ADVFN Logo

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

OCO Oroco Resource Corp

0.495
0.005 (1.02%)
28 Mar 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Oroco Resource Corp TSXV:OCO TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.005 1.02% 0.495 0.47 0.50 0.51 0.49 0.51 65,960 20:12:01

Oroco Files Revised Technical Report

22/04/2020 8:06pm

PR Newswire (Canada)


Oroco Resource (TSXV:OCO)
Historical Stock Chart


From Mar 2019 to Mar 2024

Click Here for more Oroco Resource Charts.

VANCOUVER, April 22, 2020 /CNW/ - Oroco Resource Corp. (TSX-V: OCO) ("Oroco" or "the Company") announces that it has filed on SEDAR a revised Technical Report (the "Revised Report") on the core concessions of the Santo Tomas Project.

The Revised Report, entitled "Geology, Mineralization, and Exploration of the Santo Tomás Cu-(Mo-Au-Ag) Porphyry Deposit,", authored by D.A. Bridge, P. Geol., has been filed in response to comments from the British Columbia Securities Commission. Key revisions focused on the format and cautionary parameters around the disclosure of historical mineral resource estimates. There are no material differences between the Revised Report and the original report disclosed in the Company's news release of September 9, 2019. 

A copy of the Revised Report can be found on the Company's website at www.orocoresourcecorp.com or under the Company's profile on SEDAR (www.sedar.com).

Mr. Paul McGuigan, P. Geo., of Cambria Geosciences Inc., a Qualified Person under NI 43-101 and a senior consulting geoscientist to the Company, has reviewed and approved the technical disclosure in this news release.

ABOUT OROCO:

The Company holds a net 61.4% interest in the collective 1,172.9 ha core concessions of the Santo Tomas Project in NW Mexico and may increase that majority interest up to an 81.0% interest with a project investment of up to CAD$30 million.  The Company also holds a 77.5% interest in 7,807.9 ha of mineral concessions surrounding and adjacent to the core concessions (for a total project area of 22,192 acres).  The Project is situated within the Santo Tomas District, which extends from Santo Tomas up to the Jinchuan Group's Bahuerachi project, approximately 14 km to the north-east.  Santo Tomas hosts a significant copper porphyry deposit defined by prior exploration spanning the period from 1968 to 1994. During that time, the property was tested by over 100 diamond and reverse circulation drill holes, totaling approximately 30,000 meters. Based on data generated by these drill programs, a historical Prefeasibility Study was completed by Bateman Engineering Inc. in 1994.

The Santo Tomas Project is located within 160km of the Pacific deep-water port at Topolobampo and is serviced via highway and proximal rail (and parallel corridors of trunk grid power lines and natural gas) through the city of Los Mochis to the northern city of Choix. The property is reached by a 32 km access road originally built to service Goldcorp's El Sauzal Mine in Chihuahua State.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Information

This news release includes certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable Canadian securities legislation.  All statements, other than statements of historical fact included herein, including without limitation, statements relating to future events or achievements of the Company, are forward-looking statements. There can be no assurance that such forward-looking statements will prove to be accurate, and actual results and future events could differ materially from those anticipated or implied in such statements.  Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements.  Readers should not place undue reliance on the forward-looking statements and information contained in this news release concerning these matters.  Oroco does not assume any obligation to update the forward-looking statements should they change, except as required by law.

Cision View original content:http://www.prnewswire.com/news-releases/oroco-files-revised-technical-report-301045563.html

SOURCE Oroco Resource Corp.

Copyright 2020 Canada NewsWire

1 Year Oroco Resource Chart

1 Year Oroco Resource Chart

1 Month Oroco Resource Chart

1 Month Oroco Resource Chart

Your Recent History

Delayed Upgrade Clock