
          --------------------------------------------------------- 
  C549       8       18.5     10.5      0.64     0.19       10.5 
          -------  -------  --------  -------  -------  ----------- 
            21.5     47.9     26.4      0.56     0.13       26.4 
          -------  -------  --------  -------  -------  ----------- 
  C550      33.6     37.7      4.1      0.48     0.08       4.1 
          -------  -------  --------  -------  -------  ----------- 
  C551      43.2     47.7      4.5      0.85     0.25       4.5 
          -------  -------  --------  -------  -------  ----------- 
            50.7     64.9     14.2      0.74     0.18       14.2 
          -------  -------  --------  -------  -------  ----------- 
  C552      72.6      77       4.4      0.55     0.16       4.4 
          -------  -------  --------  -------  -------  ----------- 
            81.1     85.8      4.7      0.85     0.24       4.7 
          -------  -------  --------  -------  -------  ----------- 
            88.5     95.0      6.5      0.78     0.24       6.5 
          -------  -------  --------  -------  -------  ----------- 
       Average m / Hole- 18.0 
     Average m / Interval - 10.6        0.66     0.18 
                                      -------  -------  ----------- 
 

Ikenskoe / Sobolevsky Area

IIHG Drill Results

Final ASL 2018 Drill Results*

*RFA Company Result

 
    Hole       From     To     Length   Ni ASL   Cu ASL    Vertical 
                (m)     (m)      (m)      (%)      (%)     Thickness 
                                                              (m) 
    C600       166.7   209.5    42.8     0.82     0.27       42.8 
              ------  ------  -------  -------  -------  ----------- 
    C601       152.0   155.0    3.0      0.86     0.19       3.0 
              ------  ------  -------  -------  -------  ----------- 
               159.6   172.1    12.5     0.85     0.23       12.5 
              ------  ------  -------  -------  -------  ----------- 
               176.3   205.6    29.3     1.08     0.24       29.3 
              ------  ------  -------  -------  -------  ----------- 
    C602       201.9   209.5    7.6      0.73     0.19       7.6 
              ------  ------  -------  -------  -------  ----------- 
               212.5   229.3    16.8     0.76     0.19       16.8 
              ------  ------  -------  -------  -------  ----------- 
    C603       271.0   278.5    7.5      0.89     0.19       7.5 
              ------  ------  -------  -------  -------  ----------- 
               287.5   293.1    5.6      1.09     0.24       5.6 
              ------  ------  -------  -------  -------  ----------- 
    C604       235.8   238.8    3.0      0.38     0.09       3.0 
              ------  ------  -------  -------  -------  ----------- 
               245.5   253.6    8.1      0.59     0.16       8.1 
              ------  ------  -------  -------  -------  ----------- 
    C605                            No Mineral 
              ------------------------------------------------------ 
    C606       124.0   131.8    7.8      0.76     0.15       7.8 
              ------  ------  -------  -------  -------  ----------- 
    C607       88.0    97.0     9.0      0.42     0.12       9.0 
              ------  ------  -------  -------  -------  ----------- 
               104.5   112.0    7.5      0.95     0.19       7.5 
              ------  ------  -------  -------  -------  ----------- 
    C608       63.0    76.0     13.0     0.89     0.21       13.0 
              ------  ------  -------  -------  -------  ----------- 
               82.0    116.5    34.5     1.10     0.26       34.5 
              ------  ------  -------  -------  -------  ----------- 
    C609                            No Mineral 
              ------------------------------------------------------ 
    C610       188.5   235.0    46.5     0.85     0.26       46.5 
              ------  ------  -------  -------  -------  ----------- 
    C611       171.6   176.5    4.9      0.98     0.24       4.9 
              ------  ------  -------  -------  -------  ----------- 
               181.0   214.0    33.0     0.54     0.23       33.0 
              ------  ------  -------  -------  -------  ----------- 
    C612       383.2   399.4    16.2     0.69     0.20       16.2 
              ------  ------  -------  -------  -------  ----------- 
    C613                            No Mineral 
              ------------------------------------------------------ 
    C614                            No Mineral 
              ------------------------------------------------------ 
    C615       335.5   343.0    7.5      0.73     0.20       7.5 
              ------  ------  -------  -------  -------  ----------- 
               346.0   349.0    3.0      1.41     0.32       3.0 
              ------  ------  -------  -------  -------  ----------- 
    C616       322.0   334.0    12.0     0.82     0.20       12.0 
              ------  ------  -------  -------  -------  ----------- 
    C617       253.0   272.5    19.5     0.84     0.19       19.5 
              ------  ------  -------  -------  -------  ----------- 
    C618       209.5   240.9    31.4     0.89     0.14       31.4 
              ------  ------  -------  -------  -------  ----------- 
    C619                            No Mineral 
              ------------------------------------------------------ 
    C626       302.2   314.5    12.3     1.06     0.29       12.3 
              ------  ------  -------  -------  -------  ----------- 
               332.5   348.1    15.6     0.93     0.29       15.6 
              ------  ------  -------  -------  -------  ----------- 
    C627       334.2   371.7    37.5     0.95     0.23       37.5 
              ------  ------  -------  -------  -------  ----------- 
               380.8   385.0    4.2      1.00     0.27       4.2 
              ------  ------  -------  -------  -------  ----------- 
    C628       368.7   392.8    24.1     0.74     0.20       24.1 
              ------  ------  -------  -------  -------  ----------- 
    C629       256.3   286.0    29.7     1.04     0.26       29.7 
              ------  ------  -------  -------  -------  ----------- 
               296.5   307.0    10.5     0.34     0.16       10.5 
              ------  ------  -------  -------  -------  ----------- 
               343.0   347.9    4.9      0.38     0.23       4.9 
              ------  ------  -------  -------  -------  ----------- 
 C580 - RFA    67.1    73.0     5.9      0.83     0.19       5.9 
              ------  ------  -------  -------  -------  ----------- 
               77.5    100.3    22.8     0.69     0.18       22.8 
              ------  ------  -------  -------  -------  ----------- 
 C581 - RFA    246.6   268.0    21.4     0.60     0.17       20.1 
              ------  ------  -------  -------  -------  ----------- 
    C630                            No Mineral 
              ------------------------------------------------------ 
    C631                            No Mineral 
              ------------------------------------------------------ 
    C632                            No Mineral 
              ------------------------------------------------------ 
    C634                            No Mineral 
              ------------------------------------------------------ 
        Average m / Hole- 27.1 
      Average m / Interval - 16.3        0.83     0.22 
                                       -------  -------  ----------- 
 

ISK Area

Final ASL 2018 Drill Results*

*RFA Company Result

 
    Hole       From     To     Length   Ni ASL   Cu ASL    Vertical 
                (m)     (m)      (m)      (%)      (%)     Thickness 
                                                              (m) 
    C558       101.9    143     41.1     0.86     0.25       41.1 
              ------  ------  -------  -------  -------  ----------- 
                146    203.6    57.6     0.87     0.22       57.6 
              ------  ------  -------  -------  -------  ----------- 
    C559       245.9   251.8    5.9      0.64     0.17       5.9 
              ------  ------  -------  -------  -------  ----------- 
               257.8   260.8    3.0      0.45     0.25       3.0 
              ------  ------  -------  -------  -------  ----------- 
                268    278.1    10.1     0.85     0.24       10.1 
              ------  ------  -------  -------  -------  ----------- 
    C560       209.8   232.5    22.7     0.61     0.16       22.7 
              ------  ------  -------  -------  -------  ----------- 
    C561       169.2   184.9    15.7     0.92     0.22       15.7 
              ------  ------  -------  -------  -------  ----------- 
    C562       181.0   201.0    20.0     0.62     0.17       20.0 
              ------  ------  -------  -------  -------  ----------- 
    C563       180.3   183.3    3.0      0.36     0.09       3.0 
              ------  ------  -------  -------  -------  ----------- 
               187.6   193.2    5.6      0.83     0.18       5.6 
              ------  ------  -------  -------  -------  ----------- 
    C564                            No Mineral 
              ------------------------------------------------------ 
    C633       176.5   237.8    61.3     0.88     0.22       61.3 
              ------  ------  -------  -------  -------  ----------- 
    C635       173.7   188.5    14.8     0.97     0.25       14.8 
              ------  ------  -------  -------  -------  ----------- 
               191.5   203.8    12.3     0.80     0.23       12.3 
              ------  ------  -------  -------  -------  ----------- 
    C573       300.7   303.7    3.0      0.36     0.19       3.0 
              ------  ------  -------  -------  -------  ----------- 
    C636       115.0   142.0    27.0     0.88     0.25       27.0 
              ------  ------  -------  -------  -------  ----------- 
               164.5   167.5    3.0      0.37     0.18       3.0 
              ------  ------  -------  -------  -------  ----------- 
               173.5   176.5    3.0      0.35    16.90       3.0 
              ------  ------  -------  -------  -------  ----------- 
    C574                            No Mineral 
              ------------------------------------------------------ 
    C637       177.0   185.5    8.5      0.53     0.14       8.5 
              ------  ------  -------  -------  -------  ----------- 
               233.5   238.0    4.5      0.60     0.28       4.5 
              ------  ------  -------  -------  -------  ----------- 
    C575                            No Mineral 
              ------------------------------------------------------ 
    C638       200.6   224.5    23.9     1.01     0.26       23.9 
              ------  ------  -------  -------  -------  ----------- 
               227.5   263.6    36.1     0.77     0.24       36.1 
              ------  ------  -------  -------  -------  ----------- 
    C576       286.0   292.0    6.0      0.37     0.18       5.9 
              ------  ------  -------  -------  -------  ----------- 
    C639       193.0   217.0    24.0     0.80     0.19       24.0 
              ------  ------  -------  -------  -------  ----------- 
               220.0   229.0    9.0      0.84     0.26       9.0 
              ------  ------  -------  -------  -------  ----------- 
    C640       169.0   194.5    25.5     0.79     0.21       25.5 
              ------  ------  -------  -------  -------  ----------- 
               197.5   218.5    21.0     0.69     0.24       21.0 
              ------  ------  -------  -------  -------  ----------- 
    C641       178.0   210.7    32.7     0.85     0.26       32.7 
              ------  ------  -------  -------  -------  ----------- 
    C642       188.8   200.3    11.5     0.75     0.21       11.5 
              ------  ------  -------  -------  -------  ----------- 
    C643       284.0   307.0    23.0     0.68     0.18       20.8 
              ------  ------  -------  -------  -------  ----------- 
 C577 - RFA    212.5   236.5    24.0     0.72     0.12       22.6 
              ------  ------  -------  -------  -------  ----------- 
               239.5   248.4    8.9      0.64     0.17       8.4 
              ------  ------  -------  -------  -------  ----------- 
        Average m / Hole- 29.7 
      Average m / Interval - 18.8        0.79     0.31 
                                       -------  -------  ----------- 
 

Kubuk Area

Final ASL 2018 Drill Results*

*RFA Company Result

 
    Hole       From     To     Length   Ni ASL   Cu ASL    Vertical 
                (m)     (m)      (m)      (%)      (%)     Thickness 
                                                              (m) 
    C553       353.4   360.2    6.8      0.51     0.16       6.8 
              ------  ------  -------  -------  -------  ----------- 
    C554       253.4   260.1    6.7      0.66     0.17       6.7 
              ------  ------  -------  -------  -------  ----------- 
    C555       256.8   259.8     3       0.81     0.25       3.0 
              ------  ------  -------  -------  -------  ----------- 
    C556                            No Mineral 
              ------------------------------------------------------ 
    C557                            No Mineral 
              ------------------------------------------------------ 
    C565       128.2   141.0    12.8     0.51     0.19       12.8 
              ------  ------  -------  -------  -------  ----------- 
               183.4   194.6    11.2     0.49     0.14       11.2 
              ------  ------  -------  -------  -------  ----------- 
               198.8   203.0    4.2      0.84     0.18       4.2 
              ------  ------  -------  -------  -------  ----------- 
    C566                            No Mineral 
              ------------------------------------------------------ 
    C567       131.5   139.5    8.0      0.50     0.21       8.0 
              ------  ------  -------  -------  -------  ----------- 
               190.2   202.0    11.8     0.91     0.24       11.8 
              ------  ------  -------  -------  -------  ----------- 
    C568       119.0   143.0    24.0     0.88     0.24       24.0 
              ------  ------  -------  -------  -------  ----------- 
               149.0   198.5    49.5     0.61     0.19       49.5 
              ------  ------  -------  -------  -------  ----------- 
    C569       211.6   241.0    29.4     0.78     0.21       29.4 
              ------  ------  -------  -------  -------  ----------- 
               248.5   288.1    39.6     0.74     0.18       39.6 
              ------  ------  -------  -------  -------  ----------- 
    C570       213.0   217.1    4.1      0.51     0.15       3.4 
              ------  ------  -------  -------  -------  ----------- 
    C571       152.5   158.5    6.0      0.47     0.12       5.4 
              ------  ------  -------  -------  -------  ----------- 
               188.5   191.5    3.0      0.34     0.15       2.7 
              ------  ------  -------  -------  -------  ----------- 
               221.5   226.0    4.5      0.41     0.20       4.1 
              ------  ------  -------  -------  -------  ----------- 
               250.0   256.0    6.0      0.51     0.26       5.4 
              ------  ------  -------  -------  -------  ----------- 
               277.0   282.9    5.9      0.43     0.15       5.4 
              ------  ------  -------  -------  -------  ----------- 
    C572       230.5   236.5    6.0      0.50     0.24       6.0 
              ------  ------  -------  -------  -------  ----------- 
               249.6   260.9    11.3     0.92     0.23       11.3 
              ------  ------  -------  -------  -------  ----------- 
 C578 - RFA    183.2   193.6    10.4     0.65     0.22       8.8 
              ------  ------  -------  -------  -------  ----------- 
 C579 - RFA    183.3   189.7    6.4      1.02     0.36       6.4 
              ------  ------  -------  -------  -------  ----------- 
        Average m / Hole- 22.2 
      Average m / Interval - 12.1        0.68     0.20 
                                       -------  -------  ----------- 
 

