ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

88E 88 Energy Limited

0.17
0.00 (0.00%)
25 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
88 Energy Limited LSE:88E London Ordinary Share AU00000088E2 ORD NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.17 0.165 0.17 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Crude Petroleum & Natural Gs 0 -14.44M -0.0006 0.00 0

88 Energy Limited Operations Update (4616M)

21/01/2021 9:52am

UK Regulatory


88 Energy (LSE:88E)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more 88 Energy Charts.

TIDM88E

RNS Number : 4616M

88 Energy Limited

21 January 2021

This announcement contains inside information

88 Energy Limited

Operations Update

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM 88E) is pleased to provide the following update related to its operations on the North Slope of Alaska.

Highlights

   --    Mobilisation of snow road construction equipment to the Merlin-1 drill site has commenced 
   --    Spud of Merlin-1 remains on schedule for mid-late February 2021 

o Targeting independently assessed gross mean prospective resource of 645 million barrels*

   --    Lease AA095899 in the recent Coastal Plain lease sale formally awarded 

Peregrine Drilling Imminent - Mobilisation Underway

Permitting and planning associated with the drilling of Merlin-1 at 88 Energy's Peregrine Project, located in the NPR-A region of the North Slope of Alaska, remains on schedule for a mid to late February spud. Schedule permitting, the Harrier-1 well will commence drilling once operations have completed at Merlin-1.

Mobilisation of snow road construction equipment to the Merlin-1 location has commenced. To date 34 miles of a total 90 miles of the snow road to Merlin-1 have been constructed.

88 Energy is carried for the first US$10m of an estimated US$12.6m total expenditure, in exchange for a 50% working interest in the project, as part of a farm-out agreement (see announcement dated 4(th) December 2020).

* Please refer to the XCD Energy ASX release dated 20 May 2020 for full details with respect to the Prospective Resource estimate and associated risking.

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

Coastal Plain Lease Award

Lease AA095899 was formally awarded, effective 1 January 2021. The lease is considered highly prospective for oil and gas as several prospects on the Central North Slope side of the boundary are interpreted to extend into this area. It is considered likely that a significant portion of these oil pools may be accessed without surface access within the Coastal Plain area.

About Project Peregrine - Imminent Drilling

Project Peregrine is located in the NPR-A region of the North Slope of Alaska and encompasses 195,000 contiguous acres. It is situated on trend to recent discoveries in a newly successful play type in topset sands in the Nanushuk formation. 88 Energy has a 100% working interest in the project that will reduce to 50% post the completion of funding as part of a recent farm-in, whereby 88E is carried on the first US$10m (of an estimated US$12.6m total cost) for the Merlin-1 well.

Project Peregrine and Recent Nanushuk Discoveries

The Merlin-1 well is scheduled for spud in mid-late February 2021 and is targeting 645 million barrels of gross mean prospective resource* to commence immediately following completion of operations at Merlin-1, subject to results from Merlin-1 and weather. Harrier-1 is targeting gross mean prospective resource of 417 million barrels(*) . Harrier-1 is expected to cost US$7m.

* Please refer to the XCD Energy ASX release dated 20 May 2020 for full details with respect to the Prospective Resource estimate, associated risking and applicable Cautionary Statement.

Each of the Merlin and Harrier prospects is located on trend to an existing discovery, in the same play type (Nanushuk topsets). This has de-risked the prospects considerably and resulted in a relatively high independently estimated geologic chance of success.

The below graphics can be found in the pdf version of this announcement available from the Company's website;

   -     Mobilisation to Merlin-1 
   -     Project Peregrine and Recent Nanushuk Discoveries 
   -     Independent Resource Assessment 
   -     Merlin-1 - on trend to large Willow oil field 

Media and Investor Relations:

 
 88 Energy Ltd                         Tel: +61 8 9485 0990 
  Dave Wall, Managing Director          Email: admin@88energy.com 
 Finlay Thomson , Investor Relations   Tel: +44 7976 248471 
 EurozHartleys Ltd                     Tel: + 61 8 9268 2829 
  Dale Bryan 
 Cenkos Securities                     Tel: + 44 131 220 6939 
  Neil McDonald/Derrick Lee 
 

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Dr Stephen Staley, who is a Non-Executive Director of the Company. Dr Staley has more than 35 years' experience in the petroleum industry, is a Fellow of the Geological Society of London, and a qualified Geologist/Geophysicist who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Dr Staley has reviewed the information and supporting documentation referred to in this announcement and considers the resource and reserve estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

UPDFIFEALIILFIL

(END) Dow Jones Newswires

January 21, 2021 04:52 ET (09:52 GMT)

1 Year 88 Energy Chart

1 Year 88 Energy Chart

1 Month 88 Energy Chart

1 Month 88 Energy Chart

Your Recent History

Delayed Upgrade Clock