ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

THR Thor Energy Plc

1.18
0.00 (0.00%)
23 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Thor Energy Plc LSE:THR London Ordinary Share GB00BRJ52319 ORD GBP0.001
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 1.18 1.20 1.30 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Misc Nonmtl Minrls, Ex Fuels 0 -520k -0.0019 -6.58 3.48M

Thor Mining PLC MOLYHIL TUNGSTEN PROJECT - COMPLETION OF DRILLING (9643J)

16/09/2016 7:00am

UK Regulatory


Thor Energy (LSE:THR)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Thor Energy Charts.

TIDMTHR

RNS Number : 9643J

Thor Mining PLC

16 September 2016

16 September 2016

THOR MINING PLC

MOLYHIL TUNGSTEN PROJECT - COMPLETION OF DRILLING

The Board of Thor Mining Plc ("Thor" or the "Company") (AIM, ASX: THR) is pleased to announce the completion and preliminary findings of the exploration drilling program to test for additional tungsten mineralisation satellite to the Company's existing Molyhil tungsten deposit in the Northern Territory.

Highlights

-- Traces of tungsten (37 & 30 parts per million ("ppm")) were recorded by on site XRF analyses from two holes (16MAC013 & 16MAC014) at Cattle Track immediately to the northwest of the existing Molyhil resource.

-- Broad zones of magnetite skarn similar to the Molyhil deposit host rock were intersected at both Think Big and Gap Track (Figure 1).

-- Continuous magnetite skarn was intersected at Think Big in hole 16MRAB056 for 18 metres into bedrock. Preliminary XRF analyses included 6m at 11% iron("Fe") and 1.2% titanium("Ti") from 1.5m depth and 7.5m at 9%Fe and 1.2%Ti from 10.5m.

Mr Mick Billing, Executive Chairman, commented:

"This program consisted of very shallow and very broadly spaced drilling, and we are delighted with the outcome. The immediate next steps will be to schedule additional shallow, but more closely spaced, drilling on the Cattle Track targets to the north east of the Molyhil resource. While the tungsten values are low, these particular holes penetrated no more than four metres below surface and into near surface bedrock. Further follow up work on the Gap Track and Think Big targets is also warranted."

http://www.rns-pdf.londonstockexchange.com/rns/9643J_-2016-9-15.pdf

The Drill Programme

The program comprised 65 short holes up to 18m in depth, drilled to sample bedrock beneath shallow alluvium in five target areas. The targets were selected principally on the basis of elevated magnetic signature depicted in Figure 1 by the warmer colours. While the intention of any drill program is a direct hit of economic mineralisation, given the target size (Molyhil 150m by 50m) and the drill spacing (between 50m and 400m), program success will be achieved if any one, or more, of the many characteristics of the Molyhil deposit are intersected thus substantiating the magnetic targeting and vectoring follow up evaluation efforts.

The program commenced with air-core drilling but reverted to RAB (rotary air blast) after 31 holes due to difficulty penetrating boulders in transported alluvium. While RAB drilling has a greater chance of sample contamination than aircore, this was deemed acceptable due to the reconnaissance nature of the program and the superior penetration of the underlying bedrock. None of the sample analyses will be used for resource estimation.

Cattle Track

The area between the two historically mined Molyhil and the Molyhil Pinnacle lodes has an elevated magnetic signature. Ten aircore holes and three RAB holes targeted this area intersecting a mixture of meta-carbonates, calc-silicates and altered granite. Two XRF analyses returned traces of tungsten (37 and 30 ppm) in holes 16MAC013 & 16MAC014 located within 150m northwest of the Molyhil pit. Follow up drilling by close spaced RAB or shallow RC drilling is recommended across the entire area.

Gap Track

Two aircore and fourteen RAB holes targeted the Gap Track anomaly which comprises an elevated magnetic response extending over 2.7 km with a northwest trend parallel to the regional Mount Sainthill fault zone. The surface cover was a combination of transported sediment up to 10m thick and in-situ weathered Marshall Granite with occasional isolated in-situ weathered remnants of Georgina Basin sedimentary rock.

Beneath the cover and hosted within unaltered Marshall Granite, drilling intersected altered granite similar to that exposed in Molyhil pit and drill core (comprising predominantly orange feldspar, abundant magnetite and epidote) in addition to a core zone of calc-silicate and magnetite skarn. While no significant XRF analyses were obtained, the geology is strongly analogous to Molyhil. Sample assays are in progress but based on the geology, the target warrants follow-up drilling regardless of the assays.

Think Big

Thirteen RAB holes in two north-south traverses cross the northwest trending Think Big magnetic anomaly. The holes were spaced 100m and the traverses 400m apart. Assuming geological continuity between the two traverses, the holes defined a magnetite skarn body hosted in Marshall Granite with preliminary dimensions of 150m to 200m north-south and 400m to 500m along the northwest/southeast trend. Hole 16MRAB056 intersected dark brown to black magnetite skarn from surface (1m of soil cover) to 18m depth. The hole was stopped on drill capacity.

XRF analyses detailed below comprise;

   --     6m at 11%Fe and 1.2%Ti from 1.5m depth and, 
   --     7.5m at 9%Fe and 1.2%Ti from 10.5m. 

Sample assays are in progress and follow up drilling is recommended.

Solar Farm

Nine aircore and one RAB hole were drilled to test a northwest trending magnetic anomaly at the Solar Farm prospect to the immediate north of the Molyhil mineral licence area. A narrow zone of calc-silicate with a few per cent magnetite was intersected within unaltered Marshall Granite. The magnetite explained the magnetic anomaly and while no significant XRF analyses were obtained, the geological setting is analogous to Molyhil and although now of low priority it remains worthy of follow up RAB testing.

Stock Yard

Six aircore and two RAB holes targeted the stockyard anomaly comprising a northwest trending magnetic high to the south of the Molyhil Pinnacle. Holes intersected zones of meta-sediments, coarse micaceous pegmatite, calc-silicate, and magnetite skarn. A trace of tungsten (26ppm) was detected in hole 16MAC026 within 1.5m from surface, otherwise no significant XRF analyses were obtained. Subject to follow up assays this prospect is very low priority for any follow up work.

Three aircore and one RAB were drilled on a magnetic high to the northwest of the Molyhil Pinnacle. The holes confirmed the NW extension of the Pinnacle calc-silicate rocks constrained by Marshall Granite intersected in the northern most hole. No significant XRF analyses were obtained and subject to follow up assays this prospect is very low priority for any follow up work.

The information contained within this RNS is considered to be inside information, for the purposes of Article 7 of EU Regulation 596/2014, prior to its release.

Enquiries:

 
Mick Billing       +61 (8) 7324 1935    Thor Mining PLC    Executive 
                                                            Chairman 
Ray Ridge          +61 (8) 7324 1935    Thor Mining PLC    CFO/Company 
                                                            Secretary 
Colin Aaronson/   +44 (0) 207 383 5100  Grant Thornton UK  Nominated 
 Daniel Bush/                            LLP                Adviser 
 Richard Tonthat 
Gerry Beaney/     +44 (0) 203 862 6625  Northland Capital  Joint Broker 
 David Hignell                           Partners Limited 
 John Howes 
Nick Emerson      +44 (0) 1483 413 500  SI Capital         Joint Broker 
 / 
 Andy Thacker 
Tim Blythe/       +44 (0) 207 138 3222  Blytheweigh        Financial 
 Camilla                                                    PR 
 Horsfall 
 

Updates on the Company's activities are regularly posted on Thor's website, www.thormining.com,

which includes a facility to register to receive these updates by email.

