ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

ALTN Altyngold Plc

133.50
5.50 (4.30%)
24 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Altyngold Plc LSE:ALTN London Ordinary Share GB00BMH19X50 ORD 10P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  5.50 4.30% 133.50 132.00 135.00 135.00 129.00 129.00 32,252 16:35:22
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Gold Ores 62.04M 13.23M 0.4841 2.79 36.9M
Altyngold Plc is listed in the Gold Ores sector of the London Stock Exchange with ticker ALTN. The last closing price for Altyngold was 128p. Over the last year, Altyngold shares have traded in a share price range of 80.00p to 136.00p.

Altyngold currently has 27,332,934 shares in issue. The market capitalisation of Altyngold is £36.90 million. Altyngold has a price to earnings ratio (PE ratio) of 2.79.

Altyngold Share Discussion Threads

Showing 6601 to 6624 of 13375 messages
Chat Pages: Latest  271  270  269  268  267  266  265  264  263  262  261  260  Older
DateSubjectAuthorDiscuss
14/10/2020
13:29
Different country too - Apart from that, great info (for someone)
nevgroom
14/10/2020
12:48
This is not Altyn Plc - different company, different region, different mine!
king suarez
14/10/2020
12:32
'Alliance Altyn, part of Russian Platinum Group, said it has shut its Kyrgyzstan gold mine after an attack. The country is facing violent uprisings over a disputed election result. A group of local citizens have tried to enter the production facilities of several gold mines.' This is on Kitco:
caedwalla
14/10/2020
11:53
ODR , absolutely. I have 80,000 TXP, will hold for 3 years and possible £5 share. Ditto ALTYN, when I hope for c. 10p (hold 6 million shares). That will take me to 58 which will do for me. Enjoy current job (Divisional MD , Consultancy Business) but 50 hours/week + travel + delivering £20 million of business takes its toll.
highly geared
14/10/2020
11:46
HG .. Great to see you will be a happy bunny like me today (TXP)

If ALTN and my other explorers / miners take off, I can seriously look at early retirement.

ODR

onedayrodders
14/10/2020
11:40
On an asset value basis , it’s probably the most undervalued listed gold miner. If, over the next 2 years, they improve production to sustainable 80-100k levels and develop open pit mining at TS, I’d expect to see a £250-300 million market cap, this being a combination of operating profit and a mark up on the asset value ( reserves ).
highly geared
14/10/2020
08:30
From Twitter, some good points made, suggests ALTN is cheap
grimreaper2019
13/10/2020
16:30
I can see the original link no problem - shows the mine and dam clearly.
cyberbub
13/10/2020
16:01
Hmm if you just click on the link it just shows your default location / country.

Speaking of satellite maps I see an RNS from Total today, they are planning to use google satellite images to measure up everybody's roofs for solar panels.

If you put the following into google then select maps or click on the first map which is Sekisovka070000, Kazakhstan.

каз;ахl9;та 85; сек;исl6;вк 72;

stonefold
13/10/2020
15:49
Lol

You must live next to me

excellance
13/10/2020
15:47
The link gives a great view - of my house, unfortunately!.I just wonder if authorities have given a newly restricted capacity in the existing dams - pure speculation..CAML went to lengths to list the international consultants working on their TSF4 dam; one wonders what the PI insurance premiums are like......Anyway, we shall soon see if Tailings storage has become a bottleneck as ALTN expand production..Cheers, tightfist
tightfist
13/10/2020
15:24
There is buckets of room in the tailing dams.
The previous google satellite photos showed the northern-most dam as constucted but empty with just the black liner visible.
That dam is by the current photo only part filled.


As the recovery rate is not 100% there is still some gold in the tailings waste.
Maybe someone will invent an economical process to extract it, before using it to refill the old mine/pits.

select satellite view

Link won't work so copy all below into browser.

stonefold
13/10/2020
15:06
they are only saying that

...the "design of the construction" of sec 4 TSF is nearing completion...construction to start Q2 2021

As such, an additional storage facility will be built for stowing over 1.0 mln m3 of tailing solids, which should allow uninterruptible operation of the gold processing plant until 2024.

Furthermore, preliminary design work on the construction of sec 5 of TSF has commenced.

It is expected that this will be commissioned in 2023 which will ensure the continuity in operation of the gold processing plant after 2024.

So, are they are telling us our train is delayed by giving details of the bus they've arranged?

If there is any material unexpected interruptions to production, should they not just tell us, or, in previous RNS's did they not explain that various work programs may cause some disruption?

We will soon see the truth...

excellance
13/10/2020
14:49
7500 would be outstanding!

i doubt it'll be that high, maybe 6500

excellance
13/10/2020
14:47
Must admit also thought a strange RNS even down to the point they say "nearing completion". Why not wait until completed if you really feel the need to announce it.

I do note that they say this will facilitate uninterruptable use of the processing plant so wonder whether there is an underlying message of further patience required in advance of Q3 production.

Soon find out anyway. Hoping for 6-7k sales in Q3.

sloppyg
13/10/2020
12:08
Any long term holder/ follower here will remember Altyns ( then Hambledon Mining) tailings leak into the local Seki river in 2012.. It nearly pushed the company under. Thats when the Assaubayev family stepped in and bought the mine and managed to get the $9.5m fine and charges reduced to a fraction

Quite right that Altyn should be upfront with Tailings work to keep the local community and shareholders informed.

vish65
13/10/2020
10:22
Maybe this RNS is a nod towards Environmental concerns and increasing sensitivity towards Tailings treatment and storage..After the Brumadinho tailings disaster caused 259 deaths in January 2019 adjacent to Vale operations in Brasil, licensing bodies have become more rigorous and accountable. See last month's leakage and clean-up at CAML's SASA tailings facility in Macedonia - also the recent revision to more capital-intensive "dry stacking" at Serabi's new Coringa mine - Scotgold too? These are the ones I happen to have come across..Prudence? Cheers, tightfist
tightfist
13/10/2020
08:24
They are using 2020 to acquire plant and machinery + refurbish the mill + install decline/ shaft ventilation + develop the declines to access higher grade ore.

It is clear that $10 million was needed from the bond issue as part of the above, which is why it was heavily incentivised.

My view is they will need the rest of 2020 for the above to be completed and that 2021 should be the year where we see significant production improvement.

Provided the gold price remains buoyant, we will see good share price appreciation through 2021.

highly geared
13/10/2020
08:18
I think it's a very positive rns.

They are saying they are planning ahead, and we need to massively expand tailing facilities, and this is material evidence of our vision evolving into action on the ground.

I expect we'll see more like this.

excellance
13/10/2020
08:13
Indeed - Production guidance is probably a little way off. Next update is likely to be Q3 production and (perhaps if we're lucky) an indicator for FY (I'm sure some type of crude extrapolation will be possible).

Based on the timing of this year's updates I expect Q3 update around 9th November.

nevgroom
13/10/2020
08:05
Give them time to bed in new machinery which is still arriving and get to some kind of stability. Production guidance will come maybe next year. Providing production grades and recovery improve q on q that will do me for now.
wrighty46
13/10/2020
07:53
Mid October. Small matter of 2020 FY production guidance still not released. Do they have no confidence in their mine plan - assuming they have one? Or the mill standing up to increased production?
stevea171
13/10/2020
07:51
Continued communications ... that's what it means to me
onedayrodders
13/10/2020
07:45
But we knew they were planning a large increase in production. I had already assumed that any related expansion in facilities would be planned and acted upon.
tim000
Chat Pages: Latest  271  270  269  268  267  266  265  264  263  262  261  260  Older

Your Recent History

Delayed Upgrade Clock