We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
FE Limited | ASX:FEL | Australian Stock Exchange | Ordinary Share |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0.03 | 0.03 | 0.031 | 0.00 | 00:00:00 |
THIRD QUARTER HIGHLIGHTS
Mr Cameron McCall, Executive Chairman of Macarthur Minerals commented:
“The continued strong iron ore price to US$85-$90/tonne range for 62% Fe ore continues to create momentum in the iron ore industry.
The Company’s focus on delivering a high-quality, low-impurity magnetite fines product (+65% Fe) positions this product well for Chinese, Korean and Japanese steel mills that are focused on sourcing quality steel products, enhanced furnace efficiencies, reduced consumption of cooking coal and cleaner environment emissions.
The Company is also very pleased with the proactive approach demonstrated by our Joint Venture partner Fe Limited in the exploration of the Hillside, Strelley Gorge and Panorama tenements in the Pilbara region of Western Australia. Initial exploration of these areas has returned encouraging results from rock chip sampling. Such results include a potential extension of iron ore mineralisation along strike from Atlas Iron’s Abydos operation, and the discovery of high-grade manganese and copper at Hillside. Buoyed by these discoveries, Fe Limited is about to commence a drilling program to test the extent of the copper and gold mineralisation at the Hillside Project.
Delivery and Commercial Team Appointments
Macarthur continues to expand its team as the Company progresses to the next phase of development of its Lake Giles Iron Project with the appointment of Engineering Manager, Geoff Fox. Geoff brings a wealth of experience to the Company with extensive magnetite iron processing experience being responsible as Study and Engineering Manager of Gindalbie’s Karara magnetite mine and process facility in Western Australia. Geoff’s broad mining and processing career, including time spent with Promet Engineering and SNC Lavalin, will be of tremendous benefit, and his proven track record of developing projects through the development life cycle and producing results will be invaluable as we advance the Company's corporate strategy.
Mr Andrew Bruton was also appointed during the quarter in the role of Executive General Manager, Corporate and Company Secretary. Mr Bruton has a long and respected career of over 20 years of top tier professional experience in corporate, mining, energy and infrastructure law. He has been recognised as a leading transactional and project lawyer in the mining and energy sectors in Australia.
In senior leadership roles, Andrew has been responsible for large teams at both State and National levels. He is also an experienced company director.
Having advised major Australian and international mining and energy companies on complex projects, and being a strategic thinker and leader with strong business acumen and a focus on delivering outcomes, he brings a wealth of expertise to Macarthur Minerals.
IRON ORE
During the third quarter, the following key project advancements have been undertaken or have been completed:
The Lake Giles Preliminary Economic Study (PEA)1 rationalised the Ularring Hematite and Moonshine Projects into a combined project resulting in substantial cost savings and efficiencies. The key highlights are summarised in the recent Independent Research Report undertaken by Breakaway Research in October 2019.
With the closure of the Convertible Note financing, as announced on July 10, 2019, the Company is now focused on completing the BFS to support debt funding for project construction.
NON-IRON ASSETS
This year, Macarthur’s primary focus has been on the West Australian Iron Ore assets. To support this strategy, the Company ventured out the gold and lithium tenements in the Pilbara region to ASX listed Australian explorer, Fe Limited (“FEL”). FEL has the ability to earn up to 75% of these Projects through exploration and staged cash payments to Macarthur. During the quarter FEL commenced exploration on the areas and will commence drilling of copper and gold targets at the Hillside Project during the next quarter.
Hillside tenements
As previously announced by the Company on August 23, 2019, rock chip samples collected by FEL’s geological team from the Hillside Project returned strongly anomalous grades for base metals and gold from several locations. In early September FEL conducted follow-up reconnaissance, concentrating on the Hillside Project (E45/4824 and E45/4685). Exploration involved mapping and sampling of the partially outcropping gossan line and outcropping quartz reefs known to host gold mineralisation (from prospector reports).
The gossan line was traced over a 14km strike length with remnant outcrop identified at regular intervals along strike (Figure 1). A total of 36 rock chip samples were collected including 15 from outcropping gossan with several samples containing visible copper minerals such as malachite. Remaining samples were collected from quartz outcrops, many of which returned strongly anomalous gold grades.
The assay results are highly encouraging with eight samples returning copper values over 1% with a peak of 18.8% Cu and often accompanied with elevated gold, silver and zinc values (+/- cobalt). Significant results include:
Exploration at the Hillside Project also discovered high grade manganese mineralisation in sub parallel outcrops to the gossan line sampled above. Rock chips samples returned a maximum of 59.4% MnO (>46% Mn).
Figure 1 – Sample Location Map
A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/a851c13f-f52b-47ba-9387-7b68d6b4d342
Strelley Gorge
During FEL’s recent reconnaissance trip to the Strelley Project in the Pilbara, samples were taken from the outcropping Banded Iron Formation (“BIF”) continuing along strike from the previously mined Abydos iron ore project owned by Atlas Iron (Figure 1).
Two rock samples were taken from iron rich outcropping BIF with both returning significant iron assay results (Table 1).