March 2018 Mineral Resource Estimate

0.4% Nickel Cutoff Grade

 
    Resource        Ore     Ni     Cu     Co      Pt     Pd     Eq                      Contained Metal (t) 
  Classification     Mt      %      %      %      g/t    g/t    Ni 
                                                                (%) 
                                                                         Ni         Cu         Co       Pt     Pd       Eq 
                                                                      (1000's)   (1000's)   (1000's)    (t)    (t)       Ni 
                                                                                                                      (1000's) 
                                                                     ---------  ---------  ---------  -----  -----  ---------- 
                                                              MKF 
    Measured 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    Indicated      57.5    0.77   0.22   0.015   0.15   0.16   1.06     445        124        8.9      8.8    9.3      606.5 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
       M+I         57.5    0.77   0.22   0.015   0.15   0.16   1.06     445        124        8.9      8.8    9.3      606.5 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    Inferred        3.4    0.80   0.22   0.017   0.16   0.15   1.06      27         7         0.6      0.5    0.5      36.1 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    MKF TOTAL      60.9    0.78   0.22   0.015   0.15   0.16   1.06     472        131        9.5      9.3    9.8      643.0 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
                                                             IKEN 
    Measured       10.6    0.71   0.18   0.011   0.22   0.26   0.98      75         19        1.1      2.3    2.8      103.2 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    Indicated      13.6    0.66   0.17   0.012   0.18   0.20   0.91      89         24        1.7      2.4    2.8      123.7 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
       M+I         24.2    0.68   0.18   0.012   0.19   0.23   0.94     164         43        2.8      4.7    5.6      226.9 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    Inferred       27.8    0.80   0.23   0.017   0.19   0.19   1.10     222         63        4.6      5.2    5.3      306.5 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
   IKEN TOTAL      51.9    0.75   0.20   0.014   0.19   0.21   1.03     386        106        7.5      9.9    10.8     534.0 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
                                                              KUB 
    Measured                                                                                                             - 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    Indicated      32.9    0.69   0.19   0.014   0.13   0.12   0.93     226         63        4.7      4.3    3.9      306.0 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
       M+I         32.9    0.69   0.19   0.014   0.13   0.12   0.93     226         63        4.7      4.3    3.9      306.0 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    Inferred        4.7    0.70   0.19   0.014   0.12   0.12   0.94      33         9         0.7      0.6    0.6      44.5 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    KUB TOTAL      37.6    0.69   0.19   0.014   0.13   0.12   0.93     259         72        5.3      4.9    4.5      349.9 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
                                                              VOD 
    Measured        0.6    0.74   0.22   0.012   0.29   0.32   1.24      5          1         0.1      0.2    0.2       7.6 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    Indicated       3.2    0.85   0.21   0.017   0.16   0.16   1.13      27         7         0.5      0.5    0.5      36.0 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
       M+I          3.8    0.85   0.21   0.016   0.20   0.19   1.15      32         8         0.6      0.7    0.7      43.9 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    Inferred        1.0    0.81   0.22   0.016   0.17   0.16   1.06      8          2         0.2      0.2    0.2      11.0 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    VOD TOTAL       4.8    0.83   0.21   0.016   0.18   0.18   1.13      40         10        0.8      0.9    0.9      54.6 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
                                                             TOTAL 
    Measured       11.2    0.71   0.18   0.011   0.23   0.26   0.99      80         20        1.3      2.5    3.0      110.8 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    Indicated      107.0   0.74   0.20   0.015   0.15   0.15   1.00     787        217        16.2     16.0   16.6    1,075.1 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
       M+I         118.2   0.73   0.20   0.015   0.16   0.17   1.00     867        237        17.5     18.5   19.6    1,185.9 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
    Inferred       37.0    0.79   0.22   0.017   0.17   0.18   1.08     290         81        6.0      6.4    6.6      398.2 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
      TOTAL        155.1   0.75   0.21   0.015   0.16   0.17   1.02    1,157       319        23.5     24.9   26.0    1,581.6 
                  ------  -----  -----  ------  -----  -----  -----  ---------  ---------  ---------  -----  -----  ---------- 
 

Numbers may not be concise due to rounding.

Glossary

DEFINITIONS OF EXPLORATION RESULTS, RESOURCES & RESERVES

EXTRACTED FROM THE JORC CODE: (December 2012) (www.jorc.org)

A 'Mineral Resource' is a concentration or occurrence of material of intrinsic economic interest in or on the Earth's crust in such form, quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge. Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories.

An 'Inferred Mineral Resource' is that part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.

An 'Indicated Mineral Resource' is that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

A 'Measured Mineral Resource' is that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are spaced closely enough to confirm geological and/or grade continuity.

An 'Ore Reserve' is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses which may occur when the material is mined. Appropriate assessments and studies have been carried out, and include consideration of and modification by realistically assumed mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors. These assessments demonstrate at the time of reporting that extraction could reasonably be justified. Ore Reserves are sub-divided in order of increasing confidence into Probable Ore Reserves and Proved Ore Reserves.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

END

DRLFSIFUEFASEDF

(END) Dow Jones Newswires

November 05, 2018 02:00 ET (07:00 GMT)

1 Year Amur Minerals Chart

1 Year Amur Minerals Chart

1 Month Amur Minerals Chart

1 Month Amur Minerals Chart

Your Recent History

Delayed Upgrade Clock