Competent Person's Report

The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Table 1: Selected Provisional XRF results

 
 Hole                                From   To     Interval   Ti    Fe     W ppm 
  ID          Easting*   Northing*                             %     % 
-----------  ---------  ----------  -----  -----  ---------  ----  -----  ------ 
 16MAC013     576903     7483045     0.0    1.5    1.5        0.4   2.6    <10 
-----------  ---------  ---------- 
                                     1.5    3.0    1.5        0.4   4.0    <10 
-----------  ---------  ---------- 
                                     3.0    4.5    1.5        0.4   4.8    37 
-----------  ---------  ----------  -----  -----  ---------  ----  -----  ------ 
 16MAC014     576899     7482999     0.0    1.5    1.5        0.3   2.9    30 
-----------  ---------  ---------- 
                                     1.5    3.0    1.5        0.2   1.9    <10 
-----------  ---------  ---------- 
                                     3.0    4.5    1.5        0.3   2.9    <10 
-----------  ---------  ----------  -----  -----  ---------  ----  -----  ------ 
 16MAC026     576199     7482805     0.0    1.5    1.5        0.2   1.6    <10 
-----------  ---------  ---------- 
                                     1.5    3.0    1.5        0.2   3.4    26 
-----------  ---------  ---------- 
                                     3.0    4.5    1.5        0.3   3.8    <10 
                                     4.5    6.0    1.5        0.3   3.7    <10 
                                     6.0    7.5    1.5        0.3   3.1    <10 
-----------  ---------  ----------  -----  -----  ---------  ----  -----  ------ 
 16MRAB056    574895     7481497     1.5    3.0    1.5        1.0   11.1   <10 
-----------  ---------  ---------- 
                                     3.0    4.5    1.5        1.2   10.7   <10 
-----------  ---------  ---------- 
                                     4.5    6.0    1.5        1.2   11.0   <10 
                                     6.0    7.5    1.5        1.3   11.2   <10 
                                     7.5    9.0    1.5        0.5   6.4    <10 
                                     9.0    10.5   1.5        1.0   7.9    <10 
                                     10.5   12.0   1.5        1.2   9.2    <10 
                                     12.0   13.5   1.5        1.3   9.1    <10 
                                     13.5   15.0   1.5        1.2   8.6    <10 
                                     15.0   16.5   1.5        0.6   7.2    <10 
                                     16.5   18.0   1.5        1.6   11.2   <10 
-----------  ---------  ----------  -----  -----  ---------  ----  -----  ------ 
 *hole co-ordinates provided 
  GDA94 zone53 
-----------------------------------------  -----  ---------  ----  -----  ------ 
 

About Thor Mining PLC

Thor Mining PLC is a resources company quoted on the AIM Market of the London Stock Exchange and on ASX in Australia.

Thor holds 100% of the advanced Molyhil tungsten project in the Northern Territory of Australia, for which an updated feasibility study in 2015(1) suggested attractive returns. Thor also holds 100% of the Pilot Mountain tungsten project in Nevada USA which has a JORC 2012 Indicated Resources Estimate(2) on 1 of the 4 known deposits.

In February 2016, Thor announced the sale of its Spring Hill Gold project(3) for A$3.5million, of which A$1.5 remains due for settlement in February 2017, plus a royalty of:

-- A$6 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for up to A$1,500 per ounce; and

-- A$14 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for amounts over A$1,500 per ounce.

Notes

   --      (1) Refer ASX and AIM announcement of 12 January 2015 
   --      (2) Refer ASX and AIM announcement of 10 June 2014 
   --      (3) Refer ASX and AIM announcement of 29 February 2016 
   --      At the date of this announcement gold is trading at approximately A$1,760/oz 

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLLLFLLASIELIR

(END) Dow Jones Newswires

September 16, 2016 02:00 ET (06:00 GMT)

1 Year Thor Energy Chart

1 Year Thor Energy Chart

1 Month Thor Energy Chart

1 Month Thor Energy Chart

Your Recent History

Delayed Upgrade Clock