Table 1 – Sample Locations and Results
STRELLEY | ||||||||||
Rock Chip Assay Results | ||||||||||
Sample | Latitude | Longitude | Al2O3 | Fe | MgO | Mn | P | S | SiO2 | LOI |
% | % | % | % | % | % | % | % | |||
ST002 | 21° 7'33.02"S | 119° 8'14.99"E | 0.72 | 61.3 | 0.01 | 0.047 | 0.012 | 0.034 | 3.97 | 7.39 |
ST003 | 21° 7'30.83"S | 119° 8'15.50"E | 1.38 | 58.11 | 0.05 | 0.099 | 0.152 | 0.008 | 3.6 | 11.21 |
Figure 2. Sample Locations
A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/74c479e5-f1d4-408b-8ac3-a67ed85bbb0e
About Fe Limited
Fe Limited (ASX: FEL) is a listed mineral exploration Company that holds or has rights or interests in various projects and tenements prospective for battery metals, copper, iron ore, gold and base metals located in Australia. The Company is focused on the exploration of battery metal projects. In March 2019, FEL entered into an agreement to acquire the Pippingarra Lithium Project and the Marble Bar Lithium Project (Project) from Mercury Resources Group Pty Ltd. These areas complement the tenement portfolio of Macarthur Minerals, establishing a 1800 square kilometre exploration footprint in the important Lithium and Gold region of Western Australia.
PILBARA HARD ROCK LITHIUM
Macarthur’s Pilbara lithium portfolio covers an area of ~1,281 square kilometers, have regulatory exploration licence approval and cover similar geological settings to that of “world class” Pilbara lithium deposits and producing spodumene mines. These areas are included in the earn-in Joint Venture program that is targeting battery metal deposits. These areas have been added to during 2019 with the lithium potential tenements held by Fe Limited.
NEVADA, USA REYNOLDS SPRINGS PROJECT
Macarthur holds 210 unpatented mining claims at its Reynolds Springs Lithium Brine Project in the Railroad Valley, Nevada, USA. Analysis of geochemical soil sampling found up to 405ppm Li.
Macarthur conducted further review of several historic well logs drilled on the claims and identified numerous conductive, faulted zones that indicate the presence of a brine aquifer.
NEXT STEPS
Macarthur will actively advance, with our key partners, its iron ore assets in Western Australia. Infill drilling of the Moonshine Magnetite deposit is nearing completion with samples submitted to the laboratory. On receipt of assay results, the Company will update the geological model of the Moonshine Magnetite deposits in conjunction with completing a Bankable Feasibility Study of the Lake Giles Iron Project. Further, the Company will work closely with Fe Limited to advance exploration of its high-quality lithium, gold and base metal tenements in the Pilbara region.
ABOUT MACARTHUR MINERALS LIMITED (TSX-V: MMS, OTCQB: MMSDF)
Macarthur is an iron ore development, gold and lithium exploration company that is focused on bringing to production its Western Australia iron ore projects. The Lake Giles Iron Project includes the 80 million tonne Ularring hematite resource (approved for development) and the 710 million tonne Moonshine magnetite resource. Macarthur has prominent (~1,281 square kilometer tenement area) gold, lithium and nickel exploration interests in Pilbara region of Western Australia. In addition, Macarthur has lithium brine Claims in the emerging Railroad Valley region in Nevada, USA.
QUALIFIED PERSON
Mr Ian S Cooper, B.Sc., A.R.S.M., F.G.S. FAusIMM, a Fellow of the Australasian Institute of Mining and Metallurgy (membership number 107348), is a consultant of Macarthur and is a Qualified Person as defined in NI 43-101. Mr Cooper has reviewed and approved the technical information contained in this news release.
On behalf of the Board of Directors,MACARTHUR MINERALS LIMITED
“Cameron McCall”Cameron McCall, Executive Chairman
Company ContactJoe Phillips, CEO and DirectorEmail: jphillips@macarthurminerals.com Telephone: +61 448899247
Website: www.macarthurminerals.com
1 Press Release filed June 17, 2019, titled “Macarthur Files Technical Report for Lake Giles Iron Ore Project”
THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO UNITED STATES SERVICES OR FOR DISSEMINATION IN THE UNITED STATES
Caution Regarding Forward Looking StatementsCertain of the statements made and information contained in this press release may constitute forward-looking information and forward-looking statements (collectively, “forward-looking statements”) within the meaning of applicable securities laws. The forward-looking statements in this press release reflect the current expectations, assumptions or beliefs of the Company based upon information currently available to the Company. With respect to forward-looking statements contained in this press release, assumptions have been made regarding, among other things, the timely receipt of required approvals, the reliability of information, including historical mineral resource or mineral reserve estimates, prepared and/or published by third parties that are referenced in this press release or was otherwise relied upon by the Company in preparing this press release. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and no assurance can be given that these expectations will prove to be correct as actual results or developments may differ materially from those projected in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include fluctuations in exchange rates and certain commodity prices, uncertainties related to mineral title in the project, unforeseen technology changes that results in a reduction in iron ore demand or substitution by other metals or materials, the discovery of new large low cost deposits of iron ore, uncertainty in successfully returning the project into full operation, and the general level of global economic activity. Readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof. Such statements relate to future events and expectations and, as such, involve known and unknown risks and uncertainties. The forward-looking statements contained in this press release are made as of the date of this press release and except as may otherwise be required pursuant to applicable laws, the Company does not assume any obligation to update or revise these forward-looking statements, whether as a result of new information, future events or otherwise.
1 Year FE Chart |
1 Month FE Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions